• TC6014 8T Tower Crane Equipment with CE ISO Certificate System 1
  • TC6014 8T Tower Crane Equipment with CE ISO Certificate System 2
TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1, TC6014 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 62m, TC6014tower cranes are famous for their large operating ranges, varied working methods and wide uses.

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

Tower crane Specifiction

TC6014 8T Tower Crane Equipment with CE ISO Certificate

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

About CNBM

 

CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q: MP: Do you do any origami?MP: How bored are you at the moment?MP: What do you think of this She Wolf song by Shakira?I can't really form an opinion on it.
How can I make a paper crane come to life and fly me away to another world? Wish on a paper mache star? MP: Do you do any origami? Randomly yes I do. MP: How bored are you at the moment? Mmmm, I'm a work so yes. MP: What do you think of this She Wolf song by Shakira? I first heard it while viewing the video. I think I probably looked like a deer caught in the headlights. Conundrum.
Q: Exactlly what type of bird is a crane?
A wading bird Of the family, Gruidae
Q: Will Denny Crane lose his first case on an upcoming episode of Boston Legal?
Denny Crane lose a case? Are you crazy? Denny Crane might lose a few more memory brain cells, but never a case. Then he wouldn't be Denny Crane. Denny Crane!
Q: why do siberian crane migrate in india?
The Siberian Cranes nest in western Siberia . During Winter season in Siberia , they migrate to India which is their wintering ground.The migration route stretches for 4000 miles. Their resting place at the time of migration is the Lake Ab-i-Estada in Afghanistan. The Kaladeo Ghana National Park or the Bharatpur National Park has been declared a world heritage site because the Siberian Crane traverses nearly half of the globe to reach it. The Siberian Crane is presently an endangered species. Larger numbers of birds have been hunted down over the years especially when they undertake the perilous journeys across the Himalayas to reach the wet land. They are shot down in Pakistan to be gifted to friends and relatives. This has led to a severe decline in the number of Siberian Cranes in the world. The immediate need of the hour is to provide safety to the Siberian cranes along their migration route. This popular visitor has not been seen in the last two years in India. The last pair of Siberian Cranes which had made the Bharatpur Bird Sanctuary their seasonal home in the year 2002 was not seen in the year 2003. Their absence is indeed painful and one of the aims of the Crane foundation is to bring back the Siberian Crane to India.
Q: how do they get the construction crane onto the the tall buildings?
If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
Q: I give up...Somebody who understands The Decemberists please tell me what a Crane's Wife is and what the song is about. I love the song, I sing along loudly, but I don't have a clue.
I found this on wikipedia. The Crane Wife is an old Japanese tale. While there are many variations of the tale, a common version is that a poor man finds an injured crane on his doorstep (or outside with an arrow in it), takes it in and nurses it back to health. After he releases the crane, a woman appears at his doorstep with whom he falls in love and marries. Because they need money, his wife offers to weave wondrous clothes out of silk that they can sell at the market, but only if he agrees never to watch her making them. They begin to sell them and live a comfortable life, but he soon makes her weave them more and more. Oblivious to his wife's diminishing health, his greed increases. He eventually peeks in to see what she is doing to make the silk she weaves so desirable. He is shocked to discover that at the loom is a crane plucking feathers from her own body and weaving them into the loom. The crane, seeing him, flies away and never returns.
Q: They're so big
large cranes are build at the factory and torn down and put together the first time, then after that the can be move in larger sections than when it came from the factory.
Q: Are there any standard requirements? If so, please show me some reference materials. Thank you, 20It's urgent, online, etc.. Thank youWould you please not write down the specifications? The specific methods of operation, with what materials are written on, thank you, good, you can add points
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,
Q: How many meters of cranes should be in accordance with the anemometer?
The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q: I am writing a story for school about working in Dubai as a crane driver but I need to know what the purpose of a Crane driver is, how much they get payed and stuff like that. And if you could tell me how a crane driver can get admission in the first place, it would be really great. Thanx. And btw, this story is for Geography.Thank you. :)
i am not a crane driver myself , but into this field of construction . get a licence as driver from authority just as a car driver. know how to drive the crane ad a driver know how to operate a crane as a operator. know the performance of the crane and its limits. the salary can vary depending on the type of crane and its special features. but not in the high end grade for sure unless its a very specialised crane operation. u can ask any thing more .

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords