Tower Crane TC5613 Construction Equioment Sales Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5613 Description:
1.CMAX Tower Crane TC5613 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5613 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5613 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5613 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5613 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5613 Parameter:
Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 46
Max height with attachment (m) 150(200)
Working range can be adjusted (m) 44、50、56
Min working range (m) 2.5
Max lifting capacity (t) 8
Tip load @ 50m (t) 1.3
Tower Crane TC5613 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5613 Diagram:
Tower Crane TC5613 Technical Sheet:
Tower Crane TC5613 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC5613 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56meter, and the last two letter “13” means the tip load is :1.3 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: for my homework : the question was explain how a skyscraper crane uses physics moments but no where can i find out the answer and dont want a detention ekkk x
- OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
- Q: I was wondering if this is possible. The wall we have designed is very close to an existing retaining wall. In order to properly form and waterproof the wall we would have to demo that existing retaining wall. My idea was to build it off site, waterproof it, and then crane it into its location. Is this possible? any similar methods? thanks
- Possible but difficult. You could tell us what the wall is made of? Assuming stone, then you can't lift a stone wall unless you have a steel plate under it, as it will collapse otherwise. That gets complicated. Yes, you could build it with a 1/2 inch steel plate under it, and lift it that way, assuming it is not too long, and crane it into position, but you then have to slide the plate out without cracking the wall, also difficult. The plate is expensive, the crane is expensive. But what do you gain? You still have to demolish the old wall, you still have to build a new one, so what would you gain by building it somewhere else and moving it?
- Q: I have an odd fear of construction cranes. I literally get chills and almost dizzy anytime I see cranes. I get very nervous and almost want to cry. I know this is so odd but, I've seen phobias of things that are even more odd so I wonder...is there a phobia for my fear? Does anyone else share my fear?
- Devastator-aphobia. Sorry. It's a bad reference to the Transformers cartoons in the 1980s. The constructicons were robots who linked together to form Devastator. It was kind of a Voltron rip-off, except with backhoes and forklifts instead of robot lions.
- Q: What should i do to solve tower crane collapse?
- i couldn't figure it out either. try the castle catapult instead.
- Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
- 1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
- Q: Lifting a cylindrical steel vessel kind of thing is required to change it's postion from vertical to horizontal for cutting into pieces. The cranes deployed are indivisually operated.
- This is strictly a question for an experienced rigging contractor. There is a lot more to the question than just what cranes you are using. I have been involved in the lifting of many large vessels up to 150 foot in length and over 600,000 lbs. If you have to ask questions like the above, you have no business even involved in such a project. There are many contractors who are experienced in doing the kind of work you are asking about. I would not undertake such a job without some very experienced folks taking the lead.
- Q: Under what circumstances are winches used and under what circumstances tower cranes are used?
- Construction technology is not too complex, and components can be zero, the use of winches (such as brick structure). Large components can not be separated, the use of tower cranes (such as cement cast-in-place shear wall structure must use large-scale steel mold).
- Q: What is the dumbest bird in the aviary community? Is it really the Crane?
- great question! I would love an aviary that was half open/half closed. I would love the birds to have the option at all times of choosing the protected surroundings (from weather, sounds, other animals, etc) of inside. Just as convenient would I love their ability to be outside in the fenced aviary so as to choose t heir own environment filled with trees, shrubs, plants, fountains but with enough room for me to observe and enjoy their interaction.
- Q: Why are there extra placards attached to the tower crane tower?
- 2. after adding the placard, it will increase the windward area of the tower crane and increase the wind load of the tower crane, so that it will deviate from the calculation load when the tower crane is designed, and will affect the safe use of tower crane.
- Q: Since now everyone will know what's coming when you get in the crane kick position, and the element of surprise is gone, has the crane kick become an extinct move? Do martial arts experts not like the Karate Kid for ruining the crane kick in the way magicians don't like other magicians who reveal their secrets?
- yeah, because, Okinowan Crane had an unbeatable technique (as Miyagi described it). Anyone with a shred of common sense can see what was coming.
Send your message to us
Tower Crane TC5613 Construction Equioment Sales Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords