Air Duct Balancing

Hot Products

FAQ

Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
HVAC Heating: What are the main components of the air distribution system?
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
From the outside: ① rigid waterproof casing is only composed of steel casing and wing ring, simple structure; ② flexible waterproof casing mainly by: flange casing, seals, flange pressure plate, wing ring, bolts, nuts Composition, complex structure From the waterproof performance up to choose: ① rigid waterproof casing is outside the wing (ring made of steel ring on the steel pipe), installed in the wall (mostly concrete wall), for the general pipe wall, ; ② flexible waterproof casing in addition to the external wing ring, the internal file ring and the like, the flange wire, there are sets of sales, but also their own processing, for the need for shock absorption pipeline, such as and pump connected When the pipe is through the wall In other words, if the wall on both sides of the waterproof performance, it is necessary to use flexible waterproof casing; if only to consider the pipe through the wall, without considering the wall, the wall on both sides of the waterproof performance and displacement of the pipeline deformation You can use rigid waterproof casing
Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Air conditioning ventilation when the sound is a big reason
Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15