Road Roller BuyST152JRoad Roller at Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Name: ST152J Road Roller
Parameter:
Advantages:
state-owned company
fortune 500 company
AAcustom
Why choose us?
1 sincre
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to solve all your tower crane installation and other questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s tower crane have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
- Q:Let me have some never played roller! 10 years 22 tons for 22W mountain people think? What are the disadvantages of this roller?
- The roller is very delicate at the mountain, but this machine is good, but 10 years machine 220 thousand is indeed a little expensive, very good quality also cost less than so much money, 15-18 million can be considered
- Q:Who knows, what is the best way to press the water stable?
- The current widespread use of single steel wheel roller compaction water stability, but if the water layer thickness is less than 25cm, you can use the double steel wheel Dynapac compaction, compaction mode with low frequency and high vibration, the efficiency is doubled.
- Q:Why should we use the rubber tyred roller in the construction of the asphalt pavement?
- At present, the latter two are widely used in construction.The following is a steel wheel roller, which is in front of the paver. The following table shows two rubber tyred rollers. Roller's purpose: 1. to achieve the required density (usually controlled by compaction); 2. press out the smooth surface.General compaction includes initial pressure, re pressure and final pressure. The final pressure is to remove the traces of rollers, the road is kept smooth, generally can not be omitted, and the use of steel wheel roller. If the initial pressure can meet the density requirements, there is no need to re pressure, but generally still maintain these three steps.
- Q:Roller cylinder is cylindrical, the width of the drum is 1.5 meters, the cross sectional diameter is 1.2 meters, if every minute to 10 laps, then 1 when the pressure of the road surface number of square meters?
- Solution: the bottom perimeter is 3.14 * 1.2=3.768 (meters)The lateral area of the cylinder is 3.768 * 1.5=5.652 (square meters)10 turns per minute, you can find one minute, the area of the road is 5.652 * 10=56.52 (square meters)1 hours =60 minutes56.52 x 60=3391.2 (square meter)Answer: 1 hours, 3391.2 square meters of road surface pressure
- Q:When the asphalt surface is rolled, why should the driving wheel of the roller be geared to the paver?
- When paving asphalt surface, rollers usually use steel rollers, steel rollers are compacted without leaving traces (Che Zhe). The driving wheel of the roller is toward the paver, that is, the power wheel faces the asphalt concrete, the material is out of order and the direction is not compacted. In this way, the driving wheel can not form the wave shape because the power is insufficient, and the asphalt concrete is pushed forwards and forwards, so that the smoothness of the surface layer is more easily controlled. At present, most rollers are driven by two wheels.
- Q:Do you have a 15T roller?
- Yes, if you are interested, you can go to the building site of the construction machinery to look at it. There are many models and complete data..
- Q:The working principle of roller
- The working principle of the roller is as follows:1 、 roller is a method of using mechanical weight and vibration to repeatedly load the compacted material to overcome the cohesion and internal friction between the materials.2, to exclude its internal gas and water, forcing the particles between the displacement, wedge close each other, increase the density, so that it reaches a certain degree of compaction and integrity of the operating machinery.
- Q:Vibratory roller pressure and steel roller compacted what is different
- You should make the cement stabilized layer of double steel wheel vibratory roller, you should first use vibratory roller vibration compaction, and then do not open vibration to smooth surface. Just do not open the vibration pressure several times, the static pressure only to surface dense, but the bottom is still more loose
- Q:How does a housing appraisal center identify a house that has been cracked by a compactor?
- Specific to the scene to see the causal relationship.
- Q:Strong earthquakes and small earthquakes can be used normally,
- Suddenly a weak is the connecting shaft bearing fault vibration wheel these problems in mechanical problems, there is a problem with this hydraulic system pressure test to determine the need to carefully check the problems in professional roller I ask
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Road Roller BuyST152JRoad Roller at Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords