• Aluminum Flexible Duct For Ventilation System 1
  • Aluminum Flexible Duct For Ventilation System 2
  • Aluminum Flexible Duct For Ventilation System 3
  • Aluminum Flexible Duct For Ventilation System 4
Aluminum Flexible Duct For Ventilation

Aluminum Flexible Duct For Ventilation

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
200000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Flexible Duct & Flexible Air Duct (Sigel Layer&Double Layer)

For Ventilation& RefrigerationWith High Quality and Competive Price!


Introduction


FlexibleDuct is widely used in Heating, Cooling, and AirConditioning (HVAC) systemsfor air ventilation   applications.

Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run around and  through obstacles in the building.


Flexible Duct Structure:


It is a multi-ply aluminum ducting with high tensile steel wire helix.


Double-layer aluminum foils +1 layer of PET film or single layer aluminum foil+ 1 layer of PET film.



Flexible Duct Usage:


1.Ventilation system, Extraction of solvents, Extractionof corrosive gas and fumes

2. Low pressure application, Transfer of hot and cold air, Air conditioning

3. Vehicle construction, Engine construction, Exhaust fumes extraction


Flexible Duct
Specifications:

1.Multiply aluminum and pvc laminated

2. High flexible and compressible

3. Flame resistant & Heat resistant


Flexible Duct
Features:

1.It's a range of fully flexible uninsulated aluminum PVC laminated ducting, it is easy to connect to ducting

2. Highly flexible

3. Excellent resistance to chemicals

4. Small bending radius


Flexible Duct
Advantages:

1.No need special tools for cutting

2. In case of fire no toxic gas are emitted

3. The product have been successfully tested for fire resistance

4. Can be bent in any direction


Different sizes areavaible as required!







Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q: Air to water heater host and air conditioning host is not the same
You can try asphalt! Is the kind of paving the way! Very useful!
Q: Air conditioning ventilation when the sound is a big reason
No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q: Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Polystyrene should not be polycyclic aromatic. Polycyclic aromatic groups generally refer to aromatic groups when multiple benzene rings are used. Not all of the hydrocarbon chemical products are carcinogenic, and our bodies are producing hydrocarbon compounds all the time. Polystyrene carcinogenicity is small. General benzene ring on the more substituents, the toxicity is relatively small, such as toluene is less than the toxicity of benzene. Of course, there are many compounds with benzene ring, so there are a lot of scholars to study with our body creatures do not meet the quality of raw materials to do the polymer, such as lactic acid production of polylactic acid, but the current Can be put into use much.
Q: HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords