• TC5516 8T Tower Crane for Sale with CE ISO Certificate System 1
  • TC5516 8T Tower Crane for Sale with CE ISO Certificate System 2
  • TC5516 8T Tower Crane for Sale with CE ISO Certificate System 3
  • TC5516 8T Tower Crane for Sale with CE ISO Certificate System 4
  • TC5516 8T Tower Crane for Sale with CE ISO Certificate System 5
  • TC5516 8T Tower Crane for Sale with CE ISO Certificate System 6
TC5516 8T Tower Crane for Sale with CE ISO Certificate

TC5516 8T Tower Crane for Sale with CE ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our TC5516 8T Tower Crane for Sale with CE ISO Certificate


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC5516 8T Tower Crane for Sale with CE ISO Certificate


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC5516 8T Tower Crane for Sale with CE ISO Certificate

 

Independent height (m)

44

Max height with attachment (m)

150

Working range can be adjusted(m) 

45/50/55

Min working range(m) 

2.5

Max lifting capacity(t)

8

Tip load @ 48m(t)

1.6

Hoist mechanism

Falls

2

4

Lifting capacity(t)

0-2

-

0-4

0-4

-

0-8

Speed(m/min)

0-80

-

0-40

0-40

-

0-20

Motor

YZRWFc225M-4/8 -30/30KW     

Trolleying mechanism

Speed(m/min)

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YZR132M2-6-3.7KW X2

Climbing speed(m/min)

0.5

Counterweight(t)

17.6

Mast section size(L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

42

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 



TC5516 8T Tower Crane for Sale with CE ISO CertificateTC5516 8T Tower Crane for Sale with CE ISO CertificateTC5516 8T Tower Crane for Sale with CE ISO CertificateTC5516 8T Tower Crane for Sale with CE ISO CertificateTC5516 8T Tower Crane for Sale with CE ISO Certificate


TC5516 8T Tower Crane for Sale with CE ISO Certificate

FAQ TC5516 8T Tower Crane for Sale with CE ISO Certificate

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:I got the Fly crane TODAY and I never even flew it, but I charged it up and it wont fly. The blades spin for 5 seconds, and then stops.
Good okorder , Funtastic Customer Service Team
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:What are the special operators of tower cranes?
Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
Q:Is the crane a metaphor for the woman? Or does it transform into one? OR does the guy marry a bird? I've been listening to this all week and cannot discern which is right...maybe that was Colin's intention? A little help here?
It's a story about a peasant living in, I assume, rural Japan, it being a Japanese folk tale. He finds a wounded crane on the road as he's walking one night. It has an arrow in its wing, and he pulls out the arrow and revives the crane. A couple of days later this mysterious woman shows up at his door and he brings her in. Eventually, they fall in love and are married. Although they're poor-- she's a seamstress, a weaver-- she suggests that she can make this cloth that he could sell and make money. But the one condition is that when she's weaving he can't look into the room at her weaving. This goes on for awhile, until eventually the peasant's curiosity gets the best of him and he looks in. It turns out that the woman is a crane, and she's pulling feathers from her wings and putting them into the cloth, which is what makes it so beautiful and soft. Apparently, having looked in at her breaks the spell and she turns permanently back into a crane and flies away.
Q:i need the story cranes by hwang sun won and translated by peter h. lee and i cant find it on google. help i need the story for my essay
EEK! I just did a search under Hwang Sun Won. It appears that Cranes is a series of short stories. Is that what you meant? If it is one particular short story called Cranes, I can't find it. I would suggest you go to your teacher/professor and ask where to obtain a copy. If you can't ask your teacher, run, do not walk! to your nearest library and throw yourself on the mercy of the librarians! Another search option for you is to look for books by Peter H. Lee, specifically the ones he has edited. He has written several anthologies. Good luck!
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
Q:when a skyscraper is done being built, how does the crane come down?
Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
Q:I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords