Tower Crane TC7135 Double-trolley Type
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of TC7135 tower crane
Feature: Tower Crane
Condition: New
Max.Lifting Load: 16T
Span: 71m
Place of Origin: China(Mainland)
Model Number: TC7135
Packaging & Delivery of TC7135 tower crane
Packaging Detail: Nude package
Delivery Detail: 25-30days
Specifications of TC7135 tower crane
● Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.
● Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.
● Take double-trolley type, greatly enhance lifting performance.
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Images of TC7135 tower crane
FAQ of TC7135 tower crane
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
To Lead The Revoluation of International Trade
- Q:What time period would you consider that Stephen Crane wrote in? I have no idea. By time period, I mean like the kind of writing from those times. Ex: Renaissance Period.
- Stephen Crane (November 1, 1871 - June 5, 1900) was an American novelist, poet and journalist. He was born in Newark, New Jersey, the 14th child of a Methodist minister. He died when he was 28. Sorry I don't know what it's called.
- Q:I know, do you know?
- They build it on the ground, raise it up with another crane, and then lift the counter weights up!
- Q:Which one is a better investment? I can get both for 200dollars
- Probably an engine crane (engine hoist). Engine support you still need to lift the engine for the engine support. You hardly ever need to maneuver the engine to do a timing belt. Edit: I have one of the portable lifts what some refer to as a cherry picker. I've never had the need for an engine support.
- Q:why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
- High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
- Q:how do construction crews put up a crane?
- They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
- Q:what does dog everything mean in crane lift lingo?
- it means to stop the crane from doing anything, just sit still untill otherwise told to carry on
- Q:how does the power electronic drives employed in cranes?
- Most large cranes run electrical motors. Depending on what power is available at the site, the crane may run from a generator or be powered by the grid. The power requirements depend on the size of the crane. Larger cranes may use a six-pole, three-phase, one-wye, 440-volt circut. Smaller cranes could use a three-phase 220-volt circuit.
- Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
- No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
- Q:I am in dyer need of a camera jib wih very little budget and/or tools to build one. I am wondering if i can use a cymbal stand for a crash cymbal as a camera jib? My idea is to modufy it by attatching a small piece of wood to the top screw where you would put a cymbal the screw in an L piece (metal) to it or attach it ti the arm of the stand and just snigly fit it so as the arm is raised and lowered the L pice compensates and stays strait. i would attach the camcorder to the L piece with a 1/4 inch screw and washers. i also need the arm to move smoothly will this work with a crash stand. all advice i am grateful for thanks
- The angle of the cymbal on the stand determines the amount of vibration being transferred to the stand. A cymbal on a boom arm verses a straight stand, a heavy tripod verses a lightweight base sounds drastically different. Boom stands can make some cymbals rumble. When boom cymbals stands are somewhat close to staight stands, arm placed close to 180 degree, the cymbal will rumble less.
- Q:I am Dr Crane is there anything you would like to know? i can answer all your questions?
- How are you supposed to do that! Ok here is my question: Who are you really and why have you been stalking me the past 4 nights?
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC7135 Double-trolley Type
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords