• 8T Tower Crane In India with CE ISO Certificate System 1
  • 8T Tower Crane In India with CE ISO Certificate System 2
8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of 8T Tower Crane In India with CE ISO Certificate

1,The tower crane is advanced in parameters,

2,reliable in performances,

3,beautiful in appearance,

4,high in quality,

5,simple in structure and easy in operation.

6,It is equipped with advanced safety devices and is easy for repair and maintenance, safe for use and reasonable in pricing, for which it has become an ideal choice for many construction enterprises.

Main Features of 8T Tower Crane In India with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

Tower crane Specifiction 8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

FAQ of 8T Tower Crane In India with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q:What is the difference between crawler crane and tower crane?
Tower cranes are generally used in high-rise building construction. They are self elevating and attached. The boom is very long and the construction site is very common. Multi story buildings can be replaced by automobile cranes.Crawler cranes are used in municipal engineering, such as subways, bridges and so on. Lifting weights can be moved.It's very easy to tell from the outside, so you can search for some pictures.
Q:or is jason mraz just making up things for lyrics?
Plenty of cranes are built on the shop floor and lifted in place....so no it doesn't take a crane to build a crane. There are cranes that need another crane and that is the the ones used in the center of new skyscrapers where they build a hoist on top of the building to add to the length of the main crane. So maybe that is the kind he is talking about
Q:I know that an ancient Japanese legend promises that anyone who folds a thousand origami cranes will be granted a wish by a crane, such as long life or recovery from illness or injury. This summation, or something like it comes up in every search I do for the legend. Is there a full story that goes with the original legend? If so I would very much like to read it. Wikipedia doesn't have it. Also, while Sadako's story is very touching, it is not the one I'm looking for.
Well, I read that cranes are symbolic because they are thought as legendary creatures who can live to 1000 years. They apparently have a lot of faith, for they mate only once in that time, and patience. So, that's why it's said that if one can fold 1,000 cranes, 1 crane for 1 year a crane lives, then they will be granted a wish, because they have shown great perseverance and faith in order to stay till the end to fold a thousand cranes. Not sure if this is what you're looking for, but I saw this online while searching up the symbolism of origami cranes. And I know that I am late by 6 years.
Q:Just curious... I'm not in construction and always wondered...
The top sections of the mast beneath the crane are removed one at a time and lowered to the ground. The top section of the crane has hydraulic rams that lower it down one mast section at a time. It is hard to describe without a diagram or photos. See photos at attached link. In some design, the jacking portion is at ground level. The crane jacks itself up so a 20' section of the mast can be unbolted and slide out. Then the jack is lowered so the process can be repeated. See second link for photos and a more detailed explanation.
Q:What are the common problems encountered in hiring cranes for house constructions?
It might not be the right size for the job.
Q:How do cranes use geometry?
If your referring to cranes in construction cranes, then it might form a right triangle with the ground implying the use of trigonometry which is a part of geometry.
Q:My dad has some old tools and he is wondering if the company is still around, or what happened to it. A yahoo search revealed little.
Hot jobs- fashion Champions- A Extraordinary- B Hot Music- 1995 Villian-A Famous First- A Spiral Frog- e
Q:I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
Large okorder .
Q:type of dc motors used by electric train/subway,crane & fan.give a brief explanation to your answer?
I believe that electric trains and subways use series motors when DC motors are used because the series motor has a torque vs. speed curve that provides high torque at low speed and low torque at high speed. Since power is equal to torque times speed, that is essentially a constant power mode of operation. I believe that mode is selected because it results in a smaller and less expensive complement of power delivery equipment and more efficient operation. Although it has been many years since DC motors were used extensively for cranes, I believe that series motors were used more than other types for the same reasons stated above. However, compound or separately excited motors may have been used for better speed and torque control at low speeds. Except for heater fans in vehicles, I don't believe DC motors have ever been used much for fans. Today, permanent magnet DC motors are used for all of the little motors in vehicles including the radiator fan that was formerly belt driven by the engine. A permanent magnet motor is like a separately excited motor or a shunt motor. The optimum DC motor for a fan would probably be a shunt motor because a fan requires increasing torque as speed increases. Today, computers are cooled by brushless DC motors.
Q:Is the pink paper crane used to represent Lulu?
well i have NO IDEA of what ur talking about lol im just stopping by to thank you for making my life EVEN MORE PATHETIC! lol when u mentioned that u joined runescape i did too... and LITERALLY spent my WHOLE Saturday playing! hahaha its addictive as hell!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords