• tower crane hydraulic self-erecting HS5008 System 1
  • tower crane hydraulic self-erecting HS5008 System 2
  • tower crane hydraulic self-erecting HS5008 System 3
  • tower crane hydraulic self-erecting HS5008 System 4
tower crane hydraulic self-erecting HS5008

tower crane hydraulic self-erecting HS5008

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

HS5008 Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity: 12T 

Rated Lifting Moment: 470MT    Max. Lifting Load: 12T 

Max. Lifting Height: 120M           Span: 60M 

Model Number: HS5008

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange / Yellow 

After-sales Service Provided: Overseas third-party support available 

HS5008 Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary,Travelling, external internal climbing tower crane 

4. Impeller blasting rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

HS5008 Specification

tower crane hydraulic self-erecting HS5008

HS5008 Pictures

tower crane hydraulic self-erecting HS5008

tower crane hydraulic self-erecting HS5008

tower crane hydraulic self-erecting HS5008



HS5008 FAQ

Q: What certificate the tower crane get? A: CNBM certificate for lifting machinery mainly includes:  ISO9001 Certification.Manufacture License of special equipment by AQSIQ,The Installation, Alteration, and Repair & Maintenance License of special equipment from AQSIQ, UAE certificate issued by UAE Authority,CE certificate for the motors adopted on our construction equipments, and so on. 


Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is the meaning of the tower crane’s code?

A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.


Q:What is the calibration value of a tower crane?
Tower crane calibration value is to benchmark material to be calibrated by standard liquid titration value, calibration to parallel mark three times, take the average value, if the requirement is not strict, error within 3 per thousand, strictly within 1 per thousand.Main performance parameters of tower crane:1. Lifting weight G1. weight G - was the quality of the heavy lift. The unit is t.2. rated lifting weight Gn allows crane lift weights together with the quality of the sum of the spreader.3. maximum weight Gmax - normal work conditions under the crane, the maximum permissible rated lifting weight lifting.Two, range LL - 1. range of level ground when the crane is positioned between the spreader, no-load vertical center line to the center line of the rotary horizontal distance. The unit is m.2. biggest Lmax - crane, jib angle or the minimum car in arm the limit position of the amplitude.3. Lmin minimum amplitude - jib angle or trolley jib in maximum limit position within the range.
Q:How To Make Origami Crane?
You okorder and see how to make origami crane step by step
Q:Interesting facts about the short story writer, Stephen crane.
Stephen Crane Facts
Q:how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Q:i have to make a children's story about how the whooping crane became endangered; (based on real facts) ideas?
You could write a story about an old Whooping Crane with lots of children that goes on migration only to come back and find her home has been destroyed. So she goes and starts trying to raise awareness about it, and eventually finds a new home due to her efforts. This would need much more tweaking and changing of course.
Q:We would like some ideas from folks who have the cranes coming to their bird feeders. What foods are they attracted to?
Sand Hill Cranes are omnivores which means that they feed on a wide variety of food. Their diet will change depending on the time of year and the habitat. Part of their diet would be rodents, snails, frogs and other small animals. They also will eat the roots of aquatic plants and grains in farm fields. This is where you may be able to draw the cranes to your yard. Spread the bird seed on the ground. Even small piles of seed may help. These birds like to forage through grassy areas and can do some digging with their beaks leaving the ground lumpy, so be sure you want them in your yard.
Q:Also, could anyone give me a site with a detailed behind the scenes look on different types of freight ships? I hold a strong interest in the shipping sector and being unsure on little details like these annoy me. Thanks!
? ? ? Onboard Cranes from the cabs on each Crane , where'd you think from ?
Q:Do they have to be taken apart... if so, how are they taken apart... by another crane? - but how did that one get there etc etc
There okorder /
Q:What is the difference between a tower crane QTZ31.5 and a QTZ40?
the length of the arm is 42-48 meters; the elevation is 29-32 meters.
Q:a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
I wonder if you saw my response to the additional question you asked of my previous answer to this question .. To see my response .. go to your previous question and click on comment in the Action Bar (below 'Asker's Rating')

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords