Earthmoving Machinery >> Excavator >> TME644E
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 150 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Description
1. Excellent Operation
The multi-function digital color monitor panel together with electromic fuel control allow the operator to select the best setting for a wide range of operations and hence maximising operatiing efficiency.
2. Ease of Maintenance
Service points are easily accessible for operator and service personnel. Centralised greasing for work equipment is standard equipment.
3. Superior Structure
The superior structure allows multiple work equipment configurations for wide range of applications.
4.Heavy Duty Undercarriage
The Heavy Duty Long Crawler(HDLC) undercarriage is standard equipment on crawler excavator. HDLC undercarriage offers longer life, lower ground pressure and improved stability for all applications.
5. Operation Comfort
Adjustable operator seat for best operating position and comfort for operator. High capacity air-conditioner provides comfortable operating environment. Pilot actuated low effort controis designed for long hour operation and reduces operator fatigue.
6. Safety
High visibility cabin with pull up front window for better viewing and ensures safe operation. Get in and out of the cabin and upper service area sfaely with the large hand rails. Emergency escape hatch is standard equipment for crawler excavator.
7. High Performance and Reliable Components
Industry proven high torque 6 sylinder diesel engine coupled with a reliable variable displacement hydraulic pump and load sensing hydraulic system ensure high performance and reliability.
Model | TME644E | |
Operation Weight | Ton | 44 |
Standard Bucket Capacity | m³ | 2 |
Diesel Engine Manufacturer | Cummins | |
Engine Model | QSM11 | |
Engine Power | KW | 250 |
Hydraulic Flow Rate | L/MIN | 2x360 |
Hydraulic Pressure | Mpa | 30 |
Travelling Speed | Km/h | 2.9-4.9 |
Grade Climbing Capacity | % | 65 |
Slewing Speed | r/min | 9 |
Stick Digging Force | kN | 169 |
Bucket Digging Force | kN | 198 |
Overall Length | mm | 12035 |
Overall Width | mm | 3350 |
Overall Height of Boom | mm | 3610 |
Overall Height of Cab | mm | 3200 |
Overall Height to Engien Cover | mm | 2820 |
Counterweight Clearance | mm | 1295 |
Ground Clearance | mm | 496 |
Upperstructure Width | mm | 3100 |
Rear End Swing Turning Radius | mm | 3670 |
Overall Track Length | mm | 5235 |
Center Pitch Length of Track Trame | mm | 4235 |
Gauge Width | mm | 2750 |
Track Width | mm | 600 |
Ground Pressure | Mpa | 0.085 |
Stick Length | mm | 3300 |
Maximum Cutting Height | mm | 121995 |
Maximum Dumping Height | mm | 8725 |
Maximum Digging Depth | mm | 7745 |
Maximum Reach | mm | 12090 |
- Q: How is this machine all around ? What else is in same circuit as the drive motor ? Thank you very much !!!!!
- No idea sorry,but i searched for 30 minutes for an answer...
- Q: Compare the objects and scenes:cameraexcavatorcourt sceneblue boxambulanceBased on the stuff above, explain how all systems are similar...
- The only similarity is that all require light to be able to be seen.?
- Q: y does my electric yellow always dig massive holes? i recently switched to a planted tank with fine graval and now he diges holes and its very annoying. is there any way to get him to stop and maby take his mind off of it. its amazing how much rock he can move overnight. hes like a excavator lol.
- Like other have stated the digging is do to spawning. To get them to stop you need to use larger gravel. If you want them to spawn it is best to use arganite or sand instead. But to get them to stop you need to use pea gravel wish is about 3/8 - 1/2 inch in size. You can have a planted tank but you need plants with well established root systems. PK
- Q: I remember some live-action show or movie on the Disney channel from a long time ago (roughly 20 years), and there was a group of kids who'd thought that there was a tyrannosaurus rex in this swamp, but it turned out to just be something like a caterpillar excavator.What an excavator would be doing in operation while being covered with moss and swamp much, I have no idea, but apparently that was going on in this series or movie. Anyway, it's bothered me for quite some time now... :)Anyone know what it is?
- Could be Frog Dreaming from 1986.
- Q: How do they ventilate subway tunnels when they are building them? Obviously they cant use just electric vehicles to create stations and tunnels. TBMs are electric but they must use excavators, loaders, etc when building stations beneath the surface. How do they ventilate these tunnels?
- There is a fan plant built next to an access shaft. The fans blow fresh air through the duct that runs down the shaft and into the tunnel, suspended from the tunnel's arch, all the way to the TBM. As the TBM advances, workers add new sections of the duct. The air then flows through the tunnel back to the access shaft. The section of the NYC's Third Water Tunnel I've been to, used very little engine powered heavy equipment. The train that brought workers and supplies to and from the TBM run on the CNG. Everything else run on electricity.
- Q: Which brand is good for excavator?
- The man upstairs is detailed enough. Buy a brand car, those who have never heard of it, then buy parts are not good to buy,
- Q: I purchased a S corp thru a stock purchase agreement. Included in the corporation were 2 tractors and an excavator. Can I write-off any of my purchase price of this corporation? Tractors and excavator? They are part of the corporation.
- You can depreciate them over their remaining useful lives at their market value when purchased.
- Q: What does Caterpillar excavator have to do with cat shoes?
- CAT is an old brand in the United states. A good brand.Climbing shoes and casual shoes.
- Q: I am buying a home that has a large shed in the back. The loan is FHA and the appraiser requires it be torn down or repaired. This is an old shed close to 100 years old and was built with all 2x4s with many rotting pieces so fixing it would cost the same as rebuilding a new one. The shed is approx 15x24 in an L shape. I'm working with a contractor for the other repairs and he quoted me at $7,500 for a full demo, I said leave the floors and he brought it down to $5,500. This seems like a rather large amount especially looking around online I was expecting 2-3k at most. Is his quote realistic? Im under a deadline so I had him write it up but I most likely will do it myself or find someone with a excavator to come in and just crush it.
- Cheaper to rent a mini bulldozer and drive it thru yourself Is the contractor also charging for waste removal in that cost ? Then it might be reasonable Hard to say without knowing your city. You could call your local dump and see what they charge for construction debris It would be per ton and if there is a slab of concrete under the structure then costs might be reasonable I would call other contractors for estimates good luck Lr
- Q: Hi All,the scenario is..A compny wants to develop dbase to allow hiring of equipment to client. Company has 2types of equipment, power tools i.e drills and vacuums, and plants i.e. excavators and rollers. Power tools r decribed by model + voltage, plants r classified by model+ size in tonnes. Compny has various outlets, each outlet has staff including a Manager, and several Senior Technicians who are responsible for supervising the work of allocated groups of technicians. Each outlet has stock of equipment for hire that may be hired by clients for various periods of time, from a min of 4 hours to max of 6 months. Each hire agreement between a client and the company is uniquely identified by hire number. Client must take insurance cover for each equipment hire period. All equipment is checked for faults when returned by the client.Entities identified(are there any more?are any incorrect?): Equipmet Power Tools PlantsOutletSenior Technician TechniciansClientHire
- I okorder /
Send your message to us
Earthmoving Machinery >> Excavator >> TME644E
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 150 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords