Steel Frame Formwork GK120 with Reasonable Prices for Large Projects
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 300 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Steel Frame Formwork GK120
There is a prizing part designed in the corner, which can help to position and remove formwork easily.
The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.
The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.
2. Main Features of Steel Frame Formwork GK120
- High standardized system
Easy connection with adjustable steel clamp
Convenient and fast corner formwork
Flexible to assemble and application
3. Steel Frame Formwork GK120 Images
4. Steel Frame Formwork GK120 Specification
-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.
-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.
-There is a prizing part designed in the corner, which can help to position and remove formwork easily.
-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.
-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.
5. FAQ of Steel Frame Formwork GK120
1) What can we do for you?
.We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Steel Frame Formwork GK120 cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS,
etc.by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7
days.
- Q:truss or frame (?) which is preferred between the two in making scaffoldings and why?
- Trusses are the diagonal supports in a structure. Frames is just straight vertical supports. Scaffolding applies both. You have frames on the corners and ends and trusses that are the diagonals that cross to add support.
- Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
- Longitudinal sweeping rod: a sweeping rod along the longitudinal direction of the scaffold;Horizontal sweeping rod: a sweeping rod arranged along the side of the scaffold;
- Q:what should i do?? i've been washing it and leaving it to heal but im worried about it. i've had the piercing for 9 days now and i only noticed this yesterday. any ideas?
- that means that was piercing wasn't done as well as it could have been. there is nothing you can do about it except take it out, let it heal, and have it re-pierced. go see your piercer. they should be able to tell you if it's a problem, and they should re-pierce it for free.
- Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
- Technical code for safety of steel tubular scaffold with couplers in JGJ130-2011 constructionJGJ128-2010 technical code for safety of steel tubular scaffold for building constructionTechnical code for safety of JGJ202-2010 construction scaffolding
- Q:I got my industrial pierced on august 17th of this year. About 2 weeks ago this little bump formed on the outside of the bottom hole...i was wondering if i took it out to get it cleaned really good since its kinda hard to fully clean it would that affect it in any negative way? Its only been a month so im a little apprehensive about taking it out but it would only be for a couple minutes...please help!!!!!!!!!!
- the bump on the out side is only because when the needle went thru it was pusshing cartlidge or bone out. kindaof bending it. aventually. after a acouple mounth the bump will settle down and go away, just clean the hole twice a day and keep ur hand and hair off of it so that it can heal as quickly as possible without infection =) hope that helps
- Q:Steel tube scaffolding construction labor time? Whether the demolition of construction
- And can be roughly divided as follows: 2.1 according to the material of the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q:what is differences between scaffold and scaffolding?
- Scaffold is what scaffolding is constructed of.
- Q:Hi people, just wondering if the main Angkor Wat temple is still under restoration/renovation with all that green tarpaulin and scaffolding on it?I'm wondering when that will be off as it might obstruct the amazing views.Is there any restoration schedules?thanks!!
- Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
- Q:Steel pipe scaffolding scaffolding which components? Double row scaffolding and row spacing, step length, spacing and wall fixed spacing is generally much
- Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
- Q:Bowl buckle scaffold construction needs to pay attention to what problems
- Arrange training for the erection of timberman. ?Set up, when the demolition of the establishment of warning signs, assigned to monitor. ?Erection is completed, after acceptance of the listing.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Frame Formwork GK120 with Reasonable Prices for Large Projects
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 300 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords