• Tower Crane 10 Ton VFD PLC Control Mechnical System 1
  • Tower Crane 10 Ton VFD PLC Control Mechnical System 2
  • Tower Crane 10 Ton VFD PLC Control Mechnical System 3
  • Tower Crane 10 Ton VFD PLC Control Mechnical System 4
  • Tower Crane 10 Ton VFD PLC Control Mechnical System 5
  • Tower Crane 10 Ton VFD PLC Control Mechnical System 6
Tower Crane 10 Ton VFD PLC Control Mechnical

Tower Crane 10 Ton VFD PLC Control Mechnical

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
10T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
2.0T
Span:
65M
Rated Load Moment:
160T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6520(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane 

 

 

Tower Crane 10 Ton VFD PLC Control Mechnical

Tower Crane 10 Ton VFD PLC Control Mechnical

Tower Crane 10 Ton VFD PLC Control Mechnical

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view. 

Q: Hi friendsI need some sketches of automotive crane?In which site or web log I can find it?
I'm not sure what you mean by an automotive crane: a tow truck, a crane for lifting car engines, or a crane for lifting cars. Anyway, try google images. Search for automotive crane and see what it turns up.
Q: A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
Q: What is the most likely reason that Crane never tells us the lieutenant's name in episode of war?
The Stephen Crane Society Stephen Crane did not have a middle name. Stephen Crane is buried in ... Would a person be more likely to receive a wound when bravely charging the enemy .... I would be most grateful if you could tell me where I could find this please? .... An Episode of War. How does the facts that the lieutenant is rationing ..
Q: I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
Adult crane flies survive from all the fat they have, from their larval and pupal stage.When they run out of it, they eventually cannot find food, and by that time, they should die of age.It's probably both causes, if not because of predators,disease..etc
Q: Similarities in theme with Emily Dickinson and Stephen Crane?
?
Q: I know you need to put current around the magnet (or certain type of metal) in order to attract but is it possible to use as pushing an object away. if there is please tell me how!
To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
Q: A. Power LinesB. WaterC. FiresD. Overturns
Dangerous to whom and exactly what does overturns mean? Operators are most likely to be killed when a tower crane breaks (is this an overturn?) because the operator is several hundred feet up in the air in the cab. Hitting power lines can be risky to the operator if dumb but staying in the cab is likely to be safe (stepping out may kill in touching ground) Overturning a ground based crane is going to hurt someone in the area much of the time.
Q: Are there any standard requirements? If so, please show me some reference materials. Thank you, 20It's urgent, online, etc.. Thank youWould you please not write down the specifications? The specific methods of operation, with what materials are written on, thank you, good, you can add points
segments can be fixed after solving this problem, usually with plastic copper (with insulating layer) and insulator is fixed on the tower body section,
Q: i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
I would think it's wind-related. If they were all pointed differently, one would catch more wind and spin more. If they were close enough, this one may hit another. If they were all pointed the same, this would be less likely (although not guaranteed). They SHOULD be spaced apart sufficiently, though, so during operations there is no chance of hitting another. So, it's more likely because of something on the ground. Maybe at last drop off they were all pointing in the same direction?
Q: explain thoroughly please
Sure. Let's say that a crane needs to hoist a load of 10 tons, and that because it needs to reach over some obstacles, needs to lift at a horizontal distance of 50 feet away. That creates a torque about the base of the crane of 500 ton·ft. By positioning a counterweight on the opposite side of the tower, the magnitude of the moment can be mitigated. For instance, let's say a counterweight of 10 tons is positioned at 25 ft on the other side of the tower. The moment produced by the counterweight is 250 ton·ft, so the net moment at the base is 250 ton·ft. Furthermore, when the 10 ton load is positioned and release, there is still a 250 ton·ft moment at the base of the tower; it has simply switched direction (say from rotating the crane to the right, to rotating it to the left). If you find this helpful, please award Best Answer!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords