• Tower Crane 8 Ton TC6014  Standard Section System 1
  • Tower Crane 8 Ton TC6014  Standard Section System 2
  • Tower Crane 8 Ton TC6014  Standard Section System 3
  • Tower Crane 8 Ton TC6014  Standard Section System 4
  • Tower Crane 8 Ton TC6014  Standard Section System 5
Tower Crane 8 Ton TC6014  Standard Section

Tower Crane 8 Ton TC6014 Standard Section

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
8T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.4T
Span:
60M
Rated Load Moment:
100T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6014(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC6014

 

Independent   height (m)

46

Max height   with attachment (m)

138200

Working range   can be adjustedm

485460

Min working   rangem

2.5

Max lifting   capacityt

8

Tip load @ 60mt

1.4

 

Hoist   mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFC250M-4/8     30/30KW

Trolleying   mechanism

Speedm/min

53/27/12

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing   mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing   speedm/min

0.5

Counterweightt

17.0

Mast section   sizeL×W×Hm

1.6×1.6×3.0

Working   temperature

-40+60

Total Power (KW)

42

Power supply   requirement (KVA)

190KVA for   generator

Cable type (   within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2,   5 cores

Startup voltage & current

380V×95%=361V      179A

Rated working voltage & current

380V                 128A








Loading diagram

 

60m jib length

R (m)

2.5-22.4

30

40

50

60

a=2 (kg)

4000

3646

2630

2014

1400

R (m)

2.5-11.245

20





a=4 (kg)

8000

5564

3573

2560

1944

1330








 

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Mast Section MC Factory

 

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q: The crane will only be needed once. Is it possible to hire them?How much in general would a company charge to bring one in?
Costs would include the distance the crane travelled and also the size of the crane needed and it could start at $350 per hour up to $1000 although I'm sure those prices would include the drivers costs also.A quick look in your local yellow pages for crane hire firms and a few phone calls would give you a better idea.
Q: what would you wish for?also, when your done making your 1000 cranesm what do you need to do next? to like, make your wish come true??
1,000 paper cranes? like sadako? i love that story! 3 wish for anything you want, i've never heard of a limitation of what you could wish for :) i've also never heard of something else you had to do after you made the cranes to make your wish come true, so i'm pretty sure all you have to do is fold the cranes.
Q: i need a list of materials and a step by step precedure
I am assuming you mean a low power, miniature crane. You will want to wrap a iron object (a nail should work for light objects) in electrical wiring, the more times the better. Make sure you have a long length of wire after wrapping it around the iron object. Now, attach a rope to the iron object, this will be used to raise and lower it. The length of the rope has to be less than the length of the wires. Now, inside the crane have a battery. The stronger the battery, the stronger the electromagnet. Now, after connecting one of the wires to the battery, connect another one to a switch, then connect then switch with more wiring to the battery. This will turn the crane's claw on and off. The next part is up to you. If you want to be able to raise and lower the magnet, attach the rope to an axel and spin the axel to raise or lower the magnet. If you want to turn the crane, you need to place the arm on a swivel axis. Finally, to bring the magnet closer or farther, you will need a way to raise the arm, bringing the tip of the arm closer to above the center of the crane. I suggest you google some picture of cranes to understand this better.
Q: how do they get the construction crane onto the the tall buildings?
There are two cranes, one lifts the other and construction workers build a scaffold under it. Then the higher crane lifts the lower one and the workers buiold a scaffold under it, this continues until they are as high as they need to be.
Q: death... by exile!Also, which Batman movie was your favorite and why?Mine was the first because it was cool to see how Wayne started and got all the Batman stuff and the movie was less confusing, haha. Plus I thought the actor Cillian played Scarecrow really great :)
Yes, that was such a nice surprise. He was a great villain in Batman Begins. For a split second, I was like Wait a minute - the last time I saw Dr. Crane, he was freaking out on that Toxin they released into The Narrows. . ., but then, I remembered - he and everyone else affected by that poison were given the antidote after it was produced by Wayne Enterprises. His role as the judge at the sort of Reign Of Terror style court system is perfect - Crane clearly enjoyed watching people suffer mentally, liked seeing them terrified. Sadistic little twerp. Tough call on favorite.. . while I think the first two thirds of The Dark Knight are probably the very best of the series. . . my personal fave is Batman Begins, too. I can remember the first time I saw it, and as they're showing the establishment shot of those mountains in Asia, Raz Al-Ghul's lair. . . I kept thinking, this is different than any other Batman stuff I've seen - this is cool! Kinda sad it's over! :( Edit - And I just wanted to add - I've used that line Bruce's dad says with my own little son: Why do we fall? :)
Q: Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q: what is that max torque it can with stand when the max laod it can handle is 811 N?i can NOT get this question, its driving me crazy!HELP????? thank you
I don't know if this is a question you got out of a book, or something you are trying to apply on a jobsite, but I would hate to see you try and use this approach with expensive equipment and innocent lives in the balance. Learn to use the crane charts. They account for many factors, including the weight of the boom, the tipping moment, the strength of the ropes, the engine's power, and the structural integrity of the boom.
Q: i just ordered a new JG 614 crane stock and do not know how to use the crane stock i would like to learn before it arrives can i have a link to a video or explanation please
You first need a crane stock battery, as a normal battery won't fit in just one side of the crane stock. When you but the battery, you'll have two or three clusters of cells. Begin experimenting with the cord placement in the stock, by putting one cluster on one side and one (or two) on the other. You'll see what I mean when you get the gun. That's all there is to it, just a little experimenting.
Q: When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q: Ever felt like a paper crane?
Physically, folded to and fro, folded back over again, then backwards with a bent beak and wings enabling me to creatively go beyond all limitations of an ordinary piece of colored paper. Many journeys traveled as a paper crane, lion, and dragon!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords