• Air Duct Insulated System 1
  • Air Duct Insulated System 2
  • Air Duct Insulated System 3
Air Duct Insulated

Air Duct Insulated

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Air Duct Insulated

Introduction

This type of duct is made of reinforced aluminum foil coating.The inner part is filled with highly tensile spiral steel wires to support the duct.It is generally applied on low to medium air velocity with temperature variation system.This product has passed GB8624B1 fire resistant test.

Specification Description

Thickness of aluminum foil

0.0065mm

Thickness of PET

0.012mm/0.015mm

Density of cotton

16kg/m3;20kg/m3;32kg/m3

Thickness of cotton

25mm

Diameter of steel wire

0.8mm/1.2mm

Glue

hot melt adhesive /polyurethane

Caliber

4"~20"

Package

Box/bag

Length

6m/10m

Technical Target    

Operating temperature range

-30oC~140oC

Max air velocity

30m/s

Max operating pressure

2500pa

Meltingpoint of hot melt adhesive

130oC

Parametric Table

Number of plies

Max operating temperature

Materials

Single ply

120oC

single-ply aluminum foil and single-ply PET  film compound

Double plies

140oC

single-ply PET to place in double-ply  aluminum foil

Four plies

220oC

Doulble plies of single-ply aluminum foil

Six plies

250oC

Double plies of double-ply aluminum foil

We are pleased to supply products according tothe requirement of our clients!

Production Flow

   




Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
So good, then you recommend more. Give an address. You are not layman, too modest.
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: Air conditioning ventilation when the sound is a big reason
Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q: Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Aluminum alloy metal shell better than the plastic shell; we all know that most of the market is now charging the lithium battery, lithium battery is the only drawback is the possibility of a long time with the explosion, so the use of aluminum Alloy shell, much better than steel; polymer battery is good, but the price is expensive,
Q: HVAC Heating: What are the main components of the air distribution system?
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords