TC6013 Tower Crane 6T
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
· Customer can tell Masan the detailed specifications and Masan can make the suitable products for customers.
· Manufacturing Year: 2014
· Jib Length: 60m
· Free Height Under Hook: 45m
· Max. Load: 6T
· Tip load: 1.3T
· Mast Section Dimension(m): 1.83x1.83x3
· Hoisting Speed(m/min) & power: 8.5/40/80 24Kw
· Slewing Speed (r/min) & power: 0~0.8 2x4Kw frequency
· Trolleying Speed (m/min) & power: 43.7/21.7 3.3/2.2kw
· Cable specification: 3x16+2x10
· Power Supply: 400V(+6% -10%)50HZ
- Q: Yesterday around 9pm I saw a crane fly flying around my living room so I got a pillow and threw it over it. Sadly it found a way to get out cause when I was going to the bathroom I saw it right by the tub and I ran out. Those things are always trying to fly to me. Anyways there attracted to light or whatever so I just turned off the light in the bathroom and living room, and shut the door! I heard my sister later in the night go in there but idk if she saw it or not. So should I just go to the bathroom or wait till my sis goes in there?!
- Crane flies are totally harmless. Don't worry about it.
- Q: Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
- There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley.
- Q: I saw a picture of a oragami crane ring that was made out of money on a website but it diddint have any instructions on how to make it. I can already make the regular ring, but i would really like to try to make the crane ring does anyone know of any website that has instructions on how to make it??
- I okorder /
- Q: Operation points of tower crane (tower crane)?
- Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
- Q: Which Kung Fu influenced Shotokan, Shito-ryu and Shorin-ryu?
- White Crane, Whooping Crane*, Hsing/Xing Yi, Shaolin Monk Fist*, are all 'known' influences of Okinawan martial arts. However it should be noted that there are over 1,000 years of contact between the Ryukyu islands and China starting in the late 600's*. So there are many, many possible influences of Okinawan martial arts. Goju Ryu was heavily influenced by White Crane, namely because of Xie Zhongxiang (Ryuru Ko) who taught Higaonna Sensei his altered system of Whooping Crane Kung Fu. Goju Ryu was also influenced by Shaolin Monk Fist, and Baguazhang, when Miyagi Sensei spent his time in China in the Fuzho Province (also Fujian). The linear style that you are looking for comes from the Shaolin influence. There's a great person to ask any questions on Goju Ryu on here. His sn is nwohioguy, and he is quite knowledgeable. EDIT - To satisfy your hunger for the Tiger Style and it's involvement in Karate's development, I will offer this. Tiger was a style taught at the Shaolin Temple so it may have some influence. Even though many different styles have had influence throughout the years, the most notable are the White Crane of Shaolin and Hsing Yi. Shotokan is of similar origins as Goju Ryu with Sokon/Bushi Matsumura studying White Crane as well in China, and Ankoh Itosu studying under him. Those two trained Gichin Funakoshi who formulated Shotokan from that while in Japan. EDIT - Yup, I'd have to second Shihan J about Okinawan Karate being influenced by more than just China. (I left it only in the China realm because that was your focus, but there was a lot going on to influence the growth of that area.)
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: why was the japanese crane hunted for its plumage in the 20th century?
- At okorder /
- Q: What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
- As for the reasons, the main consideration is the actual needs.
- Q: I have found crane fly larvae on my kitchen floor in the middle of the night. Were are they coming from? How do I get rid of them?
- probably not larva of crane fly...they live in the soil outside. Describe or post a pic what you have
- Q: Like I know he's the head gamemaker, but i mean seriously, madge is MUCH more important than him. i know he let k/p live, but still......madge did more than him?
- (Well Seneca Crane plays a big part in Mockingjay (Book 3). He's also the one that saves Katniss in the end of Catching Fire (Book 2). If you haven't read the last 2 books yet I would seriously recommend it before you see the movie. But yeah I'M SO EXCITED FOR THE MOVIE! XD) WAIT! Sorry scratch that. Seneca Crane was executed for letting both Peeta and Katniss live. Yeah that's right. Don't listen to what I wrote above. It's late and I'm tired... XD
Send your message to us
TC6013 Tower Crane 6T
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords