TC6014 tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC6014 tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q: As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
- they use a process called jumping. iron workers use a special fixture to unbolt the tower and lift the crane up high enough to slide in another section and bolt it down. breaking down of the crane goes in reverse order.
- Q: i was reading this chapter in the book Catching fire (part of the Hunger Games Series) and this one part said she wrote Seneca Crane on the dummy with mud,, who is Seneca Crane?
- Seneca Crane was the Head Gamemaker. When Katniss and Peeta took out the berries, President Snow wanted to blow them up to bits but Seneca let them through. He was executed after because of this. “If the Head Gamemaker, Seneca Crane, had had any brains, he'd have blown you to dust right then. But he had an unfortunate sentimental streak. So here you are. Can you guess where he is?” he asks. I nod because, by the way he says it, it's clear that Seneca Crane has been executed.
- Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
- You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
- Q: i just kept distracting his attention but i cant do anything else, what do i do with the crane??? how can i lose the ball???
- i have it for console but what you do with that is this. When he does a big slam after chasing you make sure he does it in the cement area, then go to the crane and it cutscenes to you hurting him. Then you will follow him some more to a car shop. He throws cars at you, when he does a big slam sparks from his back disappear (they were caused by the crane) jump on his back and keep smashing him till he falls on his back, then just repeat that and watch a cutscene of his defeat.
- Q: Why do tower cranes need to be fabricated?
- The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3-4 times the same structure light steel wire rope (laboratory comparable conditions) with the research on the wear resistance of phosphating, and greatly enhance the possibility of. Manganese phosphating is bonderizing, can solve the wear problems of wire rope used in the process, according to the current market situation of wire rope, manganese phosphating coating of steel wire rope price is higher than that of plain steel wire rope, and prolonging the service life of much higher than the rate of price increase, so the phosphating coating steel wire rope daily use fee is only plain steel wire 30-45% rope, the use of lower cost, higher cost, smooth steel wire rope is eliminated. For reference only
- Q: I want to know how to make the best and easyist paper crane with origami.
- How okorder /
- Q: Is the working load of a crane the maximum weight it is able to lift?
- Usually there is a safety factor of 400% built into all engineered cranes. This is to account for unforeseen momentary spike loads, operator errors and component weaknesses ( (chipped tooth or poor forged parts or chains, etc) This is to take into account shock loads, for instance if you were picking up a bundle of steel bars and the load shifted and the bars dropped a foot or so the momentary load on the crane spikes. Working load is basically the load the crane is designed to run all day long at. If you run at the design load the crane is covered under the manufacturer's guarantee against defects and the maker is liable for problems or failures associated with the crane. But for example if the manufacturer can demonstrate you were picking up a 5 ton load on a regular basis with a crane rated at 3 tons, the manufacturer's liability is negated. Since you can counterweight any crane enough to theoretically lift anything, most of the cranes that have electric motors actually will stall if you lift much over the design weight. In other words in the above crane if you try to pick up 5 tons with a 3 ton crane, the motor will not have enough horsepower to pick up the weight and the motor will simply not lift it. The actual overload factor built into a crane is usually to contend with those shock loads and defective or weak components not seen.
- Q: how do you make one of them, put me through sep by step with photos.
- Hi okorder /
- Q: You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
- from the ground up
Send your message to us
TC6014 tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords