• Building Machinery Factory Topkit Trolleying Tower Crane Motor System 1
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 2
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 3
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 4
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 5
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 6
Building Machinery Factory Topkit Trolleying Tower Crane Motor

Building Machinery Factory Topkit Trolleying Tower Crane Motor

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Building Machinery Factory Topkit Trolleying Tower Crane Motor


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Building Machinery Factory Topkit Trolleying Tower Crane Motor


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Building Machinery Factory Topkit Trolleying Tower Crane Motor

ItemParameter
Free standing height (m)50
Max height with attachment (m)200
Working range can be adjusted(m) 50/55/60/65/70
Min working range(m) 2.5
Max lifting capacity(t)20
Tip load @ 70m(t)5
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-50-100-100-20
Speed(m/min)0-800-400-400-20
MotorYZPBF280S-4-75KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-60
MotorYPBE132M-4-11KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTRVF 132M2-4-9KW×3
Climbing speed(m/min)0.45
Counterweight(t)25
Mast section size(L×W×H)mm2450×2450×5000/2500×2590×6000
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)115
Rated working voltage & current380V/273A

Building Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane Motor

Building Machinery Factory Topkit Trolleying Tower Crane Motor


Building Machinery Factory Topkit Trolleying Tower Crane Motor

FAQ Building Machinery Factory Topkit Trolleying Tower Crane Motor

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: dimentions of crane rail, crane beam.
What kind of crane? There are thousands of types.
Q: What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
Q: Who thinks William Shatner is adorable as Denny in Boston Legal? I do!! I just want to pinch his cheeks. He looks so lovable (in a chubby old guy kind of way. Lol.)AhahaAnd Shirley. She's so funny.Lincoln, suck. my. lobe. lol!Anywho...answer my denny question!!
William Shatner made a huge leap in his career when he made fun of himself in Airplane! Pt II. He was so funny as Commander Murdoch of Lunar Station! Ever since then, Shatner has not shied away from playing a crazy old dude. Denny Crane is the archtype of looney old guy who still yearns for the ladies...all of them. I kinda know how he feels!
Q: I just made origami cranes and want to hang them up, each by themselves with just a peice of string....how should i go about doing this? how is it usually done?
TAke a needle threaded with a long piece of black thread, and make a small knot at end of long thread. Push the needle thru the middle of the crane's back and pull the thread all the way thru the hole till the knot catches. pull the needle off the loose end of the thread and make another knot on that end. take a push pin or thumb tack and push the pin thru the knot, then push the pin or tack into the ceiling. FYI, tape never works - I have tried. The black thread lets them flutter a bit, and is invisible most of the time. p.s. ask your parents if you can hang stuff from the ceiling first. they may not want you to do that since it will leave holes in the ceiling when you take them down.
Q: What are the impacts of construction cranes on the human society?
construction cranes enabled the building of multiple story buildings which fostered urbanism. It changed the village oriented way of life in America, for good and bad. We became more boadly oriented in our business ventures which increased the stanting of the U.S. in world affairs, but it decreased the degree of brotherhood people felt for each other as they left their roots and dwelt amongst relative strangers.
Q: for example: erection, technical data...
A bridge crane is one that looks like a bridge (sorry I am tired). It sits on two railway tracks. One at either side of say a building. The tracks are at a fair height. The crane bridge spans between the tracks. Long travel is when the crane moves along the tracks. Cross travel is when the 'crab' moves sideways along the bridge. The crab has the hoist on it with a drum and cable type arrangenment. The lifting gear or hook is attached to the cable. They are very useful in factories for transporting large parts from one process to another. They transport pretty well anywhere in a well designed building in that Long Travel can be X cross travel can be Y and hoist up and down can be Z.
Q: So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
Well I don't think u have anything to feel bad about. Does everyone need to be treated like some kid of a hero because they have cancer? I think that is stupid. With all the people in the world everyone is gonna dislike someone. A ***** is a ***** no matter what disease she may have. After you fold 1000 cranes I think you are supposed to make a wish. Now if you wished that there was something that would remove her from your class, then I would feel guilty.But other than that I don't think you have anything to feel bad about. Or if you were really hard on her too but don't think that jut because she has cancer that she can be a ***** and everyone has to worship her. That is just bullshit. If she gives **** than she must be prepared to take ****. And as for giving them to her, I think it would be a nice gesture, but just think about it. What would you do if someone gave u a thousand paper birds? I think very few people would keep them. Now I don't know if you are supposed to give them away, but if you are, I think you should ive them to someone who means something to you personally and not because they have a disease. It is human nature to not like someone and just because they have cancer it shouldn't change that unless this experience has made them a better person and all that **** that you always hear about. But I don't think you have anything to feel bad about and not liking a teacher is completely normal. Please e-mail me your thoughts on this.
Q: Protected cranes are nesting in pine trees with possible disease carrying bird droppings covering drive way and street where neighborhood children play. I've called several local organizations only to be told there is nothing I can do since they are protected by law. These birds return every year and stay for about 4 months - each year gets worse with droppings and stench. Daily cleaning is required but that still does not keep the areas around them clean.
Give the U.S. Fish and Wildlife Service a call I'm sure they will help in some way.
Q: what are the effects of fiction in cranes?
Huh? Cranes like the bird or like the construction equipment?
Q: A site would be nice...
For themes, I wrote Fast Rode the Knight, written by Stephen Crane, is a short poem about a knight going into battle, and his forgotten horse. Some themes in this poem are love and devotion, battles in war, the passion that drives the soldiers, or knights, into it, the forgotten aftermath of the battles, and what has to be left behind for such a battle to be fought. The passion of the knight can be found in the lines Ever waving an eager sword/’To save my lady!’. The knight rides at a furious pace, driven by love and a blinding devotion to his love, or perhaps his Ruling Lady. thats just like the beginning, hope it can help you :D It's not nearly finished, but hope it is okay all the same :)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords