TOWER CRANE H5015 TC5015 MAX. LOAD 6TON RADIUS 50M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 3 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Tower Crane
Condition: New
Application: construction, port
Rated Lifting Moment: 63t.m
Max. Lifting Load: 6T
Max. Lifting Height: 140m
Span: 50m
Place of Origin: China (Mainland)
Brand Name: CNBM
Model Number: H5015
Main Fatures
TC5015 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:
Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.
The tower crane with features as high working speed, stead work condition and high efficiency.
Hoisting jib has 55m or 60m and 65m three ranges. This meets project needs more widely.
The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.
Location of the tower crane is reasonable, and the externality of the crane is beautiful.
Lifting jib adopts rigid double tension bars with features as light structure.
the operation is simple and the maintenance is convenient
Porformance Table
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Services
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
- Q: I am going to make 1000 paper cranes like Sadako Sasaki did. I am doing it to remember the victims of hiroshima and nagasaki and all the others who died as a result of wwii. especially sadako sasaki who, though she died in 1955, she was poisoned by the toxic gases in hiroshima. what do you think of my project, and got any tips to help?
- Well first of all, i highly recommend that buy some Anti-Pope spray just in case you have jesus christ knocking at your door. Then i recommend that you make a cake. Preferably , a banana, as this is my favourite. And send it to me in the mail. By now, i will bless you that your house and family as well as friends, are all wished well and that you are not killed from one of your paper cranes stabbing you in the eye. I also recommend getting life insurance. God only knows how sharp paper is and it rly rly hurts. Then eat some Chicken, Avacado Sushi because everyone knows that is brain food. I finish off by commending you and by saying. See you on monday.
- Q: How can you tell the difference between a mosquito and a crane fly?
- Crane flys are much larger than mosquitoes. They look like mosquitoes on steroids.
- Q: Notice of tower crane
- Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
- Q: What is the difference between a crane and a crane in a tower crane?
- Informal: hoisting signal worker: refers to the signal flag!Cable man: rope!
- Q: Please help!
- there are several kata, that was influenced by it, like niahanchin (tekki), chinto, rohai and many others
- Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
- Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
- Q: How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
- A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
- Q: What are the four major moving mechanisms of a tower crane?
- Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
- Q: Tower crane body standard section connection bolt screw upward or downward, why?.
- Up or down, there is no change in the firm torque of the connecting bolt. Simply choose to go up or down for convenience. Generally no special requirements, it is recommended that the thread upward, so that it is not easy to rust.
- Q: How do cranes use geometry?
- If your referring to cranes in construction cranes, then it might form a right triangle with the ground implying the use of trigonometry which is a part of geometry.
Send your message to us
TOWER CRANE H5015 TC5015 MAX. LOAD 6TON RADIUS 50M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 3 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords