• 6T Construction Machinery Tower Crane Price with Specification System 1
  • 6T Construction Machinery Tower Crane Price with Specification System 2
  • 6T Construction Machinery Tower Crane Price with Specification System 3
6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of 6T Construction Machinery Tower Crane Price with Specification

1,The tower crane is advanced in parameters,

2,reliable in performances,

3,beautiful in appearance,

4,high in quality,

5,simple in structure and easy in operation.

6,It is equipped with advanced safety devices and is easy for repair and maintenance, safe for use and reasonable in pricing, for which it has become an ideal choice for many construction enterprises.

Main Features of 6T Construction Machinery Tower Crane Price with Specification

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification

6T Construction Machinery Tower Crane Price with Specification



Tower crane Specifiction

6T Construction Machinery Tower Crane Price with Specification

FAQ of Tower Crane 6T Construction Machinery Tower Crane Price with Specification

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: ok, how do you make a paper crane. i've totally tried with a direction and marked paper, but that didn't work out. by the time i gave up the paper was all smooth cuz it was so worn. anything would help, links, step-by-step instructions, both. whatever. 10 pts to whoever tells me, and i succeed. sweet
wow, you must be refering to origami I can not help with this one but you can go to the library tomorrow and look it up (NOTE: this is neither joke or riddle see if there is a more appropriate place for this like arts and crafts )
Q: what do sand-hill cranes eat-as far as planting a food source for them?
Cranes eat fish so unless you know of a fish plant, I would put in a large pond with fish.
Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q: How much height should tower crane work at M?
Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q: I saw a picture of a oragami crane ring that was made out of money on a website but it diddint have any instructions on how to make it. I can already make the regular ring, but i would really like to try to make the crane ring does anyone know of any website that has instructions on how to make it??
I okorder /
Q: What tower cranes are used on the 30 storey house?
According to the weight and the lifting range in order to determine the size of the tower crane tower crane lifting moment! Size to measure the lifting torque maximum weight * maximum weight of the amplitude of.QTZ63 represents 63 tons - meters, general building does not involve carrying heavy, almost 63!
Q: You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
The cranes are built in the elevator shafts and moved up as needed during work progress.
Q: My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
Q: What category is a Crane bird?
Order GRUIFORMES Family GRUIDAE Not sure where you live...but there are only 2 species of Crane that live in the U.S. : the Sandhill Crane and the endangered Whooping Crane.
Q: Are sandhill cranes edible?
yeah, but they are a little tough and taste sort of like Mexican Spotted Owl

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords