TOWER CRANE H6024 TC6024 MAX. LOAD 12TON
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Brief Description
Feature: Tower Crane
Condition: New
Application: construction
Rated Lifting Moment: 200MT
Max. Lifting Load: 12T
Max. Lifting Height: 183.7m
Span: 60M
Place of Origin: China (Mainland)
Brand Name: CNBM
Model Number: H6024
Main features
TC6024 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:
Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.
The tower crane with features as high working speed, stead work condition and high efficiency.
Hoisting jib has 55m or 60m and 65m three ranges. This meets project needs more widely.
The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.
Location of the tower crane is reasonable, and the externality of the crane is beautiful.
Lifting jib adopts rigid double tension bars with features as light structure.
?the operation is simple and the maintenance is convenient
Parameter List
Packaging & Delivery
Packaging Details: | In Nude/40'HQ/ Wooden case |
---|---|
Delivery Detail: | 30 |
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Service
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
- Q: Jin Title required 20 large equipment testing reports. The personnel system is really rubbish, so we don't know what to do professionally.
- General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
- Q: How to calculate the pouring and maintenance of tower crane concrete in valuation?
- Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
- Q: What are the basic parameters of a tower crane?
- The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...
- Q: Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
- 1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.
- Q: need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
- Jib Crane Design
- Q: More specifically, do Sandhill Cranes eat squirrels?
- NO!!!!!!!!!!!!!!!
- Q: Has anyone actually folded 1000 paper cranes? i want some proof
- no and no proof
- Q: Grade 4 build a working crane Help!?
- I would use about a 2 foot piece of broomstick pinned through a hole in one end. Maybe 2 to 3 inches away, a larger clearance hole with a 1/4-20 nut glued under. Use a lo-o-ong 1/4-20 bolt as a driver. (1/4-20 is 1/4 inch diameter with 20 threads per inch.) I leave the mounts and string up to you as to encourage your participation and creativity.
- Q: How much should the verticality of a tower crane be controlled? Thank you
- No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
- Q: My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
- Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
Send your message to us
TOWER CRANE H6024 TC6024 MAX. LOAD 12TON
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords