Fire Resistant Aluminum Flexible Air Duct
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Fire Resistant Aluminum Flexible Air Duct
Introduction
This type of duct is made of reinforced aluminum foil coating.The inner part is filled with highly tensile spiral steel wires to support the duct.It is generally applied on low to medium air velocity with temperature variation system.This product has passed GB8624B1 fire resistant test.
Specification Description
Thickness of aluminum foil | 0.0065mm |
Thickness of PET | 0.012mm/0.015mm |
Density of cotton | 16kg/m3;20kg/m3;32kg/m3 |
Thickness of cotton | 25mm |
Diameter of steel wire | 0.8mm/1.2mm |
Glue | hot melt adhesive /polyurethane |
Caliber | 4"~20" |
Package | Box/bag |
Length | 6m/10m |
Technical Target
Operating temperature range | -30oC~140oC |
Max air velocity | 30m/s |
Max operating pressure | 2500pa |
Meltingpoint of hot melt adhesive | 130oC |
Parametric Table
Number of plies | Max operating temperature | Materials |
Single ply | 120oC | single-ply aluminum foil and single-ply PET film compound |
Double plies | 140oC | single-ply PET to place in double-ply aluminum foil |
Four plies | 220oC | Doulble plies of single-ply aluminum foil |
Six plies | 250oC | Double plies of double-ply aluminum foil |
We are pleased to supply products according tothe requirement of our clients!
Production Flow
- Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
- Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic
- Q: Air to water heater host and air conditioning host is not the same
- Issued a test report, Detection can be used to pass, failed to use!
- Q: Air conditioning ventilation when the sound is a big reason
- According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
- Q: Air conditioning machine work when the sound is too much reason
- Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
- Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- 2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
- Q: Ventilation is very good, why still have to install fresh air system
- You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Decoration refers to the home improvement part, housing construction is the content of the building
- Q: HVAC Heating: What are the main components of the air distribution system?
- Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Send your message to us
Fire Resistant Aluminum Flexible Air Duct
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords