China Tower Crane Lifting Building Machines
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 1.6-10T Rated Lifting Moment:100KN.M Max. Lifting Load: 10T
Max. Lifting Height: 200M Span: 2.5-60M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC6016(QTZ100) Certification: ISO,CE
Warranty: 1 Year Free standing height (M):50.5 Max. Working Range(M): 60
Tip Lifting Weight(T): 1.6 Working Range(M):48,54,60 Climbing speed(M/MIN): 0.5
Counterweight(T): 18.9 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:2000*2000*3000
Main Features of Tower Crane
1. TC6016(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 60m, TC6016(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable.
6. Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.
7. With scientific layout and beautiful appearance.
8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
9.After sales service will be offered which will get rid of all your worries in the purchase of our product
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Do self lifting tower cranes allow a small swing of the boom in jacking operation?
- The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
- Q: I don't understand why or how they still exist. I know I'll get some answers saying they're part of the food chain but what animal on earth would get a sufficient meal from one of these?
- crane flies are very large. They might also play a part in pollination I'm not sure. I've never looked at the gawky insects before edit larave are decomposers in soil adults don't feed. So then the maggots are for the recycling of decayed matter. Thats their point. my info came from my field guide that is next to my bed at all times
- Q: when high rise buildings are built a crane is erected to lift iron and cement up. How do they erect these cranes?
- They are erected onto themselves..
- Q: He is one of my favorite poets. I want to read more of his work.
- How about my favorite poem about Hart Crane? AT HART CRANE’S TOMB by Glenn Robert Swetman In his mind’s dark, he spoke a frivolous age where marriage of the like was spring, where vitelline worlds of virgin instinct were crushed in the obscene cleanliness of a raccoon’s paw. Did he imagine that his great sun could come trailing yellow handkerchiefs of light, like a queer comet? No, there is something out there that commands, and not worlds of perfect clipping will turn these rotund hedges into maypoles—and live. That’s why the green expands as it reaches. He must have seen this finally. His leap Into the green sea was, aesthetically, clean.
- Q: do they eat them or what??i hear about hunting them and i think cool but what do you do with them i mean do they tast good??
- Imagine a really big, really tough flying turkey with a long neck and big head making the sound of a 18 wheeler air horn. I'm not much of a birder or shotgunner, but the guys here use all the things you would if you imagined a combined duck hunt and woodland turkey hunt. Camo everything and the biggest turkey loads you can chamber. In Texas steel only! They call them the prime rib of the skies, although I prefer duck still. If they are endangered on the east coast come out west, we have plenty of them. People crash their cars if they come down near a highway and start landing through windsheilds.
- Q: Where are levers used in and throughout the crane
- No. A lever requires a fulcrum and a boom has none. As ststed the levers are used to operate the hoisting mechanism.
- Q: explain thoroughly please
- Sure. Let's say that a crane needs to hoist a load of 10 tons, and that because it needs to reach over some obstacles, needs to lift at a horizontal distance of 50 feet away. That creates a torque about the base of the crane of 500 ton·ft. By positioning a counterweight on the opposite side of the tower, the magnitude of the moment can be mitigated. For instance, let's say a counterweight of 10 tons is positioned at 25 ft on the other side of the tower. The moment produced by the counterweight is 250 ton·ft, so the net moment at the base is 250 ton·ft. Furthermore, when the 10 ton load is positioned and release, there is still a 250 ton·ft moment at the base of the tower; it has simply switched direction (say from rotating the crane to the right, to rotating it to the left). If you find this helpful, please award Best Answer!
- Q: I am kinda really sick of paper cranes, and I was wondering if there's any good method of making paper birds that look, well, like birds. I checked out the one website with instructions, but, well, look at it. I tried it.
- I haven't made the other birds on this site but they have a pelican and an owl. I think the pelican looks a bit crane-ish but it may look different in reality. Have fun!
- Q: when do i start bernie cranes missions gta 4?
- You like the gay guy huh? Keep playing.
- Q: A 3000-lb wrecking ball hangs from a 40-ft cable of density 10 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 40 ft in the air by drawing in the cable.
- The total work done by the crane equals the potential energy gained by the wrecking ball and the cable; the potential energy gained is W = V_final = Mg L + ρ L g L/2 which is the final potential energy of the wrecking ball and the cable added together. In the case of the cable, you take the center of mass of it which is located right at the center (L/2). The result is then W = 3000*32*40 + 10 * 40 * 32 * 40 / 2 = 4096000 ft-lbf = (4096000)*(0.001285067) BTU = 5263.63 BTU
Send your message to us
China Tower Crane Lifting Building Machines
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords