SIH:S hydraulic system Excavator SH160-5
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of excavator:
Excavators are heavy construction equipment consisting of a boom, stick, bucket and cab on a rotating platform known as the "house". The house sits atop an undercarriage with tracks or wheels. A cable-operated excavator uses winches and steel ropes to accomplish the movements. They are a natural progression from the steam shovels and often called power shovels. All movement and functions of a hydraulic excavator are accomplished through the use of hydraulic fluid, with hydraulic cylinders and hydraulic motors. Due to the linear actuation of hydraulic cylinders, their mode of operation is fundamentally different from cable-operated excavators.
Modern, hydraulic excavators come in a wide variety of sizes. The smaller ones are called mini or compact excavators. For example, Caterpillar's smallest mini-excavator weighs 2,060 pounds (930 kg) and has 13 hp; their largest model is the largest excavator available (a record previously held by the Orenstein & Koppel RH400) the CAT 6090, it weighs in excess of 2,160,510 pounds (979,990 kg), has 4500 hp and has a bucket size of around 52.0 m³ depending on bucket fitted.
The two main sections of an excavator are the undercarriage and the house. The undercarriage includes the blade (if fitted), tracks, track frame, and final drives, which have a hydraulic motor and gearing providing the drive to the individual tracks, and the house includes the operator cab, counterweight, engine, fuel and hydraulic oil tanks. The house attaches to the undercarriage by way of a center pin. High pressure oil is supplied to the tracks' hydraulic motors through a hydraulic swivel at the axis of the pin, allowing the machine to slew 360° unhindered.
Specifications of excavator:
Working Range
Arm length | 2.23 m | 2.62 m | 3.05 m |
---|---|---|---|
Boom length | 5.15 m | ||
A ( Max.digging radius ) | 8 670 mm | 9 040 mm | 9 380 mm |
B ( Max.digging depth ) | 5 660 mm | 6 060 mm | 6 490 mm |
C ( Max.digging height ) | 9 010 mm | 9 240 mm | 9 290 mm |
D ( Max.dumping height ) | 6 380 mm | 6 610 mm | 6 690 mm |
E ( Max.vertical wall cut depth ) | 4 720 mm | 5 080 mm | 5 220 mm |
F ( Min.front swing radius ) | 2 980 mm | 2 990 mm | 2 980 mm |
G ( Rear end swing radius ) | 2 450 mm | 2 450 mm | 2 450 mm |
Dimensions
SH160-5 | |||
---|---|---|---|
Arm length | 2.23 m | 2.62 m | 3.05 m |
A Overall length | 8 490 mm | 8 440 mm | 8 520 mm |
B Length from center of machine (to arm top) | 6 080 mm | 6 030 mm | 6 110 mm |
C Upper structure rear end radius | 2 450 mm | 2 450 mm | 2 450 mm |
D Center to center of wheels | 3 190 mm | 3 190 mm | 3 190 mm |
E Overall track length | 3 990 mm | 3 990 mm | 3 990 mm |
F Overall height | 3 000 mm | 2 960 mm | 3 130 mm |
G Clearance height under upper structure | 1 020 mm | 1 020 mm | 1 020 mm |
H Shoe lug height | 26 mm | 26 mm | 26 mm |
I Cab height | 2 930 mm | 2 930 mm | 2 930 mm |
J Upper structure overall width | 2 540 mm | 2 540 mm | 2 540 mm |
K Width from center of machine (left side) | 1 290 mm | 1 290 mm | 1 290 mm |
L Width from center of machine (right side) | 1 250 mm | 1 250 mm | 1 250 mm |
M Track gauge | 1 990 mm | 1 990 mm | 1 990 mm |
N Overall width | 2 590 mm | 2 590 mm | 2 590 mm |
O Std.Shoe width | 600 mm | 600 mm | 600 mm |
P Minimum ground clearance | 440 mm | 440 mm | 440 mm |
Q Handrail height | 2 950 mm | 2 950 mm | 2 950 mm |
Principle Specifications
SH160-5 | ||
---|---|---|
Base | Boom length | 5.15m |
Arm length | 2.62m | |
Bucket capacity (ISO heaped) | 0.62m3 | |
Std.operating weight | 16 900kg | |
Engine | Make & model | lSUZU AI-4JJ1X |
Rated output | 89.2kW/2200 min-1 | |
Piston displacement | 2999ml(cc) | |
Hydraulic System | Main pump | 2 variable displacement axial piston pumps |
Max. pressure | 34.3 Mpa | |
(with auto power boost) | 36.3 Mpa | |
Travel motor | Variable displacement axial piston motor | |
Parking brake type | Mechanical disc brake | |
Swing motor | Fixed displacement axial piston motor | |
Performance | Travel speed | 5.4/2.8 km/h |
Traction force | 161 kN | |
Grade ability | 70%<35º> | |
Ground pressure | 40 kPa | |
Swing speed | 11.5 min-1 | |
Bucket | 112 kN | |
/with power boost | 118 kN | |
Arm | 79 kN | |
/with power boost | 84 kN | |
Others | Fuel tank | 300 liter |
Hydraulic fluid tank | 90 liter |
Images of excavator:
FAQ of excavator:
Q: What are the main functions of excavators?
A: Excavator is the machine that can excavate the the soil of various types forcefully and then using hydraulic system a hydraulic force is generated and utilizing this force bucket is exchange with some other attachments then excavator can be used for multi-purpose. For exemple pile diver, hydraulic jack hammer etc...
Q: What are the main type of excavators?
A: Crawler excavator; Wheel excavator;
Q: What is the application of excavators?
A: The excavator has increased the work speed tremendously. It is used extensively in numerous fields, including the following:
•Wood removal in forests
•Normal grading work and landscaping
•Cutting of brushes with attachments
•Demolition of structures, and removal of debris
- Q: How much would it weigh without the wheels?Please include reference possible.Thank you!
- 385 Cat Excavator
- Q: i been playing the new moon map with my friends i know how to stop the excavator but in round 26 both excavators came down wich i tought there was not going to be any problem because on the next round i was going to stop both with the hacking device so we went te teletransport and went to area 51 than teletransport to the excavator station where you suppose to stop them i did stop both of them than changed my hacking device for the mask than i went to tunel 6 and the scavator was not all the way up so i went to tunel 11 and the same it was not all the way up idk why this happend so there was not a way to get to the dome where me and my firends camp and that was it we only made it to round 29.have this happend to you? why this happend?
- I had something similar once when I played with my friend. We couldn't find a way to get back to the dome, so we just decided it best to sacrifice a perk and let the astronaut guy hopefully teleport us to the other side of the excavators lol.
- Q: i have three questions.the first situation is:person A plays somethingperson B plays an instant in RESPOND to person A's creatureQEUSTION : can person A play a SORCERY in RESPOND to person B's instant?the second question:what is the difference between the LEGEND rule and the PLANESWALKER rule?the third situation:person A plays halimar excavatorperson A then plays a jwari to put it in as a halimarperson B responds to the jwari and plays path to exile(halimar removed)person A plays another jwari in response to path to exilemy assumption is that the last jwari played will come in as a halimar, then the one on the field will be removed due to path to exile. then the first jwari played will come in as a halimar since there is a jwari(halimar) on the field.is this correct since the text of jwari says come in to play as any ally on the battle field? (not targeting any allies on the battlefield)
- 1) No. Only Instants and abilities that function at Instant-speed (which most do) may be used when anything is on the stack. 2) The Legendary rule also applies to Planeswalkers,even though they aren't Legendary, but it is the same rule effectively. 3) No, just with answer 1, you cannot play creatures while anything is on the stack (unless the creature has the Flash ability). As such, the second Jwari could not be played, the Path to Exile would remove the Halimar, and the first Jwari would have no Ally to copy (unless there were others on the field you didn't mention), would be forced to enter as its 0/0 self, and immediately be sent to the graveyard as a state-based action.
- Q: It had dirt all over it and it was driving fast .It also have an excavator on it. I tried to take a pic but couldn't catch up :/ Has any one ever saw something like this?Why might they be moving it?
- Actually stuff like that does happen. Was there flooding in the area? Sometimes grave sites have to be moved due to physical changes in the natural landscape. I think floods are the big one. After all it's better to dig grandpa up and move him rather then find him floating down the river.
- Q: We are trying to find house plans for a new home and we want a daylght or walkout basement. We've been told that it would cost about $80.00 per sq ft. We are looking at plans that would have about 2,000 sq ft basement. That would be $160,000.00 just for the basement. Is this reasonable?
- NO!!!! That is not reasonable. Prices are different in geographical area's and the type of basement will affect the cost as well. No matter where you live you will require a survey company. They will take your plot plan and draw your house on in complying with your municipal set back ordinances. This is required for your permit as well. approx. $1200 After permit, they will stake out property for a excavator to dig the basement to bottom of footing height and/or 4ft below frost. In your case of a walk out basement, they walk out area (basement floor height and ground level are the same) will be 4 ft below grade. Your excavator should also trench and install sewer and water lines from street to basement. Their contract should include back fill. approx $2500 A cement contractor will install footings, and foundation. Here's where you need to pay attention to price and what you are receiving. They should include the water proofing in their installation price. There price is also reflected on size of home as well as wall height, and number of corners and footing steps. Materials should be supplied by them. For a 2,000 feet Sq. and 8ft concrete wall, cost should be no more than $30,000. This is thumb calculations. Even at 40,000 is still only 20/ft far away from 80 That's your basement. Your excavator will return to back fill and your ready to install the house
- Q: So when is my new dump truck and excavator going to fall out of the sky and into my lap so I can do gov work?
- the 1st 1000 government jobs would be as alternative tunnel helps alongside the northeastern turnpikes. as to your new unload truck and excavator, it is going to likely be mailed alongside with something of the bob the builder set, finished with a invoice for one trillion funds.
- Q: Where do I need the excavator?
- Luqiao company, mineral company wharf, municipal, afforestation, water conservancy, demolition,To carry out the project needs more local machines.
- Q: I need to know 7 different ways.
- Some tools used in mineral exploration: Remote Sensing (satellite imagery to find strucures and rocks lilely to contain mineral deposits) Geophysics (measuring small changes in natural phenomena to detect mineral deposits). Those in common use include magnetics, conductivity, gravity, radiometrics. Seismic (sound waves) to analyse sedimentary rocks when searching for oil and gas. Geochemistry: measuring metal content of soils and rocks to detect higher than normal levels which may indicate a mineral deposit. Geological mapping: looking at rocks and their relationships to find good targets for further exploration. Drilling: only way to truly test deeper mineral deposits: various types that either extract chips of rock or solid core of rock. Prospecting: working your way up a stream loking for concentrations of metals in gravels by panning: old school but still used!
- Q: Hi All,the scenario is..A compny wants to develop dbase to allow hiring of equipment to client. Company has 2types of equipment, power tools i.e drills and vacuums, and plants i.e. excavators and rollers. Power tools r decribed by model + voltage, plants r classified by model+ size in tonnes. Compny has various outlets, each outlet has staff including a Manager, and several Senior Technicians who are responsible for supervising the work of allocated groups of technicians. Each outlet has stock of equipment for hire that may be hired by clients for various periods of time, from a min of 4 hours to max of 6 months. Each hire agreement between a client and the company is uniquely identified by hire number. Client must take insurance cover for each equipment hire period. All equipment is checked for faults when returned by the client.Entities identified(are there any more?are any incorrect?): Equipmet Power Tools PlantsOutletSenior Technician TechniciansClientHire
- I okorder /
- Q: I need to know how much each of these costs. it's ok if you can only tell me a few but I'd like to know the cost of all of these.about 40 acres of land in colorado within 15 miles of a city.a 150' x 150' fence that's 6' high.an excavator. (to buy, not to rent)5 apple trees.5 orange trees.5 cherry trees.5 walnut trees.20 blueberry bushes20 strawberry bushes8 10' x 10' canvas tents.80 pine tree seeds.25 solar lights.10 koi fish.a nissan xterra.50 cubic feet of gravel.enough corn to plant a 10' x 10' land.enough lettuce to plant a 10' x 10' land.enough carrots to plant a 10' x 10' land.enough spinach to plant a 10' x 10' land.enough bell pepper to plant a 10' x 10' land.enough mint to plant a 10' x 10' land.enough watermelon to plant a 10' x 10' land.25 single person tents.a well.
- Your okorder /
Send your message to us
SIH:S hydraulic system Excavator SH160-5
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords