• Competitive Price 6t Climbing Building Construcion Tower Crane System 1
  • Competitive Price 6t Climbing Building Construcion Tower Crane System 2
  • Competitive Price 6t Climbing Building Construcion Tower Crane System 3
  • Competitive Price 6t Climbing Building Construcion Tower Crane System 4
Competitive Price 6t Climbing Building Construcion Tower Crane

Competitive Price 6t Climbing Building Construcion Tower Crane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
6
Maximum Lifting Height(M):
200m
Rated Loading Capacity:
6
Span:
60
Rated Load Moment:
60

Product Description:

The 6t climbing building construcion tower crane construcion tower crane in china features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system.

Main Product Features:

1.       Widened equipment capacity and working scope.

2.       Suitable for the groups of tower cross framework.

3.       Noise relief stability with and combination amplitude range.

4.       Can sustain height adjustment for occasional exceptional height construction procedures.

5.       Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Product Specifications:

Minimum Order Quantity:

1 set

Unit:

set

LoadingPort:

Chinamain port

Supply Ability:

1000 set/month

Payment Terms:

TT OR LC

Package:

set

 

 

 

 Product Images:

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

tower crane Specifiction

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


Q:Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
They used a helicopter to break out of prison. Breakout with Charles Bronson and Robert Duvall (1975)
Q:a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
work done(W) is given by the change in the potential energy(P.E). here, initial P.E = 0. final P.E = mgh = (500)(10)(20) = 100000 J =100 KJ (kilo joules) therefore work done = 100 KJ. here distance means vertical height.But if the crane takes the load parallel to the ground ,then work done will be zero.Time is given here to calculate the power of the crane given by work/time = 10 KW(kilo watts).
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
315, 40 months rent about more than 10000, some have the strength to buy ah, rent two years is enough to buy one. Ha-ha
Q:ok. soooo.i've got this essay.and i'm stuck.all because i can't figure out the poetic form of War is Kind.help??its only the first five stanzas.Do not weep, maiden, for war is kind. Because your lover threw wild hands toward the sky And the affrighted steed ran on alone, Do not weep. War is kind. Hoarse, booming drums of the regiment, Little souls who thirst for fight, These men were born to drill and die. The unexplained glory flies above them, Great is the battle-god, great, and his kingdom -- A field where a thousand corpses lie. Do not weep, babe, for war is kind. Because your father tumbled in the yellow trenches, Raged at his breast, gulped and died, Do not weep. War is kind. Swift blazing flag of the regiment, Eagle with crest of red and gold, These men were born to drill and die. Point for them the virtue of slaughter, Make plain to them the excellence of killing And a field where a thousand corpses lie.???
War Is Kind Stephen Crane (1899) Do not weep, maiden, for war is kind, Because your lover threw wild hands toward the sky And the affrighted steed ran on alone, Do not weep. War is kind. Hoarse, booming drums of the regiment, Little souls who thirst for fight, These men were born to drill and die. The unexplained glory flies above them. Great is the battle-god, great, and his kingdom-- A field where a thousand corpses lie. Do not weep, babe, for war is kind. Because your father tumbles in the yellow trenches, Raged at his breast, gulped and died, Do not weep. War is kind. Swift blazing flag of the regiment, Eagle with crest of red and gold, These men were born to drill and die. Point for them the virtue of slaughter, Make plain to them the excellence of killing And a field where a thousand corpses lie. Mother whose heart hung humble as a button On the bright splendid shroud of your son, Do not weep. War is kind!
Q:How many meters does the tower crane installation height require expert proof?
The mounting height of the tower crane is determined by the manufacturer's manual,It has nothing to do with experts,After the tower crane is installed, it needs to go through the provincial construction quality and safety supervision station, and the designated testing institution will meet the technical requirements of the production plant, and the method can be used only after the use of the permit.
Q:who has played their respective character the longest ? i'm pretty sure it's kelsey grammer but was hoping to get a few responses.
Kelsey Grammer has played Dr. Fraiser Crane for 20 years... 10 years on Cheers and 10 years on Fraiser....(1984-2004) Belzer has played Detective Munch for 15 years...(1993-2008)
Q:Since now everyone will know what's coming when you get in the crane kick position, and the element of surprise is gone, has the crane kick become an extinct move? Do martial arts experts not like the Karate Kid for ruining the crane kick in the way magicians don't like other magicians who reveal their secrets?
Very few people have any idea whatsoever how the crane kick is applied. It is no way portrayed accurately in the movie. Anyone in the world with any modicum of common sense should be able to figure out intuitively you don't just stand on one leg and wait for some one to get close enough to hit. The crane kick has several applications and they are all in motion during specific sets of circumstances. I see no reason to start educating the world on how crane kicks are actually applied. If you want to learn go find a White Crane style instructor.
Q:tnx for answering :)
A girl named Sadako heard about a tale that tells if you folded a thousand paper cranes, you get one wish.
Q:ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q:my yard is infested with crane flies. Help please.
It's impossible to think of an insect more harmless than a crane fly. Enjoy them.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords