TC5613 8T Rail Tower Crane in India with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate
Independent height (m) | 46 | ||||||
Max height with attachment (m) | 150 | ||||||
Working range can be adjusted(m) | 44/50/56 | ||||||
Min working range(m) | 2.5 | ||||||
Max lifting capacity(t) | 8 | ||||||
Tip load @ 48m(t) | 1.3 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 0-2 | - | 0-4 | 0-4 | - | 0-8 | |
Speed(m/min) | 0-80 | - | 0-40 | 0-40 | - | 0-20 | |
Motor | YZRWFc225M-4/8 -30/30KW | ||||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||||
Motor | YZTDE132L-4/8/16-3.3/2.2/1.1KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YZR132M2-6-3.7KW X2 | ||||||
Climbing speed(m/min) | 0.5 | ||||||
Counterweight(t) | 14.1 | ||||||
Mast section size(L×W×H)m | 1.8×1.8×2.5m | ||||||
Working temperature | -40-+60°C | ||||||
Total power (KW) | 42 | ||||||
Power supply requirement (KVA) | 180KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||||
Startup voltage & current | 380V×95%=361V 179A | ||||||
Rated working voltage & current | 380V 128A
|
FAQ TC5613 8T Rail Tower Crane in India with CE ISO Certificate
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: Tower crane driver simulation exam which website?
- This also needs to imitate exam? When you go to the training, the teacher will read the outline.
- Q: If a crane fly loses a leg will he be okay? Is it painful for him or do they just 'release' them like a lizard can release it's tail?
- Chances are, it won't be O.K. Some spiders can release their legs, but only if given fair warning (a gentle tug). If the crane fly lost his leg violently, he will probably die from the injury. Whether or not the injury kills him, he will, of course, be more vulnerable to predators. Not to be morbid or cold, because I really do love animals, and hate to see harm come even to the under appreciated invertebrates, but the Crane fly usually only lives a couple of days, so as long as he mated, his job on earth was finished anyway.
- Q: Just wondering i am so confused
- It's a crane thing. Seriously though - overhead crane, gantry or polar crane!
- Q: Wall mounted tower crane
- The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions to.
- Q: I just can't figure this out. They need a crane to assemble tall buildings, but how do they assemble the crane? Especially if the building is over 20 stories high. What crane can build a crane higher than itself?
- a mobile crane sets the original lower sections in place, and then the crane is assembled in 6' sections as it climbs itself.
- Q: I read the book and thought of a theory... I think that the headless horseman is just and alter ego Brom Bones alter ego and he wanted to kill Brom Bones for his beloved Katrina Van Tassel... I want to hear your opinions and theories possibly involving what you think Katrina said to Ichabod during the party. That would be nice thank you.
- For the best answers, search on this site Seeing as there are no other answers so far, I thought I'd write what I know :) I've never read the legend and the film may have a different ending, but in the film Ichabod returns to New York. x
- Q: Which Kung Fu influenced Shotokan, Shito-ryu and Shorin-ryu?
- hmmmm
- Q: What is the maximum weight an industrial crane can lift?
- It depends on the definition of an industrial crane and the installation. It is possible to lift hundreds of tonnes but standard industrial cranes on I beams usually limited to 15-25 tonnes for cost and building requirements.
- Q: we have a project starting that will require a stack built 1km high in the air?How will they install this?
- Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
- Q: I am writing a story for school about working in Dubai as a crane driver but I need to know what the purpose of a Crane driver is, how much they get payed and stuff like that. And if you could tell me how a crane driver can get admission in the first place, it would be really great. Thanx. And btw, this story is for Geography.Thank you. :)
- i am not a crane driver myself , but into this field of construction . get a licence as driver from authority just as a car driver. know how to drive the crane ad a driver know how to operate a crane as a operator. know the performance of the crane and its limits. the salary can vary depending on the type of crane and its special features. but not in the high end grade for sure unless its a very specialised crane operation. u can ask any thing more .
Send your message to us
TC5613 8T Rail Tower Crane in India with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords