• CMAX 06 Rotary drilling rig  for Sale on OKORDER High Tech System 1
  • CMAX 06 Rotary drilling rig  for Sale on OKORDER High Tech System 2
  • CMAX 06 Rotary drilling rig  for Sale on OKORDER High Tech System 3
CMAX 06 Rotary drilling rig  for Sale on OKORDER High Tech

CMAX 06 Rotary drilling rig for Sale on OKORDER High Tech

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing



 

A solution to problems with cast-in-place pile construction of 400~600m housing construction

Easier transportation, lower cost and higher efficiency
Tianyuan Jingang rotary drilling machines could be transported together with the drilling stems. Particularly, SWDM04/06 could be transferred using an ordinary carrier vehicle, thus reducing cost and increasing efficiency for users.

High stability and anti-tipping capacity
Arranging the main and auxiliary winches at the lower end lowers the center of gravity of the drilling machine during operation and transportation, and improves the stability of the complete machine. The steel wire rope is used to hoist the drilling stem and drilling rigs directly through the goose head pulley. This can prolong the service life of the steel wire rope.
Compact, flexible and highly maneuverable
Compact machine body ensures a satisfactory passage capacity and can accommodate pile pore construction in narrow space. It is a truly buster at the construction site.


Stable and reliable

Special chassis
The self-made special hydraulic flexible chassis structure suitable for the actual load is adopted. Meanwhile, the main and auxiliary winches are installed on the rotating platform, which remarkably reduces the tipping load and guarantees the stability of the complete machine fundamentally.
The position of the gravity center of the complete machine is optimized, with the stability angle increased from 10° to 15°. This guarantees operation stability on all dimensions of 360°.


Square-shaft casing structure
The box type square shaft casing structure is used for the mast deflection seat. The force of mast is directly transferred onto the trolley traveling mechanism, thus eliminating the stress of the rotary frilling force on weak links of the deflection seat and improving the structural stability and reliability.
Mast structure 
The high-strength anti-deform design is used for the drilling stem. The rectangular mast section is even wider on the guide rail direction. This can effectively reduce the structural stress of the mast and make it more suitable for the in-rock construction conditions with high-strength variable and constant load.
Winch
The main and auxiliary winches are installed on the platform, which greatly reduces the tipping torque of the operation device and the revolving inertia of the upper part of the platform and improves the stability of the complete machine.
Auxiliary landing leg
The standing leg hidden below the lower mast can not only act as the auxiliary support for drilling construction, but can also help you with other unimaginable matters.

 

High-grade configuration ensures high efficiency
The efficient and reliable engine is equipped with efficiency hydraulic transmission system, and this guarantees the strong power of the machine. The advance intelligent electronic control system can give full play to the efficiency of the machine. Meanwhile, the reasonable local structural design noticeably reduces the wearable and consumable.

Complete machine system
The engine of world-well-known brand is equipped with high-efficiency hydraulic transmission system. The advanced intelligent electronic control system can give full play to the efficiency of the machine. The complete machine system boasts advantages such as high reliability, fuel economy and high reserve power. The engine emission meets the European EPAC3 standard, which means the engine is environmental friendly. In addition, it can operate regularly even in alpine and high-altitude areas.
Power head
The compact machine has a large-torque power head and boasts high speed. This ensures high construction efficiency.

Hydraulic elements
The hydraulic system has been developed in joint efforts with a world first-class element manufacture to improve the hydraulic energy conversion rate of the element and reduce the transmission loss of pipelines of the system.


ModelUnitSWDM04
Machine Heightm12.66
Machine Weightt22
Max. Drilling DiameterDrill Bucket Methodmm1000
Max. Drilling Depthm20
EngineBrand
ISUZU
Model
AA-4BGITCG-04
Rated powerkW/rpm89/2200
Hydraulic SystemMax.working pressureMain pumpMPa34.3
Auxiliary pumpMPa/
Max.oil flow rateMain pumpL/min2×139
Auxiliary pumpL/min/
Rotary HeadMax. torquekN.m60
Revrpm8~35
in-off speedrpm/
Crowd SystemMax. crowd pushkN100
Max. crowd pullkN120
Max. strokemm3000
Main WinchMax. crowd pullkN80
Max. line speedm/min72
Auxiliary WinchMax. crowd pullkN45
Max. line speedm/min13
Mast InclinationLeft and Right tilt°±3
Forward tilt°5
UndercarriageMax. travel speedkm/h3.2
Max. grade ability°15
Overall width of crawlemm600
Extendable crawler widthmm2600
Width of track shoesmm3745
Grounding pressurekPa61.11





Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


Others

1.Reply your inquiry in 24 working hours.
2.Experienced staffs answer all your questions in professional and fluent English.
3.Customized design is available. OEM is welcome.
4.Exclusive and unique solution can be provided to our customer by well-trained and professional engineers and staffs.
5.Special discount and protection of sales area provided to your distributor.
6.Do the best reliable heavy-duty single drum vibratory road roller in China.
7.Warranty period is 1-year or 1500 working hours against Bill of Lading.


Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.


e. To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.

Before sales

Research market with customers; provide technical advice, customized design and production.

 

f. On sales

Always communicate and adjust of design with customer to ensure the product satisfy all requirements.

After sales

Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.

g. Value added services

Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.

Provide high quality and lower price components.

Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.

 

Q: What's the difference between a track type diesel pile driver and a crawler diesel pile driver?
1) Gu MingsiyiTrack type diesel pile driver: the pile machine moves along the track; the caterpillar type diesel pile driver is driven by the chassis track
Q: How many piles can a small pile driver hit in a day?
See you hit the big pile, 600 5 meters deep as long as 5 minutes, 1.2 meters high 5 meters deep as long as 20 minutes, without concrete words, you can calculate according to the time
Q: How many prestressed concrete pipe piles can a pile driver hit in a day?
The degree of proficiency of your worker has something to do with geology. Normally, it's about 400 meters a day.
Q: Mechanical piling machine about how much money?
Hello, impact pile driver, down fourteen, fifty thousand! I am the engine hand. Contact me if you need me! I can also give you a staff officer for a rig
Q: Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q: What's the difference between a pile driver and a boring pile driver?
Piling is the use of static or direct impact into a precast pile;Bored pile is the first hole, reperfusion. There are cement mixing pile, powder injection pile, CFG pile and gravel pile and so on.There are many piles in the building and the large pile foundations such as bridges are bored piles. Cement mixing pile, powder spraying pile, CFG pile and gravel pile are used for soft foundation treatment.
Q: What are the types of hammer pile drivers?
There are diesel tube pile driver, power source brand, Zhong Zhong brand, and Zhejiang is very popular guide rod hammer
Q: What's the profit of a pile driver for a day at the site?
(piling machine, personal advice or buy a wylong they do a professional piling installed this piece, there must be protection of key customer service quality, considerate service, what problems can timely door-to-door service, this point is very important). To goods than three, can not blindly pursue cheap, otherwise it is easier to lose than gain. To pursue a low in the high quality, cost-effective high is really good.
Q: Why should the pile foundation be excavated after the pile driving?
It is convenient to measure and locate the center of the pile, and also facilitate the approach of the piling machine
Q: How many small pile drivers are there in Hunan? It's best to have the exact location
Hunan small piling machine manufacturers or a lot, like Hunan wylong machinery should be more excellent in mechanical industry.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords