SIH:S hydraulic system Excavator SH350HD-5/SH350LHD-5
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of excavator:
The two main sections of an excavator are the undercarriage and the house. The undercarriage includes the blade (if fitted), tracks, track frame, and final drives, which have a hydraulic motor and gearing providing the drive to the individual tracks, and the house includes the operator cab, counterweight, engine, fuel and hydraulic oil tanks. The house attaches to the undercarriage by way of a center pin. High pressure oil is supplied to the tracks' hydraulic motors through a hydraulic swivel at the axis of the pin, allowing the machine to slew 360° unhindered.
The main boom attaches to the house, and can be one of several different configurations:
Most are mono booms: these have no movement apart from straight up and down.
Some others have a knuckle boom which can also move left and right in line with the machine.
Another option is a hinge at the base of the boom allowing it to hydraulically pivot up to 180° independent to the house; however, this is generally available only to compact excavators.
There are also triple-articulated booms (TAB).
Attached to the end of the boom is the stick (or dipper arm). The stick provides the digging force needed to pull the bucket through the ground. The stick length is optional depending whether reach (longer stick) or break-out power (shorter stick) is required.
Specifications of excavator:
Working Range
Arm length | 2.63 m | 3.25 m |
---|---|---|
Boom length | 6.45 m | |
A ( Max.digging radius ) | 10 670 mm | 11 170 mm |
B ( Max.digging depth ) | 6 730 mm | 7 340 mm |
C ( Max.digging height ) | 10 320 mm | 10 370 mm |
D ( Max.dumping height ) | 7 140 mm | 7 230 mm |
E ( Max.vertical wall cut depth ) | 5 970 mm | 6 350 mm |
F ( Min.front swing radius ) | 4 630 mm | 4 500 mm |
G ( Rear end swing radius ) | 3 450 mm |
Dimensions
SH350HD-5 | ||
---|---|---|
Arm length | 2.63 m | 3.25 m |
A Overall length | 11 130 mm | 11 050 mm |
B Length from center of machine (to arm top) | 7 710 mm | 7 630 mm |
C Upper structure rear end radius | 3 450 mm | 3 450 mm |
D Center to center of wheels | 3 720 mm | 3 720 mm |
E Overall track length | 4 650 mm | 4 650 mm |
F Overall height | 3 500 mm | 3 260 mm |
G Clearance height under upper structure | 1 210 mm | 1 210 mm |
H Shoe lug height | 36 mm | 36 mm |
I Cab height | 3 130 mm | 3 130 mm |
J Upper structure overall width | 3 120 mm | 3 120 mm |
K Width from center of machine (left side) | 1 560 mm | 1 560 mm |
L Width from center of machine (right side) | 1 560 mm | 1 560 mm |
M Track gauge | 2 600 mm | 2 600 mm |
N Overall width | 3 200 mm | 3 200 mm |
O Std.Shoe width | 600 mm | 600 mm |
P Minimum ground clearance | 480 mm | 480 mm |
SH350LHD-5 | ||
---|---|---|
Arm length | 2.63 m | 3.25 m |
A Overall length | 11 130 mm | 11 050 mm |
B Length from center of machine (to arm top) | 7 710 mm | 7 630 mm |
C Upper structure rear end radius | 3 450 mm | 3 450 mm |
D Center to center of wheels | 4 040 mm | 4 040 mm |
E Overall track length | 4 980 mm | 4 980 mm |
F Overall height | 3 500 mm | 3 260 mm |
G Clearance height under upper structure | 1 210 mm | 1 210 mm |
H Shoe lug height | 36 mm | 36 mm |
I Cab height | 3 130 mm | 3 130 mm |
J Upper structure overall width | 3 120 mm | 3 120 mm |
K Width from center of machine (left side) | 1 560 mm | 1 560 mm |
L Width from center of machine (right side) | 1 560 mm | 1 560 mm |
M Track gauge | 2 600 mm | 2 600 mm |
N Overall width | 3 200 mm | 3 200 mm |
O Std.Shoe width | 600 mm | 600 mm |
P Minimum ground clearance | 480 mm | 480 mm |
Principle Specifications
SH350HD-5 | SH350LHD-5 | ||
---|---|---|---|
STD Specifications | |||
Base | Boom length | 6.45m (HD type) | |
Arm length | 3.25m (HD type) | ||
Bucket capacity (ISO heaped) | 1.40m3(HD type) | ||
Std.operating weight | 35 600kg | 36 100kg | |
Engine | Make & model | lSUZU AH-6HK1XYSS | |
Rated output | 202kw/2000 min-1 | ||
Piston displacement | 7 790 ml(cc) | ||
Hydraulic System | Main pump | 2 variable displacement axial piston pumps with regu-lating system | |
Max. pressure | 34.3 Mpa | ||
(with auto power boost) | 37.3 Mpa | ||
Travel motor | Variable displacement axial piston motor | ||
Parking brake type | Mechanical disc brake | ||
Swing motor | Fixed displacement axial piston motor | ||
Performance | Travel speed | 5.5/3.5 km/h | |
Traction force | 264 kN | ||
Grade ability | 70%<35º> | ||
Ground pressure | 72 kPa | 67 kPa | |
Swing speed | 9.8 min-1 | ||
Bucket | 229 kN | ||
/with power boost | 248 kN | ||
Arm | 164 kN | ||
/with power boost | 178 kN | ||
Others | Fuel tank | 580 liter | |
Hydraulic fluid tank | 350 liter |
Images of excavator:
FAQ of excavator:
Q: What are the main functions of excavators?
A: Excavator is the machine that can excavate the the soil of various types forcefully and then using hydraulic system a hydraulic force is generated and utilizing this force bucket is exchange with some other attachments then excavator can be used for multi-purpose. For exemple pile diver, hydraulic jack hammer etc...
Q: What are the main type of excavators?
A: Crawler excavator; Wheel excavator;
Q: What is the application of excavators?
A: The excavator has increased the work speed tremendously. It is used extensively in numerous fields, including the following:
•Wood removal in forests
•Normal grading work and landscaping
•Cutting of brushes with attachments
•Demolition of structures, and removal of debris
- Q:Hi Everyone! I desperately need help Finding this fic even the Title will do.Been looking everywhere for this fic but I just can't seem to find it.Summary:There is an explosion in the well house that buries the time portal. Kagome's mother tells her it will take two months before excavators can even come. In the rubble she finds a piece of stone from the bottom of the well that's been carved into;
- I assume the title is Hinatu. I can send you the fic in an e-mail.
- Q:perkins engine
- I know it is a 22 hp and only manufactured for england but the cc rating i don't know here is a cat site maybe you can find it
- Q:What oil does the excavator burn?
- 0 diesel.Diesel fuel is injected into the combustion, take some time, so is suitable for low speed make full combustion of fuel to bring large torque, and in order to fight in the cylinder of high pressure and large torque, diesel engine cylinder and piston rod parts than gasoline engine gasoline engine is strong, so the more cumbersome. But it is because of the high compression ratio, low speed characteristics, can better heat into kinetic energy, so the diesel engine has better thermal efficiency, that is, better fuel consumption performance.
- Q:What should we pay attention to when purchasing excavators?
- First is to consider the aftermarket and performance of these two factors. The machine does not always fail. Once it happens, we should consider how to repair it and recover the loss in time. If you buy Doosan, this situation will be solved. What I used is Doosan excavator. The excavator of this brand is cheap and easy for everyone to accept. Placed in its after-sale is also very secure, there are 374 offices, at any time for our service. To help us repair and maintain the machine, there is also worth mentioning that, from the purchase to the equipment work 20000 hours, there are 15 free inspection, so that problems are detected in a timely manner, and timely solution to protect the interests of our users
- Q:Can i house a leopard gecko on Excavator clay substrate if i put some rocks over it? like around the water and food bowls so that the clay doesn't get wet?
- You'd need to offer several humid hiding spots, but yes, I've actually set up leopard geckos on excavator clay before. Make sure you get it wet, sculpt it, and let it dry completely before putting them on it, but it'd work quite well for leopard geckos. Due to how dry it makes the cage, it's mandatory that you provide at least 2 humid hiding areas, though. -Jen
- Q:Normally Excavators are used for digging earth. But sometimes the operators use the bucket to lift materials .
- Typically no. It's a matter of safety. The object being carried can spill out of the bucket and injure someone. For heavy loads you use a forklift and the objects should be securely held on a pallet. For odd shaped objects a sling may be used but it must be inspected for nicks and tears prior to every use.
- Q:okay so my first question is, do you need the achievement from the DLC with the Shang gru la (or however it is spelled) zombies map in it? Also how.do you time the excavator perfect so the egg guy goes onto the satellite after you hit em
- So i be attentive to that map is particularly stressful with those escavators they ar set to random on the place they are going to hit yet you ultimate possibility is to make as plenty funds as you are able to by utilising the 2d or third around so which you will turn on the flexibility verify u save a crawler so u can play the sam says interest and even have the scientist do each thing yet whilst the escavators come and it does not hit corridor variety six only restart it because of the fact its going to in basic terms get extra sturdy in case you do the beginning up by utilising around 3 the escavator comes by utilising around six or seven I even have all of it carried out by utilising around 12 plenty extra perfect and much less puzzling in case you like halp I do supply help to those that want it I do it for acquaintances all the time I even have all the easter eggs my GT MATT TR0P0LIS the O's are zeros only message me in case you or everybody desires help
- Q:and lifting motions of the shovel why do you think the giant machines are designed with pulleys for these functions instead of hydraulics
- hydraulic rams are limited to the distance they can travel.. large cranes you see with cables are moving objects hundreds of feet where a hydraulic ram can not. hydraulic systems are much more dependable and can create a great deal of force in a small set up this is why you see them on most of your smaller construction machines.
- Q:please help
- Open-pit mining (as opposed to underground mining) has several advantages:- 1) Low cost of recovery - large trucks can enter the mine, get filled up with rock from a large excavator and drive away to the processing plant. 2) No need to leave stability pillars, necessary to hold up underground mine workings but which may contain valuable ore that is effectively lost to the mining company. 3) Ease of beneficiation - surface mines are usually composed of materials (oxides in the case of metalliferous mines) that are easier to handle and easier to treat in order to recover their marketable product as a result of being so close to surface. 4) Safer environment - so much less problem of rock falls, hanging wall collapse resulting in a lower injury rate than in underground mine.
- Q:1.) What is another name for miners? (besides miners)2.) Where was gold first found?3.) Southern tip of South America which ships had to travel around to get to California
- 1. Excavator, collier, prospector, sapper. 2. Probably Egypt, more than 5000 years ago. 3. Cape Horn
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
SIH:S hydraulic system Excavator SH350HD-5/SH350LHD-5
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords