Tower Crane TC6024 Max. lifting weight 10 T
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of TC6024 tower crane
Feature: Tower Crane
Condition: New
Max.Lifting Load: 10T
Span: 60m
Place of Origin: China(Mainland)
Model Number: TC6024
Packaging & Delivery of TC6024 tower crane
Packaging Detail: Nude package
Delivery Detail: 25-30days
Specifications of TC6024 tower crane
● Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
● Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable,can provide stepless speed regulation.
● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 2.4 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YZPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-5.5KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight (t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 63 | |||||||
Power supply requirement (KVA) | 230KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
Startup voltage & current | 380V×95%=361V 219A | |||||||
Rated working voltage & current | 380V 121A |
Images of TC6024 tower crane
FAQ of TC6024 tower crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
To Lead The Revoluation of International Trade
- Q: Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
- Kung Fu Crane Stance
- Q: Probably my favorite of the jumping kicks I practice, and I'm curious what experiences you guys have had with it. I've caught people of guard with it after using a crescent or roundhouse kick in kickboxing, and I've done it with a knee to the chest then the kick to the head in Muay Thai. I've also practiced the ten foot kick (using the initial foot up to propel yourself forward instead of up) and crossed the ring to the opponent before they could move. What are your thoughts? What kind of variations do you practice? Ever had any good/bad results from it?
- The bicycle/crane is my favorite I've winded people very easily with a quick one to the chest
- Q: How good a job do you think Crane did in voicing the theme of pride/morales in Red Badge of Courage?
- If you believed in the characters with their flaws and their goals, Crane did a good job. Henry Fleming's attitudes towards heroism and war seem to be changing as his experiences increase. What is significant about both pride and fear?
- Q: I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
- I studied in in university - it's contemporary to when it was written, so it may as well be set in 1893. Crane was in his early 20's when he wrote it. He was addressing a societal issues of the day, particularly living in the slums of New York and the shift in American culture/economy from primarily agricultural to industrial. It addressed poverty, disaease, social ills and the dreariness of poor city life. The book was quite controversial when it first came out.
- Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q: Im looking for more information on Overhead Cranes!?
- Advantages of Overhead Crane for Professionals When large materials have to be handled in the building, construction and mining industries, there are several types of equipment that would be used. One of such equipment is the overhead crane, and because of its size, it is conspicuously seen at construction or mining sites. Not only does it have a domineering figure but it is also a very versatile equipment for moving heavy materials from one point to the other. This equipment occurs in many forms and the various forms it has, makes it adaptable to many environments. There are other types of equipment that are available for lifting, but a crane is the preferred choice of many people. I got most of this information from www.hoistandwinch .uk There are several reasons people in the construction and mining industries would choose a crane over other equipment that are used for lifting. With overhead cranes, there would be absolutely no need to clear aisles before materials can be moved. Forklifts or fork trucks could have their paths blocked and a lot of time and energy would have to be diverted to clear an aisle. Obstructions that could even make you suspend important projects are irrelevant to overhead cranes because they would easily make it around them without any form of difficulty. It is therefore possible to arrange your plant floor the way you would want it to be for your business, without thinking about obstructions to the lifting and movements of materials with cranes to do all the task for you.
- Q: how do you win at the crane game?
- im the master of the crane game. You gotta scope out the animal first! If it looks heavy then dont even bother. Whenever you grab hold of something its gonna pull it up and shake when it hits the top right? Thats why you go for something close to the hole it drops in. They have one where I work so I lock the wheels, grab the animal and pull the whole machine forward so that it just falls in the hole lol.
- Q: a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
- If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules
- Q: I have tried so many times to make that crane, and i always fail. Can anyone give me a video that is really good, or instructions that are really good and have pics? Thanks in advance!
- heres one with others on the page. happy folding
- Q: heres a picture of one
- they are put up section by section with another crane
Send your message to us
Tower Crane TC6024 Max. lifting weight 10 T
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords