• Tower Crane TC6024 Max. lifting weight 10 T System 1
  • Tower Crane TC6024 Max. lifting weight 10 T System 2
  • Tower Crane TC6024 Max. lifting weight 10 T System 3
  • Tower Crane TC6024 Max. lifting weight 10 T System 4
  • Tower Crane TC6024 Max. lifting weight 10 T System 5
Tower Crane TC6024 Max. lifting weight 10 T

Tower Crane TC6024 Max. lifting weight 10 T

Ref Price:
$40,000.00 - 200,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details of TC6024 tower crane   

 

Feature: Tower Crane                          

Condition: New                                           

Max.Lifting Load: 10T

Span: 60m                                             

Place of Origin: China(Mainland)              

Model Number: TC6024         

 

Packaging & Delivery of TC6024 tower crane   

 

Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Specifications of TC6024 tower crane   

 

● Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

 

● Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable,can provide stepless speed regulation.

 

● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.

 

Free standing height (m)

50.5

Max height with attachment (m)

200

Working range can be adjustedm

485460

Min working rangem

2.5

Max lifting capacityt

10

Tip load @ 60mt

2.4

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YZPBE132S-4-5.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-5.5KW×2

Climbing speedm/min

0.5

Counterweight  (t)

48m jib  

54m jib

60m jib

15.45

17.85

18.9

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

63

Power supply requirement (KVA)

230KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      219A

Rated working voltage & current

380V                 121A

Images of TC6024 tower crane   

 

 

FAQ of TC6024 tower crane   

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

 

 

To Lead The Revoluation of International Trade

 

Q: Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
Kung Fu Crane Stance
Q: Probably my favorite of the jumping kicks I practice, and I'm curious what experiences you guys have had with it. I've caught people of guard with it after using a crescent or roundhouse kick in kickboxing, and I've done it with a knee to the chest then the kick to the head in Muay Thai. I've also practiced the ten foot kick (using the initial foot up to propel yourself forward instead of up) and crossed the ring to the opponent before they could move. What are your thoughts? What kind of variations do you practice? Ever had any good/bad results from it?
The bicycle/crane is my favorite I've winded people very easily with a quick one to the chest
Q: How good a job do you think Crane did in voicing the theme of pride/morales in Red Badge of Courage?
If you believed in the characters with their flaws and their goals, Crane did a good job. Henry Fleming's attitudes towards heroism and war seem to be changing as his experiences increase. What is significant about both pride and fear?
Q: I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
I studied in in university - it's contemporary to when it was written, so it may as well be set in 1893. Crane was in his early 20's when he wrote it. He was addressing a societal issues of the day, particularly living in the slums of New York and the shift in American culture/economy from primarily agricultural to industrial. It addressed poverty, disaease, social ills and the dreariness of poor city life. The book was quite controversial when it first came out.
Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q: Im looking for more information on Overhead Cranes!?
Advantages of Overhead Crane for Professionals When large materials have to be handled in the building, construction and mining industries, there are several types of equipment that would be used. One of such equipment is the overhead crane, and because of its size, it is conspicuously seen at construction or mining sites. Not only does it have a domineering figure but it is also a very versatile equipment for moving heavy materials from one point to the other. This equipment occurs in many forms and the various forms it has, makes it adaptable to many environments. There are other types of equipment that are available for lifting, but a crane is the preferred choice of many people. I got most of this information from www.hoistandwinch .uk There are several reasons people in the construction and mining industries would choose a crane over other equipment that are used for lifting. With overhead cranes, there would be absolutely no need to clear aisles before materials can be moved. Forklifts or fork trucks could have their paths blocked and a lot of time and energy would have to be diverted to clear an aisle. Obstructions that could even make you suspend important projects are irrelevant to overhead cranes because they would easily make it around them without any form of difficulty. It is therefore possible to arrange your plant floor the way you would want it to be for your business, without thinking about obstructions to the lifting and movements of materials with cranes to do all the task for you.
Q: how do you win at the crane game?
im the master of the crane game. You gotta scope out the animal first! If it looks heavy then dont even bother. Whenever you grab hold of something its gonna pull it up and shake when it hits the top right? Thats why you go for something close to the hole it drops in. They have one where I work so I lock the wheels, grab the animal and pull the whole machine forward so that it just falls in the hole lol.
Q: a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules
Q: I have tried so many times to make that crane, and i always fail. Can anyone give me a video that is really good, or instructions that are really good and have pics? Thanks in advance!
heres one with others on the page. happy folding
Q: heres a picture of one
they are put up section by section with another crane

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches