• Steel Frame Formwork GK120 with Reasonable Prices for Large Projects System 1
  • Steel Frame Formwork GK120 with Reasonable Prices for Large Projects System 2
Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system
  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

 

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

 

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.  

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, 

     etc.by air/ sea, and we are VIP of these express.  

   .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7

    days.   

Q: What is the significance of the scaffold in the novel 'The Scarlet Letter' (Hawthorne)?
It has dramatic importance because key events happen there. Further, at the scaffold is where much hypocrisy gets played out. From Shmoop
Q: Explain the principles of scaffolding?
Scaffolding is a temporary platform constructed for reaching heights above arms in building construction, maintenance, or repair. It is usually made of metal or aluminium and can range from simple to complex in design, depending on its use and purposes. Principles of Scaffolding : 1. Reducing the number of tasks required to solve a problem. 2. Maintaining the pursuit of the goal. 3. Controlling the risk in problem solving. 4. Ensure the safety of users.
Q: I have a cartilage piercing on my right ear and now I want scaffolding. Can they just pierce the other side of my ear (opposite my other cartilage piercing) and put a scaffold bar through my existing cartilage piercing hole and the new piercing hole opposite? Can I then get another cartilage piercing straight underneath the scaffolding? How much does it hurt? Thanks in advance :)
an industrial piercing is much different than a helix. a helix is normally pieced from the from to the back of the ear while a helix is pierced from the outside to the inside of the ear. without a picture or seeing it it's hard to say so go to your local professional. piercings don't tickle. the pain shouldn't be a concern.
Q: Hi people, just wondering if the main Angkor Wat temple is still under restoration/renovation with all that green tarpaulin and scaffolding on it?I'm wondering when that will be off as it might obstruct the amazing views.Is there any restoration schedules?thanks!!
Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
Q: A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint to one side, as shown.
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q: I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
When the axial force and bending moment of the corresponding substitution effect of general practical design expression in S, can be calculated using the design (see below). Generally, the effect of load calculation is used in the calculation formula, that is, there is no load partial factor in the formula.
Q: Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Bowl buckle scaffold, called bowl buckle frameThe bowl buckle frame is composed of a steel pipe vertical rod, a cross bar and a bowl buckle jointStructure of bowl frame basic construction and erection requirements and fastener type steel tube scaffold is similar, the main difference lies in the bowl. Bowl buckle connector is a connector on the bowl, bowl buckle, bar joint and the upper bowl limiting pin etc. welding buckle under the bowl and the bowl buckle pin in the vertical rod, the bowl set into the pole in the
Q: Why does this discovery both confuse and frighten her?quot;The Scarlet Letterquot;
her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
Q: Standard Specification for steel tubes for ladder type scaffolding
1, multi function: the construction according to the specific requirements of different groups composed of frame sizes, shapes and bearing capacity of single and double row scaffolding, supporting frame, support columns, material lifting frame, climbing scaffolding, cantilever frame construction equipment and other function. Can also be used to set up construction shed, shed, lighthouse and other structures. The utility model is especially suitable for building curved surfaces and heavy load support frames.2, high efficiency: commonly used rod in the longest 3130mm, weight 17.07kg. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation.3, versatility: the main components are the use of ordinary fastener type steel pipe scaffolding, can be used with ordinary steel pipe connection, universal.
Q: Bowl buckle scaffold weight per meter
The longest component of the scaffold 3130MTM, the most reconstruction pieces 40.53KG.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords