Tower Crane TC4808 with Three Speed Motor
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of TC4808 Tower Crane
Feature: Tower Crane
Condition: New
Max.Lifting Load: 4T
Span: 40m
Place of Origin: China(Mainland)
Model Number: TC4808
Packaging & Delivery of TC4808 Tower Crane
Packaging Detail: Nude package
Delivery Detail: 25-30days
Specifications of TC4808 Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
Images of TC4808 Tower Crane
FAQ of TC4808 Tower Crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
To Lead The Revoluation of International Trade
- Q: I'd take Denny Crane he's ruthless
- Denny Crane. If nothing else he has a heck of a lot of confidence in himself.
- Q: Crane lifts a 600-kg bin with an initial acceleration of 2 m/s^2. Determine the force in each of the supporting cables due to this motion.?
- F = ma Assume the crate is uniformly loaded, both cables will carry the same force F(AB)(4/5) = (600/2)(9.8 + 2) F(AB)(4/5) = 3540 F(AB) = 4425 N F(BC) = 4425 N F(B-Crane) = 600(9.8 + 2) F(B-Crane) = 7080 N As a form of exchange, please remember to vote a Best Answer from among your results. This is not the same as like or thumbs up which are also nice and do boost points, but only after asker awards initial points with their vote.
- Q: In the private training session, Katniss Everdeen creates a noose, hangs a practice dummy, and uses the paint to write: Seneca Crane. I know this name is mentioned earlier in the book, but I don't remember who Seneca Crane is... Remind me, please?
- Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.
- Q: This is a new technology in ringging work. Hope anyone can give me some detail information about wireless crane scale.
- Hi, okorder for more information
- Q: I know that you have to unfold the origami paper crane, but how do you find the surface area of it???????????????????????????/ please help...........
- Do you remember the formula for determining area? For a flat object (like your paper) the formula is Length X Width = Area. or LW=A So unfold your paper, and measure the length and the width, and simply multiply the two numbers. The resulting number will be your area. Of course, that is the area of the unfolded paper. Your crane in it's folded form will have a much different, and harder to find, surface area value.
- Q: I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
- If you download the simulation called Eyes on the Solar System from NASA, you can watch the sky crane crash somewhere off in the distance in the same crater that Curiosity is in. It had quite a bit more reserve fuel than they expected so it might have flown further than shown. edit: they might have disabled that simulation now. I can't get it to work.
- Q: Is there a talk show on the radio or TV similar to the Frasier Crane Show where people call in and tell their problems and the doctor gives them advice? One that's either in the Los Angeles area or nationally syndicated?
- Here's okorder /
- Q: What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
- As for the reasons, the main consideration is the actual needs.
- Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
- The cranes are taken to the top of the buildings in pieces and then they are built together whilst up there.
Send your message to us
Tower Crane TC4808 with Three Speed Motor
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords