TOWER CRANE TC3508
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
- Hello, okorder /
- Q: Firstly I know there is a very good club near me which does 5 lessons a week, just to let you know.Firstly could you please tell me how much of white crane is actually fun and how much percentage is kicks and how much punches.I'm a very althletic boy age 15 and I don't know much about this style. Is it fairly exciting and what I might enjoy?Thanks for you help.
- I am a student of White Crane Fist. If you can, please tell me the name of the teacher, the school and the address so I can give an answer based on fact and not speculation... which is something that is rampant on this forum. There are different schools or versions of WCF. There is also th Tibetan White Crane, which is related to the Lama Fist. I have no real knowledge of Tibetan style. First thing is, if you are referring to the Fukien WCF: it is not like most martial arts you are familiar with. It was developed by a woman named Fang Chi Niang. Her father was a master of the 18 Lohan Style. It is an Internal art that uses concepts, movement and intention as the foundation of its arsenal. White Crane fist will develop the ability to execute explosive power against an attack. There really is not too much punching-type striking. When you see a closed fist, it usually is a grappling technique. Palm thrusting, claw grapples, spear hand and finger thrusts are used. The foundation training for WCF is San zhan, also spelled San jan or San Chien. The latter is the closest since it is a Fukienese art. San Chien develops power and rootedness. Fukien WCF has influenced the Five Ancestor Fist, which contains WCF concepts. It is also the predecessor to what is known today as Karate, both the Shuri and Naha lineages. If you are fortunate enough to have a Fukien WCF school near you, you would be a fool not to take full advantage. I have to travel an hour to see my Sifu. And if I had to travel more, I would. Please, send me the info so I can give you my researched results.
- Q: It's better if the explanation is not complicated.TQ
- Hello, 1. Modularity: You can build ships (larger ships) in modular sections and have the crane lift these modular sections and put them into place for final assembly. This is one major advantage that was not available back in the day
- Q: What type of tower crane does not include tower crane in variable amplitude mode?
- Tower crane, tower crane.Tower crane according to its different types, there are the following classification methods.(1) divided by structure type of fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.
- Q: my father has his forklift and crane license. he needs to know how long they're vaild for
- should be good ror 3 years from the date he got it i just got mine new one last month for a sit down fork lift and crane/ trolly and its good till march 2010
- Q: I was half way through this book and had to stop reading it because school got in the way. I'm back to reading it and I got to the part where Katniss made a noose and tied it around a dummy and showed it to the Gamemakers. And she wrote 'Seneca Crane'. I don't remember who that was. If it was even a person, I guess it was. But can you just explain who or what 'Seneca Crane' is and why Katniss would do that? Thanks.
- I think it's one of the gamemakers, but that's just a guess.
- Q: Could anyone tell me how they erect a construction crane.Some how they just are suddenly THERE, as If by magic.It seems as though the Boom part of the crane must be kind of JACKED up into place.That is the only way I can see them getting those GIANT concrete blocks into the back end of the boom. It doesn't seem possible otherwise. The only other thing I can thing of is the bulk of the pieces are brought in by helicoper and attached.Everything kind of makes sence except the Giant concrete blocks used as a counter weight. ALSO, if the blocks are needed to act as counterweigth to the CRANE itself..why doesn't the Crane fall over when it picks stuff up???
- How do they erect the construction cranes? Not very well according to the news of them toppling down of late. Seriously, the cranes are lifted upward one or two floors at a time as the building progresses upward - this is usually accomplished by pulling them up into place with heavy cables and powered winches.
- Q: I will soon have folded my 1000th paper crane. What should I do with them after I am done?
- Set them on fire somewhere safe and controlled. The fireplace? String them together and make a long chain to use like garland or streamers. Hang them from the stairs.
- Q: I have to answer some questions about an except from Where I Lived, and What I Lived For by Henry Thoreau. I don't need an explanation for all the metaphors he uses and what they mean, but what is he talking about with the Pygmy thing? Do the pygmies battle the cranes because... they want to eat them? Are cranes just d!cks? Is a crane some type of weapon?
- Pygmies Definition
- Q: What are the common problems encountered in hiring cranes for house constructions?
- Access, I assume you need a Franna. Possibly for frames and or trusses to the second level or steel beams. You will be limited by reach if the crane can only access the front of the house. In which case you may need a slew crane 30t or larger. Know the weights of what has to be lifted and the distance from the crane to where it will be placed. A crane cannot set up or travel over underground services or recently filled excavation. These things could mean the crane has to set up even further away from the house. If the crane is for unloading trucks, access again. Cranes need to stay about 3meters from power lines which is a common problem bringing gear onto site. While a slew crane generally sets up in one position for all lifts (some can travel) a Franna is designed specifically for pick and carry. It can unload trucks and travel the gear onto site under the power lines. Provided it isn't lifting extra large items. Speak with the provider about what has to be done, it will be all to familiar for any decent company. As long as access is fine and underground services won't hinder you they should know exactly what you need. Be prepared, usually a minimum 4hr hire. If you think the task is going to take longer you need to plan what has to be done and have everything ready for placement. Organization is paramount, you don't want a crane and it's crew sitting there doing nothing because you didn't plan ahead. Hope this helps, I could have been more specific if the question had some details.
Send your message to us
TOWER CRANE TC3508
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords