TC5516 8T Self-raising Tower Crane with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our TC5516 8T Self-raising Tower Crane with CE ISO Certificate
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our TC5516 8T Self-raising Tower Crane with CE ISO Certificate
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our TC5516 8T Self-raising Tower Crane with CE ISO Certificate
Independent height (m) | 44 | ||||||
Max height with attachment (m) | 150 | ||||||
Working range can be adjusted(m) | 45/50/55 | ||||||
Min working range(m) | 2.5 | ||||||
Max lifting capacity(t) | 8 | ||||||
Tip load @ 48m(t) | 1.6 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 0-2 | - | 0-4 | 0-4 | - | 0-8 | |
Speed(m/min) | 0-80 | - | 0-40 | 0-40 | - | 0-20 | |
Motor | YZRWFc225M-4/8 -30/30KW | ||||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||||
Motor | YZTDE132L-4/8/16-3.3/2.2/1.1KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YZR132M2-6-3.7KW X2 | ||||||
Climbing speed(m/min) | 0.5 | ||||||
Counterweight(t) | 17.6 | ||||||
Mast section size(L×W×H)m | 1.6×1.6×2.5m | ||||||
Working temperature | -40-+60°C | ||||||
Total power (KW) | 42 | ||||||
Power supply requirement (KVA) | 180KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||||
Startup voltage & current | 380V×95%=361V 179A | ||||||
Rated working voltage & current | 380V 128A
|
FAQ TC5516 8T Self-raising Tower Crane with CE ISO Certificate
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: I wanted the email address for the cartoonist Pickles by Brian Crane to find that golfing humor comic strip that ran in the newspapers. Maybe this would help. How many strokes do you think? Two - one big drive and a short putt. Now killed the golf ball. Then said Now one heck of a putt! I am still trying to find that comic strip but anyone has the email address, please let me know asap. Thanks!
- Try comics and animation.
- Q: Do you believe in the 1000 folded paper cranes give you a wish?What is the entire process in it all?And can they be in another persons hand like if I make 1000 an a few are at my friends possession will it work?
- I believe it too. You just make 1000 paper cranes, and I think that only the victim of the disease is supposed to make it. Oh yea, and you hang the cranes around the victim. This is kind of irrelevant, but once i read a book Sadako and the Thousand Paper Cranes. It's about a girl who tries to make 1000 paper cranes in order to get cured. It's really sad, but that's where I'm getting my info from.
- Q: Better actor......Bob Crane or Alan Alda?
- Bob Crane!!! That sex crazed loon was much better than Alda.
- Q: How to build a tower crane?
- 4, combination and installation with the boom, hung with arm pull rod.5, the assembly and installation of crane. This boom just installed in the rotary device, the other end is able to lift and hang rod, in accordance with the installation instructions.The power supply auxiliary hoist with 6, switch on the tower cap following installation, the installation of counterweight boom hoist with the.
- Q: Who do you think was better and who would've won if they faced.
- willie with out a doubt
- Q: the highest ranking American serviceman, at least in the so called prison camp
- no, he was brutally murdered
- Q: Is there a certain direction and reason a construction worker will leave a crane facing a certain direction.
- They would generally try to point the boom (the longer part of the crane) away from the prevailing winds. This reduces stress on the tower - but it's not really a big deal.
- Q: I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
- But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
- Q: I'm trying to workout the best height of a truss for a ship-to-shore container crane project. The crane will have a 65m outreach, 18m center section and 15m backreach. I was thinking in the region of 2m-3m truss height.Any input would be great.Thanks
- Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.
- Q: We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
- Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
Send your message to us
TC5516 8T Self-raising Tower Crane with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords