Building Machinery Factory Topkit Trolleying Tower Crane Motor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our Building Machinery Factory Topkit Trolleying Tower Crane Motor
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our Building Machinery Factory Topkit Trolleying Tower Crane Motor
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our Building Machinery Factory Topkit Trolleying Tower Crane Motor
Item | Parameter | ||||
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50/55/60/65/70 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 20 | ||||
Tip load @ 70m(t) | 5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-5 | 0-10 | 0-10 | 0-20 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280S-4-75KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-60 | |||
Motor | YPBE132M-4-11KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YTRVF 132M2-4-9KW×3 | ||||
Climbing speed(m/min) | 0.45 | ||||
Counterweight(t) | 25 | ||||
Mast section size(L×W×H)mm | 2450×2450×5000/2500×2590×6000 | ||||
Working temperature | -40-+60°C | ||||
Max working wind(m/s) | 20 | ||||
Total power(KW) | 115 | ||||
Rated working voltage & current | 380V/273A | ||||
FAQ Building Machinery Factory Topkit Trolleying Tower Crane Motor
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: If a friend folded a thousand paper cranes for you what would you think?
- If a friend folded even a single crane for me it would be enough.I'd feel lucky for sure.Its the feelings of your friend that counts not Sadako's theory.
- Q: I already have 864 cranes and I wanna know what kind of wishes can I make? And are there consequences?Can I wish something like my mom won the lottery and we become rich? (Just an example!)And can you wish for death? (Just a question!)
- You can make whatever wishes you want. Just remember that the wishes you make reflects what kind of person you are. So maybe you should make wishes you can be proud of. Also remember, if wishes were horses beggars would ride If you for example would wish that you would have $10, your wish is most likely to be fulfilled if you manage to sell each origami crane for 1 cent... Generally wishes come true if you really work for them, Not by sitting, doing nothing and wishing.
- Q: Is their a difference between a flamingos and cranes birds?
- their beaks and feather coloring
- Q: What species of crane/heron is at 3:07 of this video?
- It is a stork, not a crane or heron. The painted stork, Mycteria leucocephala. The first pic in this link does not make the identification clear..
- Q: how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q: I was wondering if Steam Cranes are still used to clear train derailments or are the all mothballed now? What do they use to clear derailments now days if the not the Steam Cranes? Also way are there 2 types of hooks on the crane anyway? Thanks
- No, they don't. They have to use road cranes - think of the accident at Grayrigg some while back. They had terrible trouble clearing the line as heavy lifting equipment had to be brought quite a distance over muddy fields. I seem to remember special temporary roads had to be laid. Similarly with the freight accident in Scotland a few weeks back, roads were closed, again whilst wreckage was cleared.
- Q: I only wish to know about Tower Cranes, not any other type of crane. Also only wish to know about cranes on the job, not sitting in a crane yard. I am an operator and looking to move and want to know where the work is best so a list of top five would be terrific. Thanks.
- We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.
- Q: What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
- The okorder /
- Q: Which one is a better investment? I can get both for 200dollars
- Hi JAY ... Neither is a large investment compared to the time and work using them involves. Lifting an engine requires a lot of work getting stuff disconnected and , even worse, reconnected when put back. Of the two, I believe the crane would more useful. When considering such projects, you should take into account all your work and time the project will take. Whatever, I wish you the best.
Send your message to us
Building Machinery Factory Topkit Trolleying Tower Crane Motor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords