• TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control System 1
  • TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control System 2
  • TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control System 3
TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control

TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control

Technical Sheet for TC7032

Free standing  height (m)

52.4

Max height  with attachment (m)

199.4

Working range  can be adjusted (m)

30、35、40、455055606570

Working range  (m)

4.3-70

Max lifting  capacity (t)

12

Tip load @ 70m  (t)

3.2

Hoist  mechanism

Falls

2

4

Lifting  capacity (t)

0-3

0-6

0-6

0-12

Speed (m/min)

0-80

0-40

0-40

0-20

Motor

70RCS30 70hp / 75LVF30 75hp

Trolleying  mechanism

Speed (m/min)

15-50(12t) -100(6t)

Motor

6D3V4 6hp

Slewing mechanism

Speed (r/min)

0-0.7

Motor

rvf162 2X7.5hp

Climbing speed  (m/min)

0.5

Counterweight  (t)

26

Mast section  size (L×W×H)m

2×2×3 ( panel mast  type )

Working  temperature

-20+40

Total power (KW)

95

Power supply  requirement (KVA)

255KVA for  generator

Cable type (  within 30 meters from site power source to lower

electric box of tower crane )

60mm2 (3+2, 5 cores)

Startup  voltage & current

380V×95%=361V  260A

Rated working  voltage & current

380V             146A


Loading Chart



70mJib Length

R(m)

2.5-        23.92m

25

30

35

40

45

50

55

60

65

70

a=2  (t)

6t---42.35m

5.75

5.33

4.75

4.09

3.71

3.20

a=4  (t)

12t

11.4

9.18

7.62

6.45

5.25

4.83

4.25

3.59

3.2

2.45

65mJib Length

R  (m)

2.5-  25m

30

35

40

45

50

55

60

65

a=2  (t)

6t---47.4m

5.6

5.02

4.51

3.1

a=4  (t)

12t

9.68

8.05

6.83

5.88

5.13

4.52

4.1

4.1

60mJib Length

R  (m)

2.5  -25.75m

30

35

40

45

50

55

60

a=2  (t)

6t---48.85m

5.84

5.20

4.25

a=4  (t)

12t--

10.3

8.34

7.08

6.11

5.34

4.70

3.5

55m Jib Length

R (m)

2.5-  25.87m

30

35

40

45

48

50

53

55

a=2 (t)

6t---50.85m

5.73

4.7

a=4 (t)

12t

10.16

8.52

7.31

6.36

5.9

5.62

5.23

3.95





Q: I'm curious
It's lifted in sections I believe. Once they're at their intended vertical height they then start to construct horizontally. Bit like big boys Mechano (not sure if I spelled that correctly).
Q: science project
hydraulic
Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
Most cranes are diesel engine powered hydraulics and hydraulic motor. So that would be fossil fuel. Some cranes use pulleys to magnify the total lifting capacity. A pulley magnifies work by exchanging distance for lifting power. For example, to lift a 10 ton weight 20 feet in the air, if you put four pulleys in there so that 80 feet of cable would have to be pulled up , then it would only take 1/4 the amount of power to lift that 10 tons (2.5 ton lifting force would lift it) Look at any links or wikipedia for how compound pulleys work.
Q: What are the three different types of Cranes?
Gantry okorder
Q: well I am making 1000 paper cranes... I am on 18... but how do you string them all together anyone know?
How To String Paper Cranes
Q: I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
I dont know how, maybe polio, but he does have a disability.
Q: Formulas for calculating outrigger pad sizes, centre of gravity of loads, outrigger loadings
If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
Q: Can anyone give me a summary of The Veteran by Stephen Crane?
This Site Might Help You. RE: Can anyone give me a summary of The Veteran by Stephen Crane?
Q: i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords