Aluminum Flexible Duct For Ventilation
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 200000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Flexible Duct & Flexible Air Duct (Sigel Layer&Double Layer)
For Ventilation& RefrigerationWith High Quality and Competive Price!
Introduction
FlexibleDuct is widely used in Heating, Cooling, and AirConditioning (HVAC) systemsfor air ventilation applications.
Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run around and through obstacles in the building.
Flexible Duct Structure:
It is a multi-ply aluminum ducting with high tensile steel wire helix.
Double-layer aluminum foils +1 layer of PET film or single layer aluminum foil+ 1 layer of PET film.
Flexible Duct Usage:
1.Ventilation system, Extraction of solvents, Extractionof corrosive gas and fumes
2. Low pressure application, Transfer of hot and cold air, Air conditioning
3. Vehicle construction, Engine construction, Exhaust fumes extraction
Flexible Duct Specifications:
1.Multiply aluminum and pvc laminated
2. High flexible and compressible
3. Flame resistant & Heat resistant
Flexible Duct Features:
1.It's a range of fully flexible uninsulated aluminum PVC laminated ducting, it is easy to connect to ducting
2. Highly flexible
3. Excellent resistance to chemicals
4. Small bending radius
Flexible Duct Advantages:
1.No need special tools for cutting
2. In case of fire no toxic gas are emitted
3. The product have been successfully tested for fire resistance
4. Can be bent in any direction
Different sizes areavaible as required!
- Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
- Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
- Q: Air to water heater host and air conditioning host is not the same
- This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
- Q: Air conditioning ventilation when the sound is a big reason
- No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
- Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
- Can be small, according to your roof to do what material.
- Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
- The general level of more than 12 layers when you need to use.
- Q: Air conditioning machine work when the sound is too much reason
- Color steel plate, refers to the color coated steel plate, color coated steel plate is a kind of organic coating with steel plate
- Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- 2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
- Q: Ventilation is very good, why still have to install fresh air system
- Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
- Q: HVAC Heating: What are the main components of the air distribution system?
- Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Send your message to us
Aluminum Flexible Duct For Ventilation
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 200000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords