Steel Frame Formwork GK120 with Reasonable Prices for High-rise Buildings
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Steel Frame Formwork GK120
There is a prizing part designed in the corner, which can help to position and remove formwork easily.
The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.
The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.
2. Main Features of Steel Frame Formwork GK120
Light weight
High strength
High standardized system
Easy connection with adjustable steel clamp
Convenient and fast corner formwork
Flexible to assemble and application
3. Steel Frame Formwork GK120 Images
4. Steel Frame Formwork GK120 Specification
-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.
-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.
-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.
-The adjustable steel clamp is convenient to use, and can hold tightly.
-There is a prizing part designed in the corner, which can help to position and remove formwork easily.
-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.
-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.
5. FAQ of Steel Frame Formwork GK120
1) What can we do for you?
.We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
- Q:What are the requirements for fastener type scaffolding? How to calculate
- 5, the safety net to the floor construction progress by layer by layer. ?6, high scaffolding must have lightning protection facilities.
- Q:Hester Prynn stands on a scaffold
- In medical college they had to take notes rather at once. commencing off to be a doctor isn't that straightforward now, the fee of their writing messep up their handwriting and that they do now no longer care approximately it after commencing off to be a doctor.
- Q:I want to talk my mum into it.She might let me because it fits my school's regulations (two piercings/earrings per ear) but she might not because the holes are permanentI was wondering if the holes you get are a certain size, they might close up if you don't wear the earring for a while?And also, I'd like to know some health risks associated to getting one.Thanks.
- I don't know what a scaffold piecing is but if it is the regular earing needle size whole the holes aren't permant if you don't wear the earrings the holes with close up. And no it is just your ear!
- Q:I mean, anybody knows when will they finish the exterior restoration?
- My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
- Q:What is scaffolding pole, bar, scissors support?
- 2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1 by the contact surface friction force transmission, that is, at the junction of the contact surface of the pressure after the friction force to support the transverse load and transfer it to the vertical pole, such as the role of the fastener, through the positive pressure of the bolt to produce friction;2 by the welding force transmission. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission force. This method is more common in the horizontal bar on the top of the scaffolding;4. The shear force of the dowel bar is connected with the vertical connection plate of the cross bar and the hole of the vertical rod to realize the connection and the shear force between the two sides of the pin rod
- Q:What are the hidden dangers of scaffolding
- 1, scaffolding collapse hidden problems.2, security enclosure is not in place.
- Q:how would you apply scaffolding into an example in history/geograpy
- The US and other countries helping Haiti is an example of scaffolding which implies nations helping each other./
- Q:Steel pipe scaffolding scaffolding which components? Double row scaffolding and row spacing, step length, spacing and wall fixed spacing is generally much
- 2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q:It's like they just disappeared
- not sure but i know Dawn Marie was pregnant when she got released and thats the reason why and now she cant ggo back to wwe cus they have a hard schedule and she has 1 or 2 little kids
- Q:What is scaffolding in ESL?
- A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Frame Formwork GK120 with Reasonable Prices for High-rise Buildings
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords