• Steel Frame Formwork GK120 with Competitve Prices for Large Projects System 1
  • Steel Frame Formwork GK120 with Competitve Prices for Large Projects System 2
  • Steel Frame Formwork GK120 with Competitve Prices for Large Projects System 3
Steel Frame Formwork GK120 with Competitve Prices for Large Projects

Steel Frame Formwork GK120 with Competitve Prices for Large Projects

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Competitve Prices for Large Projects

 

Steel Frame Formwork GK120 with Competitve Prices for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of  Steel Frame Formwork GK120

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, 

     etc.by air/ sea, and we are VIP of these express.  

   .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7

    days.   

Q:i have a helix piercing on one ear and i now want a scaffold piercing on the same ear. i know the bar for the scaffold piercing won't go through the helix hole, but is it possible to get the piercing done underneath and if so does it really hurt? (thanks in advance)
of course. and yes.
Q:From the book quot; The Scarlet Letterquot;
He says no. ---- They're, Their, There - Three Different Words. Careful or you may wind up in my next novel. Pax - C
Q:Who can give me a bowl buckle scaffold acceptance form?
1) the fastener style scaffold frame structure in the erection of the part
Q:Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
Bowl button steel scaffolding is not commonly used, so the relative price of a little higher
Q:I really want to get an industrial piercing but I'm going to a music festival in about a month... If I get it done this weekend, will a month be time enough for it to heal, because I plan on being drunk for that whole festival so I doubt I'll find time to clean it haha..Should I get it done, or wait until after the festival?..Thanks :) x
it not to big a deal if you get it before, but if youre worried about keeping it clean than i would wait untill afterwards. cartledge pierceing can take anywhere from 6 months to 2 years to completly heal. plus it will be sensitive for quite a while and if youre going to be partying it may not be a good idea to have cuz you'll probably hurt it alot. you'd be surprised how many things your ear touches.
Q:The kind of hot galvanized scaffolding, many site use is very beautiful now, I would like to ask the material and the characteristics of this shelf there is how to install?
In use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Let me explain in the form of a picture
Q:how would you apply scaffolding into an example in history/geograpy
The US and other countries helping Haiti is an example of scaffolding which implies nations helping each other./
Q:a. Climb the stairs to join Hester and Pearl. b. Give an encore sermon. c. Reveal the meaning of life. d. Rise Up to heaven.
e. do his own homework Only joking. It's definitely d. Or c.
Q:Wheel buckle scaffolding rental price
3, according to the vertical pole lease (cross bar is not included), each pole 0.1~0.15 yuan / root / day. 4, according to the lease, 7~8 yuan / square. Time (time). The above is the reference price, the specific market prevail.
Q:How much is the adjusting range of the scaffold of the bottom
(3) is the key to the bottom assembly of bowl buckle scaffold, the assembly quality directly affect the overall quality in the installation bracket; the two layer horizontal bar, first check and adjust the level and the vertical frame is straight; secondly should check the level bar level, and by adjusting the vertical rod can be the adjustable base horizontal bar horizontal deviation less than L/400 (L is the horizontal rod length); inspect pole foot, ensure all pole under the pad, not vacant and loose; when the bottom shelf conforms to the erection requirements, check all the cuplok joint and locking, in the erection process at any time to check the the content, and make adjustment.(4) scaffording to strictly control the vertical rod vertical and horizontal rod level, the entire frame verticality deviation not more than h/500 (H is the height of the pole), but no more than 20mm; the horizontal rod level in accordance with the above provisions (3).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords