Tower Crane TC6520 VFD+PLC Technical Control
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6520(QTZ160)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
Specification of Tower Crane
Technical Sheet for TC6520
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 55、60、65 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 10 | ||||
Tip load @ 65m(t) | 2 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF250M1-6-45KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YZPBE132S-4-5.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YTW112M-4-5.5KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 21.3 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 63 | ||||
Power supply requirement (KVA) | 230KVA for generator | ||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||
Startup voltage & current | 380V×95%=361V 219A | ||||
Rated working voltage & current | 380V 121A |
Loading diagram:
65m jib length:
R | 20 | 25 | 30 | 35 | 40 | 46 | 48 | ||
a=2 (t) | 5t---29.1m | 4.84 | 4.1 | 3.53 | 3.02 | 2.87 | |||
a=4 (t) | 10t---14.73m | 7.33 | 5.8 | 4.77 | 4.03 | 3.46 | 2.95 | 2.8 | |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 | 65 |
a=2 (t) | 2.74 | 2.62 | 2.5 | 2.4 | 2.3 | 2.21 | 2.12 | 2.04 | 2.00 |
a=4 (t) | 2.67 | 2.55 | 2.43 | 2.33 | 2.23 | 2.14 | 2.05 | 1.97 | 1.93 |
60m jib length:
R | 20 | 25 | 30 | 36 | 38 | 40 | 42 | ||
a=2 (t) | 5t---35.67m | 4.95 | 4.67 | 4.42 | 4.19 | ||||
a=4 (t) | 10t---18.15m | 9.06 | 7.2 | 5.94 | 4.88 | 4.6 | 4.35 | 4.12 | |
R | 44 | 46 | 48 | 50 | 52 | 54 | 56 | 58 | 60 |
a=2 (t) | 3.98 | 3.79 | 3.61 | 3.45 | 3.3 | 3.16 | 3.03 | 2.91 | 2.8 |
a=4 (t) | 3.91 | 3.72 | 3.54 | 3.38 | 3.23 | 3.09 | 2.96 | 2.84 | 2.73 |
55m jib length:
R | 20 | 25 | 30 | 32 | 34 | 36 | 38 | ||
a=2 (t) | 5t---37.75m | 4.97 | |||||||
a=4 (t) | 10t---19.23m | 9.61 | 7.64 | 6.31 | 5.89 | 5.52 | 5.19 | 4.90 | |
R | 40 | 42 | 44 | 46 | 48 | 50 | 52 | 54 | 55 |
a=2 (t) | 4.70 | 4.45 | 4.23 | 4.03 | 3.85 | 3.67 | 3.52 | 3.47 | 3.3 |
a=4 (t) | 4.63 | 4.38 | 4.16 | 3.96 | 3.78 | 3.6 | 3.45 | 3.3 | 3.23 |
Images of Tower Crane
FAQ about Tower Crane
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q:Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
- you okorder and there ou can search prison break crane!!!
- Q:How about the installation and disassembly of the tower cranes?
- Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
- Q:im so frustrated because ive tryed everything and im obsessed with this book it would really help if someone could find a way for me to read it for free online. i cant find it at my library.please and thank you:)?
- did you ever get to read this book
- Q:If I have one week, is that enough time?
- It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
- Q:How do we build an ELECTROMAGNETIC crane?
- The bible does mention the pyramids. It is in Exodus when the Jews have been in captivity in Egypt and developed them. What? You suggestion the Egyptians had the skill or science to do it? The secret is that they were built from the highest down as a substitute than the bottom up.
- Q:I was interested in the Japanese legend of folding a thousand cranes. It was said that if a person was able to fold 1 000 cranes, you get to make a wish.I'm just wondering; let's say I'm done with all 1 000. What do I do next? One of my friends told me you had to burn all one thousand cranes, while another suggested to put the last one in a bottle and set it out in sea.Did it ever state what to do in the end, after folding all the cranes? If it does, please enlighten me :3Thank you :)
- I've only heard of putting them up on strings and you could give them as gifts .. Oh and you could also frame them by laying them flat
- Q:Was it Ichabod Crane or Rory Emerald who got the jeepers creepers scared out of them by a headless horseman?
- It was Ichabod Crane who encountered the headless horseman.One of my favorite stories!
- Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
- The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
- Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
- The maximum amplitude control: when the weight exceeds or prohibit increase load rate of more than 105% or greater than the maximum amplitude (amplitude limit) output control, allowing the car to be near range by car distance to increase amplitude is prohibited.Minimum range control: when the amplitude is less than the minimum amplitude (amplitude lower limit), the output control allows the car to move to a distant range, i.e., to increase
- Q:hiya :) for my birthday i want an arcade style grabber machine that can pick up sweets and accept real money etc. I dont want small plastic ones because they are pretty pathetic tbh. I know its a bit random but i really appriciate it because my birthday is coming up ;) i want it being in the range of ?60-?100 :) thanks
- Sweet Grabber Machine
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC6520 VFD+PLC Technical Control
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords