• Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 1
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 2
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 3
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 4
  • Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration System 5
Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

1. Structure of Double Layer Aluminum Flexible Duct for Air

Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for HVAC is Ideal to use for air condition/ventilation system including water heater, fanner, ventilator, center air condition in hospital, hotel, restaurant, commercial building as well as industrial and residential application.

 2.Main Features of Double Layer Aluminum Flexible Duct for Air

Conditioning Refrigeration

Advantages;

1) Easy to use, economic and financial.

2) Compared to aluminum foil duct, it is more convenient to transport and can bear higher pressure and temperature, longer lifespan.

3) Many models: ranged from 50mm to 400mm so far.

Application and benefits

 -Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 3. Double Layer Aluminum Flexible Duct for Air Conditioning

Refrigeration Images

 

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

Double Layer Aluminum Flexible Duct for Air Conditioning Refrigeration

 

 

 4. Double Layer Aluminum Flexible Duct for Air Conditioning

Refrigeration Specification

Non-insulated Flexible Duct

Structure: Two-layer aluminum foils +1 layer of PET film.

Non-insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Non-insulated Flexible Duct
(1 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm

Insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Insulated Flexible Duct
(1 Layer Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Combined Flexible Duct

Structure: flexible duct PVC jacket.

REMARK: Special structure is available according to customer's requirements

Combined Flexible Duct (PVC jacket+ flexible duct)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

1.what’s the package

10meters packed in one carton

 2.How long for your delivery time?

Normally15 working days can be served. If you need the products urgently, we can shorten the delivery time into 10 days.

 3.Do you support customer required size or dimension?

we can produce according to customers’ required.

 

Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Decoration refers to the home improvement part, housing construction is the content of the building
Q:I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:HVAC Heating: What are the main components of the air distribution system?
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
Q:US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:Air conditioning ventilation when the sound is a big reason
No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords