• TC5613 8T Dubai Tower Crane with CE ISO Certificate System 1
  • TC5613 8T Dubai Tower Crane with CE ISO Certificate System 2
  • TC5613 8T Dubai Tower Crane with CE ISO Certificate System 3
  • TC5613 8T Dubai Tower Crane with CE ISO Certificate System 4
  • TC5613 8T Dubai Tower Crane with CE ISO Certificate System 5
TC5613 8T Dubai Tower Crane with CE ISO Certificate

TC5613 8T Dubai Tower Crane with CE ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our TC5613 8T Dubai Tower Crane with CE ISO Certificate


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC5613 8T Dubai Tower Crane with CE ISO Certificate


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC5613 8T Dubai Tower Crane with CE ISO Certificate

Independent height (m)

46

Max height with attachment (m)

150

Working range can be adjusted(m) 

44/50/56

Min working range(m) 

2.5

Max lifting capacity(t)

8

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

0-2

-

0-4

0-4

-

0-8

Speed(m/min)

0-80

-

0-40

0-40

-

0-20

Motor

YZRWFc225M-4/8 -30/30KW     

Trolleying mechanism

Speed(m/min)

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YZR132M2-6-3.7KW X2

Climbing speed(m/min)

0.5

Counterweight(t)

14.1

Mast section size(L×W×H)m

1.8×1.8×2.5m

Working temperature

-40-+60°C

Total power (KW)

42

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 

TC5613 8T Dubai Tower Crane with CE ISO CertificateTC5613 8T Dubai Tower Crane with CE ISO CertificateTC5613 8T Dubai Tower Crane with CE ISO CertificateTC5613 8T Dubai Tower Crane with CE ISO CertificateTC5613 8T Dubai Tower Crane with CE ISO Certificate


TC5613 8T Dubai Tower Crane with CE ISO Certificate

FAQ TC5613 8T Dubai Tower Crane with CE ISO Certificate

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q: How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
This is only the tower crane in different periods of different naming:QTZ---- is the general saying in 80s of last century, Q means steel material (usually Q235), T is tower crane (mostly tower top type), Z indicates heightening method is self lifting,PT------ is the naming method in recent years.
Q: Has anyone ever folded 1000 paper cranes? If so did your wish come true? If it did come true what did you wish for? :) Thanks so much!
I know of someone who did. They did it as a fundraiser for a village school. They folded the cranes while working on the project, though, so I guess the lesson there is that you can make your own luck. The cranes look beautiful, though!
Q: What prior education and skills are needed to become a Crane operator ?
A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
Q: Or would it be better to custom order for my applications?
Crane was good before they went out of biz. Howards Lunati Crower Reed cams was great before going out of biz. Comp does alot of custom grinds but I never been a big fan of comp. Core Hardness probs in past
Q: I remember it was either an anime/manga or a movie but a boy or girl makes a thousand paper cranes for someone who is dying (possible their mother). I'm pretty sure it's an anime. It's not the story about the little girl with leukemia, I know that. I also remember the little girl/boy putting them on the edge of the bed or something? It's not much to go by but if you can help me I would be eternally grateful.
Sadako and the 1000 paper cranes by Eleanor Coerr; the anime theatrical.
Q: Can anyone give me a summary of The Veteran by Stephen Crane?
I okorder /
Q: Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
Q: Who was the guy called the Headless Horseman in the story of Ichabod Crane?
In the Washington Irving version of the story (which may be the original, I don't know if he based it on an earlier story or not), the Horseman is the ghost of a Hessian mercenary who fought died during the American Revolutionary War (if you don't know about this, Hessians were German mercenaries that were hired by the British). However, in this story, the guy never is given a name. He might be given a name in other versions of the story, but I am only really familiar with the Washington Irving version the various movies based on that story.
Q: I have preliminary data: up to 2 tons of weight; work range of 40 meters; lifting torque 800KNm; lifting height 45m.. I encountered problems in the design, and some of its specific reference, I would like to ask here, for example, how much is the weight of its whole machine, how much is the balance weight, the balance of the radius of gyration? Super boom weight? (it's better to have the approximate weight of each component). And when I design this tower crane, is it necessary to use planetary gear for the gear reducer?Thanks to your advice, Liu is here to thank you
You're welcomeDesign units are different.Our factory is Langfang Design Institute drawings. May refer to the following.Arms 55 meters long.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords