Tower Crane of Chang Li Model Number QTZ63C
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ63C Description
Feature: Tower Crane
Condition: New
Application: All kinds of costruction
Rated Loading Capacity: 4T
Rated Lifting Moment:500/630/800/1000/1200KN.m
Max. Lifting Load: 4T
Max. Lifting Height: 150m
Span: 42M
Place of Origin: Henan, China (Mainland)
Brand Name: Yu Jie
Model Number: QTZ63C
Certification: ISO,CE,BV,SGS
Warranty: 12 months
After-sales Service Provided: Engineers available to service machinery overseas
Tip Load: 0.8
Trolley travel speed: 38/25m/min
Slewing speed: 0.6r/min
Jacking up: 0.4m/min
Powed: 380V/50HZ
Lifting character: 2/4 Fall
QTZ63C Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ63C Specification
QTZ63C Pictures
QTZ63C FAQ
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
- Q: Did not city officials think of the danger if they toppled.
- My friend, that is a good question that only the developer will have to answer to. To the City that is. The crane operator and all other parties in charge of the project will get fined by the City. In addition, they may be lawsuits. Good luck
- Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
- You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
- Q: How do you get a crane down from a tall building once it's completed?
- In the US most are called Tower Cranes and they actualy lower them selves down part way then using Mobile Cranes they diss asemble them the rest of the way
- Q: How to calculate life span of steel structure? for example, crane?
- With bridges that you would be able to calculate an anticipated lifespan. It is going to now not be very particular. You measure the deflection as a given load goes over it. You also measure deflection with average site visitors.You are taking measurements of what normal visitors is. With this knowledge that you would be able to undertaking lifespan and prefer exchanging bridges earlier than they crumple. Once I was once a engineering student I had a summer time job serving to to experiment bridges.Most bridges and gigantic constructions are designed to are living 50 years I believe. For constructions I have no idea of any measurements you would take. I think it is most often a matter of periodic inspections. The things to seem for are basis problems, cracking of concrete, exposed re-bar, concrete flaking off etc.
- Q: ok, so if chad is a crane then why doesnt he stay in the mansion? he is a crane right?
- Yes, Chad is a Crane. He's Alistair's son by Eve's younger adopted sister Liz. I think he doesn't live in the mansion because there's already a gazillion people living there already. How could he stay discreetly on the down low' in a house full of 20 people lol
- Q: Where are cranes mostly found in the world?
- At construction sites.
- Q: Tower cranes, TC7525-16D, TC5610, TC6015A-10E, ZJ5910, D800-42, the power of these models is how much ah?I hope you can help me. I'm in a hurry!! Thank you!
- TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
- Q: does wing chun and karate come from the same white crane style of wushu/kung fu?
- Possibly. Naha Seisan contains a technique much akin to Wing Chun.
- Q: A crane lifts a 425 kg steel beam vertically a distance of 117m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s^2? Neglect frictional forces.a.) 3.4 x 10^5 Jb.) 4.0 x 10^5 Jc.) 5.8 x 10^5 Jd.) 4.9 x 10^5 JSolved as W= mgh but obviously that is wrong. Where do I go wrong?
- You have the right idea, the answer is d. EDIT: Well I actually read the rest of the question (sometimes I get an itchy trigger finger!), and the net force should be found first, the net force includes the weight and the tension in the crane's cable (so you need to find the tension): ∑F = ma = T - mg T = m(a + g) = 425kg(1.80m/s? + 9.80m/s?) = 4930N So the net force is the sum of the tension in the cable and the weight of the beam, or: F = T - mg = 4930N - (425kg)(9.80m/s?) = 735N Then, the work done by the crane is: W = FΔy = 735N(117m) = 8.95 x 10^4J Does not match any of your choices, so I am perplexed! Maybe someone will straighten me out. Apologies if I failed to help.
- Q: how a tower crane for a high rise building construction is erected?
- Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Send your message to us
Tower Crane of Chang Li Model Number QTZ63C
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords