Stair Tower
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 Metric Tons kg
- Supply Capability:
- 9000 Metric Tons per Month kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details OF Stair tower
Place of Origin: China (Mainland)
Brand Name: CMAX
Model Number: CMAX
Material: Q235,Q345
Surface: Black, Hot dipped galvanized, HDG
Size: Different size
Type: According to clients request
Pipe: 48X3.2mm, 2.75mm, 2.5mm; 60.3mm, etc
Use: in residential, industrial, restoration,etc
Standards: NZ/AU , Layher
Marketing: worldwide
Standard: 1-4mtr
OEM: Available
Packaging & Delivery OF Stair tower
Packaging Detail: suitable for sea transportation
Delivery Detail: Within 10-25 days after receive the L/C or Deposit
Specifications OF Stair tower
scaffolding tower
1. Pipe: 48x3.2, 2.7mm, etc
2. Surface: Hot dipped galvanized
3. No loose parts
4. ISO9001
The structure of ring-lock stair tower is the same as ring lock scaffolding.The dimension of cross section is 1500*3000mm.It is widely used in construction.
CHARACTERISTICS OF Stair Tower
Bearing capacity of stair tower:
The stair tower can be erected with the maximum height of 150m,when attached to the wall every 4.5m.
Standard components
PROJECT APPLICATION
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
1. Manufacturer Overview |
|
---|---|
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Stair Tower
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 Metric Tons kg
- Supply Capability:
- 9000 Metric Tons per Month kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords