Kwikstage Scaffolding System galvanised
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Material: | Surface: | |||
Color: | Size: | Length: | |||
Thickness: | Standard: | kwikstage Scaffolding: | |||
Stable: |
Packaging & Delivery
Packaging Detail: | in bulk or pallet according to customer's requirement kwikstage Scaffolding system standard |
Delivery Detail: | no more than 15days |
Specifications
Best price kwikstage scafffolding
Good bearing capacity .
Used time long .
Very good stability .
Covenient to transport
Kwikstage system
1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Our capability
Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch press,3sets 300t punch press
Produce Technology: stamping/pressing/forging;
Produce Capacity: 500 tons/month
Output: 3000 pcs/day couplers,3000pcs steel plank
Specification
1.Standard:
Thickness(mm):48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0
Length(mm):500/1000/1500/2000/2500/3000/3500/4000
2.Ledger:
Thickness(mm): 48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0
Length(mm):1200/1800/2400
3.Transom:
50mm*50mm*5mm thickness steel angle
Length(mm):600/800/1200/1800
4.Brace(diagonal)
size:48.3*2.5mm thickness steel tube Length(mm): 1830/2750/3530/3660
5.Bace Jack:
Solid Base Jack:38mm(diameter)*650mm (length)or as your request
Hollow Base Jack: 38mm(diameter)*4/4.5/5/6mm(thickness) or as your request
size for reference
Kwikstage Items | Length(mm) | Steel Grade | Theoretical Weight(kg) |
Standard w/o spigot | 3000 | Q235 | 17.5 |
Standard w/o spigot | 2500 | Q235 | 14.5 |
Standard w/o spigot | 2000 | Q235 | 11.5 |
Standard w/o spigot | 1500 | Q235 | 8.5 |
Standard w/o spigot | 1000 | Q235 | 6 |
Standard w/o spigot | 500 | Q235 | 2 |
Ledger 3.2mm | 2400 | Q235 | 9.26 |
Ledger 3.2mm | 1800 | Q235 | 7 |
Ledger 3.2mm | 1200 | Q235 | 5 |
Ledger 3.2mm | 760 | Q235 | 4.3 |
Transom 5.0mm | 2400 | Q235 | 22 |
Transom 5.0mm | 1800 | Q235 | 13.5 |
Transom 5.0mm | 1200 | Q235 | 9.6 |
Transom 5.0mm | 1000 | Q235 | 8 |
Transom 5.0mm | 760 | Q235 | 6 |
Ladder Access Tran | 2400 | Q235 | 11.6 |
Ladder Access Tran | 1800 | Q235 | 15.3 |
Ladder Access Tran | 1200 | Q235 | 24 |
3 Board Stage Bracket | 3000 | Q235 | 9 |
2 Board Stage Bracket | 2000 | Q235 | 6 |
1 Board Stage Bracket | 1000 | Q235 | 2.5 |
Tie Bar | 2400 | Q235 | 7 |
Tie Bar | 1800 | Q235 | 5 |
Tie Bar | 1200 | Q235 | 3 |
Tie Bar | 760 | Q235 | 2.1 |
Double Coupler | Q235 | 1.25 | |
Swivel Coupler | Q235 | 1.25 | |
51mm Double Coupler | Q235 | 1.3 | |
51mm Swivel Coupler | Q235 | 1.3 | |
Putlog/Single Coupler | Q235 | 1 | |
Girder Gravelock Coupler | Q235 | 1.5 |
- Q: While standing on a long board resting on a scaffold, a 80-kg painter paints the side of a houseIf the mass of the board is 16 kg, how close to the end can the painter stand without tipping the board over?
- good one babe. Heres yet another for ya An airline captain became into breaking in an rather notably new blonde stewardess. The direction they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning by fact the pilot became into making waiting the team for the day's direction, he observed the hot stewardess became into lacking. He knew which room she became into in on the inn and called her up questioning what got here approximately to her. She responded the telephone, crying, and pronounced she could not get out of her room. you are able to not get out of your room? the captain asked, Why not? The stewardess responded, There are basically 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that asserts 'do not Disturb'!
- Q: A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 200 N and is 3.00 m long. What is the tension in each rope when the 700 N worker stands 1.00 m from one end?Please help me.
- Draw the picture ie Free Body Diagram ALWAYS!! Sum Fx = 0 Sum Fy = 0 Sum Moments = 0 Take moments about one end. I choose the left end and put the window washer 1 m from the left end.====> Tension in left rope goes through the left end ==> lever arm has length=0 ===> moment from left rope = 0 Moment from window washer: 1 m * 700 N = 700 N-m clockwise Moment from weight of scaffold: 1.5 m * 200 N = 300 N-m clockwise (Center of gravity in center of scaffold) Your question says 190 N your question statement says 200 N. NOTE I solved for 200 N Total clockwise moment 700 + 300 = 1000 N-m CW Right rope must supply that Lever arm = 3 m * 1000 N-m = 3m * T T = 333.33 N UP Total force down = 200 + 700 = 900 N ===> Tension in left rope: 900 - 333.33 = 566.67 N
- Q: what were the three most important scenes that happened on the scaffold in the novel, The Scarlet Letter?
- the woman's punishment trial, the minister admitting he was the girl's father, and his death.
- Q: What is a scaffold builder? What do they do?
- Well, I know that a scaffold is a platform that gets raised and lowered with ropes. Workers use it to get up high to clean windows or paint or something else. There are bars on the sides so they have a place to hold onto.
- Q: I need to reach my very high ceiling. Where can I rent scaffolding?
- Menard's or home depot
- Q: In The Scarlet Letter
- Your question is not a special ed question. Your question belongs in homework help.
- Q: the methods early scientists used to measure sizes and distances within the solar system, explain the technique Eratosthenes used to measure the circumference of the Earth more than 2,000 years ago. how do all these discoveries demonstrate the scaffolding of knowledge? and there are other parts i have already im just stuck on this!!
- Each generation build it's knowledge or the previous one. In simple words your father teaches you. You make it better Then you teach the better method to your son We learned to take cover in caves, then we learned to build huts and then we learned to build houses and then build skyscrapers. Hope this is what you wanted.
- Q: I have a converted attic bedroom and the part where the wall meets the ceiling over the stairs is unreachable without scaffolding. It's over stairs so you can't just put a ladder under it. I hired someone to paint it the current color, but I will probably need to re-paint it soon and I am hoping to be able to rent something that I can adjust the legs to put on stairs that I can paint it myself. Any advice would be helpful
- If you don't already have one, you should go out and buy a Lttle giant type lader. Almost any home center has them at reasonable prices. They come in several sizes and are user friendly. I am pro painter and come across stairs frequently. I am able to accomplish most jobs with my adjustable ladder.Many times it loks a lot more involved than it actually is. These ladders are real easy to use once you've tried them.
- Q: At the moment i have a plastic bar with metal balls, its flexible and she said she would change it between six to eight weeks!I only got my piercing 3 days ago if that and i just want to know why a long period of time to get it changed? Ive had my tongue done and she changed that within a week .. Just seems a really long time!
- The mouth is the fastest healing area of the body. Cartilage has many layers to it and because of that it takes the fistula longer to form.
Send your message to us
Kwikstage Scaffolding System galvanised
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords