Structure of Tower Crane TC6014 Description
Feature: Tower Crane
Condition: New
Application: Construction
Max.Lifting Load: 8T
Max Tip Load:1.4T
Independent Height:46M
Max Lifting Height: 138M
Span: 60m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TC6014
Packaging & Delivery of Tower Crane TC6014
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Feature of Tower Crane TC6014
1) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2) The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Tower Crane TC6014 Specifiction
Technical Sheet for TC6014
Independent height (m) | 46 | |||||
Max height with attachment (m) | 138(200) | |||||
Working range can be adjusted(m) | 48、54、60 | |||||
Min working range(m) | 2.5 | |||||
Max lifting capacity(t) | 8 | |||||
Tip load @ 60m(t) | 1.4 | |||||
Hoist mechanism | Falls | 2 | 4 | |||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | ||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||
Motor | YZRWFC250M-4/8 30/30KW | |||||
Trolleying mechanism | Speed(m/min) | 53/27/12 | ||||
Motor | YZTDE132L-4 /8/16 3.3/2.2/1.1KW | |||||
Slewing mechanism | Speed(r/min) | 0-0.6 | ||||
Motor | YZR132M2-6-3.7KW×2 | |||||
Climbing speed(m/min) | 0.5 | |||||
Counterweight(t) | 17.0 | |||||
Mast section size(L×W×H)m | 1.6×1.6×3.0 | |||||
Working temperature | -40-+60℃ | |||||
Total Power (KW) | 42 | |||||
Power supply requirement (KVA) | 190KVA for generator | |||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||
380V×95%=361V 179A | ||||||
Rated working voltage & current | 380V 128A |
Images of Tower Crane TC6014
FAQ of Tower Crane TC6014
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: dimentions of crane rail, crane beam.
- What kind of crane? There are thousands of types.
- Q: How to choose tower crane in engineering, such as arm length and lifting weight?
- How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
- Q: I am NCCCO certified here in the US and would like to know how to be able to work as an operator in France.
- Me too(NCCCO) how long for you? What do you run? I run a Terrex/demag a/c 140, Grove TMS 870, and a little national 40 ton. Anyway, sorry I don't have an answer but the other day just for kicks I was looking around to see what's going on and searching crane operator+job and there's a huge worldwide company, slips my mind but they kept coming up all over hiring operators all over the world. Give that a try, if I was single I'd be going everywhere, and getting PAID to do it but my wife and kids mean too much to be away. Try this.... search crane service+france email some crane outfits and ask around, it can't hurt.
- Q: How does a crane get down from a skyscraper once they're done using it? Like the crane on top of the skyscraper, do they get take it apart?
- Can only be assumed that the jibs are first dismantled then the actual crane base lowered down by a second crane or even helicopter
- Q: What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
- Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
- Q: Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
- Not in urban areas. Most cranes are put up overnight to avoid disturbing traffic and so forth. I work for a shipping company. They do put up huge cranes overnight and it is quite amazing to see, once or twice. The magic is how well it's organised. And how Santa comes along to give his blessings.
- Q: I was given a CCRadio and I have no idea what it is or what it does.The guy that gave it to me says it's an Awesome DXing radio (whatever that means). The display doesn't work but other than that the radio works fine and pulls in alot of stations the previous owner said. Can anyone help me understand what a CCRadio is and what it does? Thanks to all that contribute.
- Hard to say much about it without knowing the model #. DX = distance in radio parlance.
- Q: ok I found an injured crane what do I feed it?
- Cranes are omnivores. But I would feed crane with vegetarian stuff like grain, berries, plants, roots, seeds, stems, bulbs, fruits, nuts. But if you want make it non vegetarian then rodents, fish, amphibians, snakes, rodents, lizards, small fish, frogs, shellfish, mollusks and crustaceans.
- Q: Tower cranes, TC7525-16D, TC5610, TC6015A-10E, ZJ5910, D800-42, the power of these models is how much ah?I hope you can help me. I'm in a hurry!! Thank you!
- TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
- Q: what is the proper way to fold a paper crane?
- Well, okorder /
Send your message to us
Tower Crane TC6014 building equipment supplier
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords