• Topkit Tower Crane Rental Building Machinery System 1
  • Topkit Tower Crane Rental Building Machinery System 2
Topkit Tower Crane Rental Building Machinery

Topkit Tower Crane Rental Building Machinery

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Topkit Tower Crane Rental Building Machinery

1) TC4808 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed. 

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Main Features of Topkit Tower Crane Rental Building Machinery

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Topkit Tower Crane Rental Building Machinery

Topkit Tower Crane Rental Building Machinery

Topkit Tower Crane Rental Building Machinery

Topkit Tower Crane Rental Building Machinery

Topkit Tower Crane Rental Building Machinery

Tower crane Specifiction

Topkit Tower Crane Rental Building Machinery

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
The okorder
Q: why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
Q: QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
Q: please help me solve.. i really don't get itttt
1 horse power = 746 watt. So the work W done by the crane in 15 s is given by W = 8*746*15 J . So the distance, S through which the crane lifted 100 kg, presumably at constant speed is given by 100*9.81*S = 8*746*15 or S = [(8*746*15)/(100*9.81)] = 91.25 m
Q: Cranes nowadays are MASSIVE! but something that has been bugging me for ages is how do they get the massive crane bit at the top down once they have finished constructing the skyscraper/building?
A okorder /
Q: a. its season of migrationb.the route it followsc.how is it guidedd.distance it travels in a yeare.reason behind migrationplz help me..ill be highly grateful!!!!
This species breeds in arctic Russia in Yakutia and western Siberia. It is a long distance migrant. The eastern population winters on the Yangtze River in China, the central population at Keoladeo National Park, India and the western population in Fereidoonkenar and Esfahan in Iran. It breeds and winters in wetlands, where it feeds on the shoots, roots and tubers of aquatic plants. This is a large white crane. Large males can exceed 140 cm (55 inches) in length and weigh over 10 kg (22 lbs). Adults are all white, except for a dark red mask extending from the bill to behind the eye. It has a yellow iris and reddish legs. The male is slightly larger than the female. Juveniles have a feathered mask and buff or cinnamon plumage. The voice is flute-like and musical. The status of this crane is critical, as it is expected to undergo a rapid population decline in the near future. The wintering site in China holding 95% of the population is threatened by hydrological changes caused by the Three Gorges Dam. Historic records from India suggest that a number of them wintered there in the past. This number has steadily declined and the birds are no longer found there. Mr. Rutledge of Entally told me that for twenty years he tried unsuccessfully to get live specimens of this crane, but did not succeed till a few years ago, when he and one of the native dealers got so many that the market was quite glutted, and many were sent to Europe. Since then the bird got scarce again, so this was evidently only a temporary invasion. —Frank Finn, Frank Finn in How to know the Indian waders. 1906 The Siberian Crane is one of the species to which the Agreement on the Conservation of African-Eurasian Migratory Waterbirds (AEWA) applies and is subject of a Memorandum of Understanding concluded under the Bonn Convention. =]
Q: inventor of junk yard electromagnetic crane?
Who Invented The Electromagnet
Q: please tell me where you found the info.
The okorder /
Q: we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q: I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords