Tower Crane VFD PLC Slewing Mechanism TC7135
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7135
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 3.7~18.26 | 20 | 22 | 24 | 26 | 28 | 30 | 32 |
4 Falls (t) | 16 | 14.48 | 13.02 | 11.8 | 10.77 | 9.89 | 9.12 | 8.45 |
R | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
4 Falls (t) | 7.86 | 7.34 | 6.87 | 6.44 | 6.06 | 5.71 | 5.39 | 5.1 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
4 Falls (t) | 4.84 | 4.59 | 4.36 | 4.15 | 3.95 | 3.76 | 3.59 | 3.43 |
R | 66 | 68 | 70 | |||||
4 Falls (t) | 3.28 | 3.14 | 3 |
71m jib length:
R | 4.7~35.36 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
2 Falls (t) | 8 | 7.98 | 7.38 | 6.96 | 6.58 | 6.24 | 5.93 | 5.64 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
2 Falls (t) | 5.37 | 5.13 | 4.9 | 4.7 | 4.5 | 4.32 | 4.15 | 3.99 |
R | 66 | 68 | 70 | 71 | ||||
2 Falls (t) | 3.84 | 3.7 | 3.56 | 3.5 |
65 m jib length:
R | 3.7~19.55 | 21 | 23 | 25 | 27 | 29 | 31 | 33 |
4 Falls (t) | 16 | 14.79 | 13.36 | 12.16 | 11.15 | 10.27 | 9.5 | 8.83 |
R | 35 | 37 | 39 | 41 | 43 | 45 | 47 | 49 |
4 Falls (t) | 8.24 | 7.7 | 7.23 | 6.8 | 6.41 | 6.05 | 5.73 | 5.43 |
R | 51 | 53 | 55 | 57 | 59 | 61 | 63 | 65 |
4 Falls (t) | 5.15 | 4.9 | 4.66 | 4.44 | 4.24 | 4.05 | 3.96 | 3.7 |
65m jib length:
R | 4.7~38 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
2 Falls (t) | 8 | 7.77 | 7.35 | 6.96 | 6.61 | 6.29 | 5.99 | 5.72 |
R | 53 | 55 | 57 | 59 | 61 | 63 | 65 | 66 |
2 Falls (t) | 5.47 | 5.23 | 5.02 | 4.81 | 4.62 | 4.45 | 4.28 | 4.2 |
60m jib length:
R | 3.7~21.45 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
4 Falls (t) | 16 | 15.57 | 14.13 | 12.93 | 11.89 | 10.99 | 10.2 | 9.51 |
R | 36 | 38 | 40 | 42 | 44 | 46 | 48 | 50 |
4 Falls (t) | 8.89 | 8.34 | 7.84 | 7.4 | 6.99 | 6.61 | 6.27 | 5.96 |
R | 52 | 54 | 56 | 58 | 60 | |||
4 Falls (t) | 5.67 | 5.4 | 5.15 | 4.92 | 4.7 |
60m jib length:
R | 4.7~41.9 | 44 | 46 | 48 | 50 | 52 | 54 | 56 |
2 Falls (t) | 8 | 7.58 | 7.21 | 6.87 | 6.56 | 6.27 | 6 | 5.75 |
R | 58 | 60 | 61 | |||||
2 Falls (t) | 5.52 | 5.3 | 5.2 |
55m jib length:
R | 3.7~21.54 | 23 | 25 | 27 | 29 | 31 | 33 | 35 |
4 Falls (t) | 16 | 14.89 | 13.57 | 12.45 | 11.48 | 10.63 | 9.89 | 9.24 |
R | 37 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
4 Falls (t) | 8.65 | 8.13 | 7.65 | 7.22 | 6.83 | 6.47 | 6.14 | 5.84 |
R | 53 | 55 | ||||||
4 Falls (t) | 5.56 | 5.3 |
55m jib length:
R | 4.7~41.6 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | 56 |
2 Falls (t) | 8 | 7.71 | 7.33 | 6.98 | 6.65 | 6.35 | 6.08 | 5.82 | 5.7 |
50m jib length:
R | 3.7~22.4 | 24 | 26 | 28 | 30 | 32 | 34 | 36 |
4 Falls (t) | 16 | 14.85 | 13.58 | 12.5 | 11.56 | 10.74 | 10.011 | 9.37 |
R | 38 | 40 | 42 | 44 | 46 | 48 | 50 | |
4 Falls (t) | 8.79 | 8.27 | 7.8 | 7.38 | 6.99 | 6.63 | 6.3 |
50m jib length:
R | 4.7~43.6 | 44 | 46 | 48 | 50 | 51 |
2 Falls (t) | 8 | 7.92 | 7.53 | 7.18 | 6.85 | 6.7 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: i saw a PS3 in a claw crane game at Six Flags Over Georgia i wonder how you can win it. It is possible to win it... somehow. I thought that the strategy was to lift the prize that is closest to the hole. I almost won a Kinect that way. So are there any other strategies??? Don't say buy 1 or there isnt a way to win because there is.
- It's impossible to win them if they are in a crane machine only gullible person will try to win a PS3 from a crane machine as it will not be strong enough to pick it up
- Q: I caught this crane fly in my garage but is almost the size of a dragonfly. It has a 3 inch wingspan. I saved it in a jar because I though no one would believe me. so do they really get this big or is this thing a freak?
- OMG - I saw one of those to! No one believed me, too. I should of saved mine...anyway, I don't know. Sorry.
- Q: Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
- what is with the gay?? Do you have an obsession with men or something?? Are you sure your not the one who is gay? Since when is sensitivity a sign of being gay?? who taught you that? You should really have a talk with yourself about your sexuallity.
- Q: how to draw a crane hook on auto cad?
- Measure a crane hook then draw it. Even better, visit a manufacturer's web site and see if you can download one of their drawings for a hook.
- Q: What are the parts of a tower crane? What are their main functions?
- The structural elements include the followingMain arm: carrying weight, and making the trolley have walking track.Balance arm: put up lifting mechanism, electric box, counterweight, and make tower crane to achieve balance torque, reduce the standard section of the bending moment.Tower cap: connect the main arm with the balance arm by the tie bar, so as to reduce the bending moment of the standard section.
- Q: Secured to a concrete floor with 12 30mm bolts
- That can only be answered by analizing it. A crane as you are supposed to know has different loads and directions of impact due to the moving bridge, the trolley, and break loads. So what it can lift depend on the whole structure. Besides depends as much on the type of crane
- Q: what is the proper way to fold a paper crane?
- Well, okorder /
- Q: I'm not afraid of snakes, mice, spiders, or any insect, for that matter. Except crane flies. I'm not even afraid of mosquitoes! However, I've been afraid of crane flies since I was six. I live in Louisiana and The crane flies came today, exactly on the same day they came last year. I don't care about them outside but I freak out when they're inside- especially in my bedroom, the bathroom, and the living room. What can I do to a) protect my house from them and b) not be afraid of them? I'm 14 by the way.
- Your fear is a bit of a mental conditioning, like brainwashing yourself into fearing them. Sure, they can be a bit pesty, especially buzzing around your face, but they are totally harmless. They are much like butterflies at night. Instead of practicing being afraid of them, try catching them. As a kid I would play with them. We called them mosquito hawks because they look like giant mosquitoes. (but they don't bite and don't eat mosquitoes) I used to sit on the porch and watch the sun set. I had a beautiful orb weaver that would come out from the porch light and make one of those fancy webs.(I loved watching that). then the crane flies show up. when a persistent one would buzz my face, I would catch it and toss it into the spiders web. Just try catching one, and maybe look at it, play with it for a while, and/or toss it outside. learn how to control your fear, rather than let it control you.
- Q: What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
- The okorder /
- Q: what does the expression, fate is a ninny woman, mean. from open boat by stephen crane?
- Well, it means Crane was sexist, for one thing. :o) I think it means that he thought that fate could be fickle, capricious, and not appear to be very smart compared to how we would like things to turn out.
Send your message to us
Tower Crane VFD PLC Slewing Mechanism TC7135
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords