• TC5613 8T Rail Tower Crane in India with CE ISO Certificate System 1
  • TC5613 8T Rail Tower Crane in India with CE ISO Certificate System 2
  • TC5613 8T Rail Tower Crane in India with CE ISO Certificate System 3
  • TC5613 8T Rail Tower Crane in India with CE ISO Certificate System 4
  • TC5613 8T Rail Tower Crane in India with CE ISO Certificate System 5
  • TC5613 8T Rail Tower Crane in India with CE ISO Certificate System 6
TC5613 8T Rail Tower Crane in India with CE ISO Certificate

TC5613 8T Rail Tower Crane in India with CE ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate

Independent height (m)

46

Max height with attachment (m)

150

Working range can be adjusted(m) 

44/50/56

Min working range(m) 

2.5

Max lifting capacity(t)

8

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

0-2

-

0-4

0-4

-

0-8

Speed(m/min)

0-80

-

0-40

0-40

-

0-20

Motor

YZRWFc225M-4/8 -30/30KW     

Trolleying mechanism

Speed(m/min)

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YZR132M2-6-3.7KW X2

Climbing speed(m/min)

0.5

Counterweight(t)

14.1

Mast section size(L×W×H)m

1.8×1.8×2.5m

Working temperature

-40-+60°C

Total power (KW)

42

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 


TC5613 8T Rail Tower Crane in India with CE ISO CertificateTC5613 8T Rail Tower Crane in India with CE ISO CertificateTC5613 8T Rail Tower Crane in India with CE ISO CertificateTC5613 8T Rail Tower Crane in India with CE ISO Certificate

TC5613 8T Rail Tower Crane in India with CE ISO Certificate


TC5613 8T Rail Tower Crane in India with CE ISO Certificate

FAQ TC5613 8T Rail Tower Crane in India with CE ISO Certificate

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:Were the anti-gravity machines used to build the pyramids levers, winches and cranes?
Levers winches and cranes all use a counter balance. Its weight that helps move weight in different ways. There is no such thing as an anti-gravity machine.
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
The tower crane service, QTZ40 state (including 40) the following ten years, more than QTZ63, the age of fifteen years, the construction elevator used for ten years; but specific to various provinces and cities are different, such as Jiangsu Province, the 40 tower crane can be used 8-10 years, QTZ63 tower crane used for 15 years, 8 years of construction hoist. Of course, we should not blindly look at the provisions, tower cranes and the use of strength sometimes determines the life of it!
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:I'm 17 and I was planning on reading it for class, do you think it will be easy to read?
Stephen Crane, Maggie is fantastic! I read it in school when I was 14 so I have no doubt you will have no problems in reading it. Maggie is the tale of an inevitable fall from grace on the part of a young, innocent girl trapped in the vicious world of New York City's slums. Yearning for acceptance and love, beaten at home by alcoholic parents, Maggie sets out with Pete, a local bartender whose cultured mannerisms elicit great respect from the impressionable young girl. However, when Pete spurns her for another, Maggie is ejected out onto the street, forced into prostitution to make a living. We last see her moving off, a huge, oily fat man in tow, for a darkened corner in the city's seedy underworld. If Upton Sinclair's The Jungle is a torrent of social anger and protest, Crane's Maggie is like a brilliant lightning strike, flashing across our vision and leaving us temporarily blinded. The book--scarcely 70 pages--is succint, brutish, and merciless. Crane allows his readers to form their own opinions regarding the characters. His innovative use of near-phonetic spelling to depict in the reader's ear the local dialect of New York's rough neighborhoods was shocking and difficult to comprehend when the book was first released. It lends Maggie an air of earthy legitimacy. Ultimately, Maggie is a cry for the plight of poor children--the souls we overlook with a callous unease mirrored in Pete's offhand, uncaring rejection of young Maggie's genuine love and affection. It is, without qualification, Stephen Crane's greatest and most moving achievement.
Q:any one can give me address for forged hook for crane?
here okorder /
Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
See the ability of individuals, the first ticket 650 yuan graduation card ID card (copy) medical certificate according to 3 inch 3 days learning theory exam two days of practice examination through 15 days notice thank you hope to adopt licensing
Q:A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
3 no or no inspection items are completed". In the absence of such or part of the sub - item, it shall be drawn on its serial number".
Q:I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
Q:for example: erection, technical data...
A bridge crane is one that looks like a bridge (sorry I am tired). It sits on two railway tracks. One at either side of say a building. The tracks are at a fair height. The crane bridge spans between the tracks. Long travel is when the crane moves along the tracks. Cross travel is when the 'crab' moves sideways along the bridge. The crab has the hoist on it with a drum and cable type arrangenment. The lifting gear or hook is attached to the cable. They are very useful in factories for transporting large parts from one process to another. They transport pretty well anywhere in a well designed building in that Long Travel can be X cross travel can be Y and hoist up and down can be Z.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords