• Building Machinery Factory Topkit Trolleying Tower Crane Motor System 1
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 2
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 3
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 4
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 5
  • Building Machinery Factory Topkit Trolleying Tower Crane Motor System 6
Building Machinery Factory Topkit Trolleying Tower Crane Motor

Building Machinery Factory Topkit Trolleying Tower Crane Motor

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Building Machinery Factory Topkit Trolleying Tower Crane Motor


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Building Machinery Factory Topkit Trolleying Tower Crane Motor


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Building Machinery Factory Topkit Trolleying Tower Crane Motor

ItemParameter
Free standing height (m)50
Max height with attachment (m)200
Working range can be adjusted(m) 50/55/60/65/70
Min working range(m) 2.5
Max lifting capacity(t)20
Tip load @ 70m(t)5
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-50-100-100-20
Speed(m/min)0-800-400-400-20
MotorYZPBF280S-4-75KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-60
MotorYPBE132M-4-11KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTRVF 132M2-4-9KW×3
Climbing speed(m/min)0.45
Counterweight(t)25
Mast section size(L×W×H)mm2450×2450×5000/2500×2590×6000
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)115
Rated working voltage & current380V/273A

Building Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane Motor

Building Machinery Factory Topkit Trolleying Tower Crane Motor


Building Machinery Factory Topkit Trolleying Tower Crane Motor

FAQ Building Machinery Factory Topkit Trolleying Tower Crane Motor

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: who invented them and why do people make them?
in Japanese folklore if you fold a 1000 origami cranes you get are granted a wish, usually concerning health/long life. The peace part comes from the story of Sadako Sasaki a victim of the Hiroshima atomic
Q: how can I get rid of what looks like small crane flies in my yard and house. they seem to get in the grass?
This a common problem. You have a hole in your door and a hidden stink in your house. Another way to get rid of them is you buy a bug spray, turn it on, then leave the house for 1-3 hours.
Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
I okorder /
Q: When the earthquake happened, the children wanted to know what they could do to inform other students and raise awareness for the people in Japan. So, we decided to do a show on the earthquake, and to also making the cranes, the origami cranes.thank you! a foreigner. (detail)
To also make the cranes is the correct way to say it. To also making the cranes is incorrect.
Q: It seems like every time I turn on the news there is another crane collapse. I don't know if it is the same problem every time, but it seems awfully suspicious. Does anyone know why crane collapses seem so common lately? Has it always been this way?
You okorder .. This chart is not definitive, it leaves out many occupations (such as mining), it only considers fatalities (not loss of limbs, etc.) but it conveys the general picture. For hard data look at: www.bls /iif/
Q: The judge that sentenced people Death or Exile looked alot like Dr. Crane in the 1995 Batman film, which is why I ask.
cillian okorder /
Q: Please help!
there are several kata, that was influenced by it, like niahanchin (tekki), chinto, rohai and many others
Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q: what are the effects of fiction in cranes?
Huh? Cranes like the bird or like the construction equipment?
Q: Firstly, I realize that the 1000 paper crane thing is based on faith and not science. I'm not stupid. Secondly, Do the 1000 cranes have to be in the same place? If I send one of my cranes to a friend across the country, would that no longer count as part of my 1000 cranes?If a crane gets destroyed, must I start over or replace that crane?If anyone has any knowledge or link pertaining to the 1000 paper crane myth, please post it. Thank you.
The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords