Topkit/Inner-Climbing Tower Crane Lifting Machine Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our tower crane:
1. TC5516(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 55m, TC5516(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Provide stepless speed regulation. Oustanding in working efficiency, operating stability and reliability.
6. Reduce future maintenance cost.
7. With scientific layout and beautiful appearance.
8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
9.After sales service will be offered which will get rid of all your worries in the purchase of our products
Features of our tower crane:
Item | Parameter | ||||
Free standing height (m) | 44 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 45/50/55 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 55m(t) | 1.6 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | YZTDE132L-4/8/16 3.3/2.2/1.1KW | ||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 17.6 | ||||
Mast section size(L×W×H)mm | 1600×1600×3000 | ||||
Working temperature | -40-+60°C | ||||
Total power(KW) | 42 | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V/128A | ||||
FAQ;
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q:Its on of the biggest helicopters in 1952-1955 I just need any information via you, internet, or even blue prints!I highly doubt that blueprints are probably destroyed
- if you want a more reliable source try these books: Jim Winchester The World's Worst Aircraft, 2005 (pg. 134-135) Rene J. Francillon McDonnell Douglas Aircraft since 1920: Volume II, 1997 I hope this helps!
- Q:An Episode Of War by Stephen Crane
- Crane saturates his writing with similes and metaphors.
- Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
- In short, when the tower rotates in the form of a tower, the tower is stationary (ie does not follow the rotation), and the form of the lower turn is the tower will rotate.
- Q:what is the proper way to fold a paper crane?
- I would go to a library or a book store and find a book on origami.
- Q:what is the crane track base ?
- Assuming mechanical I suppose that is the size of the area of the two tracks on a crawler type crane. The tracks or treads are similar to those on a tank or bulldozer. One track covers a rectangle in contact with the ground. Both tracks are spread apart, parallel and form some kind of rectangular (length x width) base area for the crane.
- Q:.......rated by the ________ weight it will lift at a ________ radius and ________ boom length.A. Maximum; minimum; maximumB. Minimum; maximum; maximumC. Maximum; minimum; minimum
- All maximum. On some of the older cranes it's written on a plate: so many tonnes at so much radius etc. In the really good old days a pointer needle was on the side of the jib pointing to a scale in tonnes, variable as the jib went in/out/up/down. If you think about it, there's no other way to rate a crane apart from its maximum performance. Hope this helps.
- Q:In the case of tower crane operation, the operation should be stopped
- In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
- Q:i have a 83 camaro crane cam 305 v 8 4brrl edelbrock carb and i just changed the carb from a quadrajet to the edelbrock....but i cant seam to get it running right as long as im out on the highway it runs great but when i stop at a stop light i have to rev it up to keep it running..i changed the plugs plug wires and the distributor but i heard you have to have a different kind of distributor to change from the quareajet ( will all of the plug in and stuff to a regular edelbrock carb..is this true??
- If you can get vacuum from the intake manifold to the distributor advance, there is no reason to change distributors. You may need to re-jet the idle. Also if the cam is too steep and/or the carburetor is too big, the engine will flood. Check with Crane on timing changes and idle settings. The idle may need to be set up a little.
- Q:This has nothing to do with travel, I'm just curious. I hate it when the news doesn't follow up on stories they focused on earlier. Does anyone have a status update on that crane that was swaying in the wind during Sandy?
- My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker
- Q:I know that the whooping crane population recovered through captive breeding but how many are left currently (right now).
- There were 535 total in 2009--the population increased slightly last year but I have not seen a total for the population of 2010. Deaths can occur at any time so the number changes constantly. The Journey North site counts 281 adults in the wild western population and 106 birds in the reintroduced eastern flock. They did not give a number for the birds in captivity so I cannot give you a total. You can follow the reintroduced whooping crane population and their migration each spring and fall on the Journey North (in fall called Journey South site). They also track song birds and hummingbirds and monach butterflies.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Topkit/Inner-Climbing Tower Crane Lifting Machine Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords