Cable Duct
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Meters m
- Supply Capability:
- 300 Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.The certification:
1).CE of Europe: EN 60947-1:l2007 (CLAUSE 7.3,8.4), class of fire proofing, little smoke and halogen, no firing encounter fire, good in fireproofing and insulatio
2).Wiring Duct RoHS
2.Material:Made from hard PVC, low halogen material, rigidity PVC, environment protecting, no pollution, no lead, no venomous matter.
3.Work temperature: -25degree-75degree, 85degree of standing high temperature
4.Struction: Made up of duct bottom and lid
5.Feature: be made of bottom and cover, there are thread holes in the bottom.
6.Length: 2.5m
7.Color: All colors are available.
8.Application: Used in stage, electric apparatus, air conditioning or indoors.
9.Using method: fix the bottom first, put thread in it, then cover
10.Characteristic:
1,combined strongly, no taking off, smoothness of the surface, no hurting hands and mangling the thread nearby.
2,hard to break, color changing, distortion under the temperature of 70 degree.
3,low thread hole, easy combination, take down simply, easy wiring,
4,no thread hole and airproof, dust protecting, mouse protecting, suit to construction and factory.
- Q:My house's wire, outside the line, the old building, about ten centimeters away, no threading, directly wiped in the cement, the new line, I would like to know do not have to wait for the cement and then closing the electricity, otherwise there will be problems , In a wire directly put in the cement need to pay attention to what? Questions added: I said to use copper wire they say are installed more aluminum
- Broadband digital TV without signal, turn on the TV and set-top box:
- Q:Home improvement of the threading tube is not long how to pick up
- Is the ordinary line nose, the end of the head that is the last connector with the wire connected to the socket, but the cable is thicker than the wire, can not directly access, had to use a special connector, common name line nose.
- Q:Self - built housing, frame structure. Hydropower will do their own, but buried this piece is not proficient. The lighting horizontal pipe is sure to be embedded in the roof of the concrete in the cast-in-place. But whether the socket must be embedded in the concrete pouring layer? Or can the main project completed, embedded in the floor leveling mortar layer, or buried in the mortar under the brick? More
- As long as the TV supports HDMI is no problem, and the effect of super-trough slotted off the gossip coupons, the HDMI output of the DVD is connected to the input port of the TV. And then set the DVD and TV output input to HDMI (some TV and DVD can be automatically identified, if not automatically recognized through the menu set their own).
- Q:What is the meaning of the wire tube under the water pipe?
- The wire is best to wear hose. Hose hardware stores have, fiber tube. Can immediately use the power. Note that the installation of leakage protection switch, do not damage the insulation layer. Wire model selected: BVR, specifications selected one.
- Q:What is the material connecting the pvc threading tube to the switch box?
- Has been running in the copper core or aluminum core are possible; new to install, of course, is to buy copper core.
- Q:JDG line and KBG what is the difference?
- KBG for the buckle-type galvanized thin-walled wire tube, the connection is with the buckle pliers, the pipe and pipe pieces out of the pit, close connection
- Q:Which heroes know PVC pipe 6 points and 4 points which big?
- In addition, most of the rooms are now taking the dark line, that is, in the wall trench wiring, there will be no serious consequences, if you are afraid of cracks, scraping ingredients to be proportional to the OK, and then ask questions I'm oh
- Q:Q: Can the reinforced concrete column inside the stand pipe (threading pipe)?
- Need a liquid crystal display, a screwdriver, you need to pay attention to the demolition will be installed back ~ Oh you want MOD transformation I certainly do not oppose, DIY a liquid crystal display is not realistic. Although the market can buy panels, but the circuit and power it?
- Q:Strong power and weak wiring pipe network is together why?
- reward - reward is a dog favorite to accept a training method
- Q:In the decoration works, design drawings often appear, TC line laying, SC line laying. Not only this 2 midline tube in the end there are those differences? The More
- The basic way of training dogs includes reward, punishment, induction, and compulsory
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China |
Year Established | 2008 |
Annual Output Value | Above US$100 Million |
Main Markets | 20.00% Domestic Market 20.00% Africa 20.00% South America 10.00% Eastern Asia 10.00% Mid East 5.00% South Asia 5.00% Central America 5.00% Eastern Europe 3.00% Southeast Asia 2.00% Western Europe |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen,SHUNDE,GuangZhou |
Export Percentage | 71% - 80% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese, Spanish, German, Arabic, Russian |
b)Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | Average |
Send your message to us
Cable Duct
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Meters m
- Supply Capability:
- 300 Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords