Tower Crane TC6520 VFD PLC Control Mechanism
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane Condition:New Model Number:TC6520(QTZ160) Place of Origin: China (Mainland) Brand Name: CMAX Certification: ISO,CE Warranty: 1 Year Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed. 3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide? A: Providing timely delivery, standby engineers are ready to slove any of your problem Providing all-embraced warranty of products quality, worksite installation guidance Providing ample spare parts and training of operation and maintenance Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ? A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty? A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ? A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer? A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view. | |||||
(0) |
- Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
- The okorder
- Q: how to pass a crane practical test?
- The same facilities that offer the tests generally offer times when the cranes can be used for practice. Try calling the testing center. If they don't offer it there, they'll tell you where. Sometimes jobs will offer to pay for the practice sessions. You should asks about that too. You should also be prepared to pay for it yourself.
- Q: Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
- no i haven't
- Q: I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
- Adult crane flies survive from all the fat they have, from their larval and pupal stage.When they run out of it, they eventually cannot find food, and by that time, they should die of age.It's probably both causes, if not because of predators,disease..etc
- Q: What should I do with them? who would accept them if I donated them?
- Maybe go to a children's hospital and see if they will accept it. If they won't maybe they will know of an organization that will.
- Q: im doing and essay and i need help on what motivated him to write this poem. im in 9th grade
- Well, the poem talks about war and its aftermath. and its horrors. Look into Stephen Crane's life. Was he affected by war? Did anyone in his family go to war? Did he go to war? Did he see the war. Maybe he was in the war and is talking to someone who felt the affects of it.
- Q: How are those really tall construction cranes assembled ???
- I assume you are talking about a tower crane. From a distance, it looks like a T with one side shorter than the other. First, you need a good foundation for the crane to sit on. Next, you have a large mobile crane. With the mobile crane, you construct the tower (metal framing going up), the cab (where the operator sits and the motors), the boom (the mast out front) and the counter-weights (on the side opposite the boom). For the most part, this will get you a tower crane that will be about 200 feet above the ground. Most tower cranes today are self-jumping. Once you are ready to jump the tower crame (i.e. insert another section of the metal frame) there are hyraulics that lift the boom, cap and counterwieghts. This will create a gap in the metal frame. The tower crane will then pick up a section of frame and hoist it up and the ironworkers will slide it into place. The top section will be lowered down onto the new frame piece. The hydraulic jacks then get re-attached higher up to continue the jumping process. That is how you get a crane to build a 50+ soty building. By the way, once the crane is about 700 feet in the air, (if you have the stomach for it), it is a blast to ride out to the end of the boom.
- Q: electromagnetic crane
- Current sent through a coil of wire creates a magnetic field, which can be used to pick up ferromagnetic objects. Turn off the current, and the field will turn off (although it might take a few seconds to turn off all the way), dropping the object.
- Q: What are the common problems encountered in hiring cranes for house constructions?
- It might not be the right size for the job.
- Q: Is a crane a type of pulley?
- i would think it's closer to a lever. in fact, it's a complicated machine that uses multiple simple machines.
Send your message to us
Tower Crane TC6520 VFD PLC Control Mechanism
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords