JCM921D Hydraulic Crawler Excavator, 21 tons, 0.9 m3 bucket
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 200 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
•It adopts originally imported Cummins B5.9 engine which features Tier 2 standards, energy saving, environmental care, and convenient service and maintenance;
•It adopts radial seal air filter with pre-filter which effectively prolongs engine life, with fuel filling pump and pressure transmitter as standard device for higher fuel economy.
•It adopts originally imported hydraulic parts, which features stable and reliable quality, and high efficiency;
•It adopts new type cab and seats, brand-new interior, and new air conditioning system with automatic adjustment function for comfortable operation;
•New generation electric control system: large color display capable of real time monitoring of machine operation condition, self-diagnosis and recording, electric throttle, and multiple work modes.
•Multiple kinds of buckets and optional parts like dozer blades, breakers, scarifiers, electromagnetic suction cups, quick couplers, etc. are available for digging, landfill, breaking, and grading operations.
•The multifunctional GPS can achieve remote control and data transfer so that the real time machine conditions can be known.
JCM921D HydraulicCrawler Excavator
TechnicalSpecifications
Engine | Travel System | |||||||||||||
Model | CUMMINS B5.9-C | Travel motors | JEIL, Variable axial piston motor | |||||||||||
Type | Water cooling, turbocharged, empty enter-cooling | Support roller quantities | 2×7 | |||||||||||
Carrier roller quantities | 2×2 | |||||||||||||
No. of cylinder | 6 | Travel shoes | 2×46 | |||||||||||
Bore and stroke | 102mm×120mm | Travel speed | 3.3/5.4km/h | |||||||||||
Displacement | 5.9L | Drawbar pulling force | 167kN | |||||||||||
Power output | 112kW/1950rpm | Grade ability | 70% (35°) | |||||||||||
Ground clearance | 470mm | |||||||||||||
Hydraulic System | Cab & Control | |||||||||||||
Pump | KAWASAKI, | Cab | All-weather, sound-suppressed Cab and equipped with a heavy, insulated Floor Mat; Front Window can be opened and slid; 6-direction adjustable Seat; LED display, Automatic monitoring, display and warning; cool & hot Air Conditioner | |||||||||||
Type | variable double–piston pump | |||||||||||||
Max. discharge flow | 2×208L/min | |||||||||||||
Max. discharge pressure | ||||||||||||||
Boom, arm and bucket | 31.9MPa | Control | Two hand levers and two foot pedals for travel Two hand levers for excavating and swing; Electric rotary-type engine throttle | |||||||||||
Travel circuit | 31.9MPa | |||||||||||||
Swing circuit | 25.5MPa | |||||||||||||
Control circuit | 3.9MPa | Boom, Arm & Bucket | ||||||||||||
Pilot control pump | Gear type | Boom cylinder | 120mm×85mm×1285mm | |||||||||||
Main control valve | Negative flow control | Arm cylinder | 135mm×95mm×1490mm | |||||||||||
Oil cooler | Air cooled type | Bucket cylinder | 115mm×80mm×1120mm | |||||||||||
Swing System | Refilling Capacities&lubrications | |||||||||||||
Swing motor | KAWASAKI, | Fuel tank | 360L | |||||||||||
Swing motor type | Axial-piston motor | Cooling system | 25L | |||||||||||
Brake | Hydraulic oil released | Engine oil | 20L | |||||||||||
Parking brake | Hydraulic disc brake | Hydraulic oil tank | 250L Tank oil level | |||||||||||
Swing speed | 11.5r/min | 420L Hydraulic system | ||||||||||||
Bucket | ||||||||||||||
Type | Backhoe bucket | |||||||||||||
Bucket capacity | 0.9m3 (SAE) | |||||||||||||
Bucket width | 1189mm | |||||||||||||
Arm Type | ||||||||||||||
A | Max. digging depth | 9281mm | ||||||||||||
B | Max. dumping height | 6480mm | ||||||||||||
C | Max. digging height | 6605mm | ||||||||||||
D | Max. vertical digging depth | 5735mm | ||||||||||||
E | Max. Depth cut for 2440m(8')Level Bottom | 6404mm | ||||||||||||
F | Max. digging distance | 9845mm | ||||||||||||
G | Max. digging radius at ground level | 9671mm | ||||||||||||
H | Min. swing radius of work equipment | 3500mm | ||||||||||||
Digging Force (ISO6015) Unit: kN | ||||||||||||||
Arm length | 2925mm | |||||||||||||
Bucket digging force | 115kN | |||||||||||||
Arm digging force | 92.5kN | |||||||||||||
Arm Type 2925mm | ||||||||||||||
A | Overall length | 9548mm | I | Tread | 3360mm | |||||||||
B | Ground contact length (Transportation) | 4947mm | J | Track length | 4160mm | |||||||||
C | Overall height(to top of boom) | 3073mm | K | Track gauge | 2200mm | |||||||||
D | Overall width | 2800mm | L | Track width | 2800mm | |||||||||
E | Overall height(to top of cab) | 2965mm | M | Shoe width | 600mm | |||||||||
F | Counter weight ground clearance | 1120mm | O | Bonnet height | 2375mm | |||||||||
G | Ground clearance | 470mm | P | Revolving frame width | 2726mm | |||||||||
H | Tail swing radius | 2905mm | Q | Distance from swivel center to tail | 2853mm | |||||||||
Operating Weight and Ground Pressure | ||||||||||||||
Operating weight includes basic machine (with boom 5.7m, arm 2.925m, and bucket 0.9m3) | ||||||||||||||
Shoe width | 600mm | |||||||||||||
Overall width | 2800mm | |||||||||||||
Ground pressure | 45KPa | |||||||||||||
Operating weight | 20500kg | |||||||||||||
- Q: What can an excavator do?
- More, go, dig the ground, repair the slope, dig trenches, dig the floor, build roads, load cars, and so on...
- Q: Will it be displayed on a small map of the enemy?If I had just dug a hole, the enemy would have seen it on the minimap, and how did I steal buff?
- To appear in the opposite view, the small map will always show purple fist, it seems that people can step on...
- Q: On my way home from work I avoid the busy highway by taking the quot;lonelyquot; roads. In one of the quot;farmsquot; or quot;ranchesquot; there is a big sign that read;quot;Free dump. Dirt onlyquot;I guess the dirt only part is because people may have been crapping on his/her property, but why would you want dirt and why and or whom would want or need to get rid of so much dirt?I always wonder about that sign, what could be the point?
- Someone already put the money in the pay toilet
- Q: excavator operator
- you will have great difficulty getting someone to sponsor you there are plenty of australian excavator operators in already in australia
- Q: Who discovered the tomb of King Tut-Ankh-Amun?
- fake. Christianity stems from a mix of Judaism and Greek Orphism in particular. There are some parrallels between the lives of Orpheus and Jesus, and Orphism replace into partly prompted by way of Egyptian theology because of fact it replace into stepped forward to a huge degree on Crete it quite is why there are some similarities to Horus. additionally comes from the geographical proximity of the two cultures and the probability of them sharing a straight forward delusion base, yet in actuality it quite is not actual.
- Q: Having a problem to find the caterpillar 3066 to my 320 Lexcavator so maybe there is a different engine to fit with the 717674 ARRG number.
- Are you sure it's not 3306?
- Q: During the winter , when there needs to be a burial , how is the grass and dirt in the cemetary shoveled up ? Isnt the mud too frozen for anyone to dig a 6 foot hole ?
- Backhoes, the machines that dig the holes, are powerful, can dig out the frozen soil in most cases with little problem.
- Q: the other owner has occupied the property up until june of 2012, then he went to prison his half he has a loan out of 152,000 dollars. We have occupied the house since he went to prison paying all the bills but he has not made payments on his loan, or payed the taxes as promised. when he went to prison he signed over all assets he has excavator's and log trucks the house is worth over 425,000 and he owes at least 80,000 grand in contract with us from payments we previously made.? we were served with a summons from the bank. Does Adverse possesion apply?
- You'll have to pay the loans because they used your house as collateral. Pay or lose the house. You can sue the other owner when he gets out of prison.
- Q: I am just desperate now! I am wondering if any ps3 people could help me get this trophy because i have tried countless times and am just sobbing that this is so hard(jk). so if any kind person who has gotten it or can help is willing to, I can get 3 of any answerers and we can all do it. ThanksSincerely,a very annoyed person at black ops's difficult trophies. :D
- it doesn't matter when it breaches, as long as it does it once. Step 1) when the power has been turned on, you'll need to play a game of Samantha says on the four computers in the outside area with no gravity, near the quick revive. Step 2) Hack one of the four buttons in the lab, this requires you to have found the hacking device that lays around various tables.
- Q: People Of The Hunting Section! I need some basic help. I sometimes do a bit of backwoods reloading on shotgun shells and I am trying to make a few door breeching rounds. The door is a 1/8quot; mild steel wrapped hollow door with inside hinges. I need a basic load / shot pattern to be able to penetrate the door and get it off the hinges. We have already tried to kick it down and only succeeded in a broken ankle. I was thinking of just turning either a copper or steel slug and just going at it, but I figure it would be worth some different opinions.Thank You!
- Load your shotgun round to the brim of Iron Dust and filings in the wad. When you shoot this (wear safety glasses) put your barrel about 6 inches where you want your hole. Fire and repeat. It is called a 12 Gauge Disentigrator. I'll post the link if you want to order it. Or you can try Tannerite.
Send your message to us
JCM921D Hydraulic Crawler Excavator, 21 tons, 0.9 m3 bucket
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 200 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords