• Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 1
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 2
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 3
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 4
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 5
Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

1. Structure of Double Layer Aluminum Flexible Duct for Air

Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for HVAC is Ideal to use for air condition/ventilation system including water heater, fanner, ventilator, center air condition in hospital, hotel, restaurant, commercial building as well as industrial and residential application.

 2.Main Features of Double Layer Aluminum Flexible Duct for Air

Conditioning Refrigeration

Advantages;

1) Easy to use, economic and financial.

2) Compared to aluminum foil duct, it is more convenient to transport and can bear higher pressure and temperature, longer lifespan.

3) Many models: ranged from 50mm to 400mm so far.

Application and benefits

 -Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 3. Double Layer Aluminum Flexible Duct for Air Conditioning

Refrigeration Images

 

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

 

 

 4. Double Layer Aluminum Flexible Duct for Air Conditioning

Refrigeration Specification

Non-insulated Flexible Duct

Structure: Two-layer aluminum foils +1 layer of PET film.

Non-insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Non-insulated Flexible Duct
(1 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm

Insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Insulated Flexible Duct
(1 Layer Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Combined Flexible Duct

Structure: flexible duct PVC jacket.

REMARK: Special structure is available according to customer's requirements

Combined Flexible Duct (PVC jacket+ flexible duct)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

1.what’s the package

10meters packed in one carton

 2.How long for your delivery time?

Normally15 working days can be served. If you need the products urgently, we can shorten the delivery time into 10 days.

 3.Do you support customer required size or dimension?

we can produce according to customers’ required.

 

Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
So good, then you recommend more. Give an address. You are not layman, too modest.
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q: Air conditioning ventilation when the sound is a big reason
Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: Air conditioning machine work when the sound is too much reason
Color steel plate, refers to the color coated steel plate, color coated steel plate is a kind of organic coating with steel plate
Q: What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Q: HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords