kwikstage scaffolding end toeboard bracket
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Style: | Standard:: | Place of Origin:: | |||
Brand Name:: | Standard Material:: | Note:: | |||
Unit Weight:: | Advantage:: | Length:: | |||
surface:: |
Packaging & Delivery
Packaging Detail: | as the requirment of clients |
Delivery Detail: | 15~20 days after receiving payment |
Specifications
steel scaffolding Kwikstage System End Toe Board Bracket
1.For South Africa
2.Surface:painted or galvanized.
steel scaffolding Kwikstage System End Toe Board Bracket
Product Description:
KWIKSTAGE is a heavy duty modular scaffold system which is the most common method of access today for work at heights.
Standard |
|
|
|
Description | Model No. | Weight |
|
9'10" | KSS-S-3000 | 38.45LB |
|
8'2" | KSS-S-2500 | 32.45LB |
|
6'7" | KSS-S-2000 | 26.28LB |
|
4'11" | KSS-S-1500 | 20.10LB |
|
3'3" | KSS-S-1000 | 13.93 |
|
Standards are the vertical load-carrying members and | |||
are made from 1.9"O.D.x0.157"thickness high grade | |||
steel tube. All standards incorporate lower fixed | |||
cups at 19-11/16" interverals. Vertical connection | |||
is made by means of 6-1/2" spigot. |
| ||
|
|
|
|
|
|
|
|
Ledger |
|
|
|
Description | Model No. | Weight |
|
10' | KSS-L-3050 | 25.70LBS |
|
9' | KSS-L-2745 | 23.30LBS |
|
8'6" | KSS-L-2590 | 22.10LBS |
|
8' | KSS-L-2440 | 20.88LBS |
|
7' | KSS-L-2130 | 18.43LBS |
|
6' | KSS-L-1830 | 16.05LBS |
|
5'2" | KSS-L-1570 | 14.00LBS |
|
4'11" | KSS-L-1500 | 13.45LBS |
|
4' | KSS-L-1220 | 11.24LBS |
|
3'10" | KSS-L-1150 | 10.67LBS |
|
3'6" | KSS-L-1065 | 10.00LBS |
|
3' | KSS-L-910 | 8.78LBS |
|
2'2" | KSS-L-650 | 6.72LBS |
|
2' | KSS-L-610 | 6.42LBS |
|
Diagonal Brace |
|
| |
Description | Model No. | Weight |
|
10' | KSS-DB-3050x2000 | 23.96LBS |
|
9' | KSS-DB-2745x2000 | 22.60LBS |
|
8'6" | KSS-DB-2590x2000 | 21.85LBS |
|
8' | KSS-DB-2440x2000 | 21.21LBS |
|
7' | KSS-DB-2130x2000 | 19.91LBS |
|
6' | KSS-DB-1830x2000 | 18.76LBS |
|
5'2" | KSS-DB-1570x2000 | 17.84LBS |
|
4'11" | KSS-DB-1500x2000 | 17.68LBS |
|
4' | KSS-DB-1220x2000 | 16.80LBS |
|
3'10" | KSS-DB-1150x2000 | 16.60LBS |
|
3' | KSS-DB-910x2000 | 16.07LBS |
|
2'2" | KSS-DB-650x2000 | 15.60LBS |
|
- Q: Ive had it for over a year now and everything was fine. Ive recently had trouble sleeping on it and its got a bit of puss / liquid coming out (not much) it hurts to touch at the moment but is not red or swollen. Ive changed it to 2 seperate labrets for now to see how that works.It doesnt look like its moved but I am still worries!Thanks all!
- If its not moving its not rejecting, but puss coming out isnt a good sign. Are you sure its not infected? If the puss smells and its itchy you could be on your way to an infection, the redness and swelling could come soon. Start cleaning it daily again (assuming youve stopped) and hope for the best! Good luck:)
- Q: Is scaffolding related to teaching your toddler to share?
- Scaffolding typically relates more to cognitive development, while learning to share is a social-emotional development issue. Scaffolding is kinda like when a child is almost ready to do a skill, and they are able to learn how to do it and complete it by observing other children do it. Most toddlers really aren't emotionally ready to share. They need to be able to grasp the concept of ownership first. And since they have a poor concept of time, taking turns at something is also beyond them - they can't comprehend that they will get a turn later.
- Q: How to measure production rate of Scaffolding for 39m dia x 20m Height?
- hello, the scafolding design should be available for this, and simply measure the amount of completed indvidual scafolding. usually, the scafoldings are done layer by layer, to enable the workers to go up there and make the fittings, i believe that such medium size scafolding would at least be produced as two layers per day (if about 1.5 meters for scafolding height separation it would take maximum of 6 working days) i hope i got you a simplification
- Q: i've been wanting a piercing, and i wasn't sure whether an eyebrow or a scaffold was gay or not for guys?
- Piercings, just like haicuts, clothing and anything else anyone wants to throw in there does not have any bearing whatsoever on a person's sexuality.
- Q: what is the name of the lift cart to get to the 2nd story from the exterior like for example to clean windows instead of using a ladder its like a small car with a bed at the top and then you step inside and it lifts you up . or what other electronic card do you recommend other than the regular home depo scaffold
- do u mean a cherry picker or a scissor lift, diffrence being a cherry picker you can take it on the roof and move about the roof, scissor lift will take u up 2 the roof then you just walk off scissor lift on 2 roof. i done my courses 4 these 2 the sciossor lift is easier 2 learn but the cherry picker get u all over the roof 2 an extent. hope ive helped pal.
- Q: Thinking of getting one:)
- Mine didn't hurt too bad. Not nearly as much as I thought it would. The first hole didn't hurt very much, but after my adrenaline was used up, I felt more with the second hole. It was a lot of pressure and then the shove through for both. It's well worth it though for a couple of minutes of pain. The worst part was learning not to sleep on it and trying to keep the keloids away! :)
- Q: I got mine pierced a while ago, i need to put a clear one in for work etc.But i can't remember the length of it?Is it 16mm/18mm or larger?
- Length depends on your ear size. Most are 1.25(1.25 in = 3.17500 centimeters). The standard gauge size is 14 so depending on your ring gauge size you have now will determine which gauge size bar you need.
- Q: Physics tension - A 100kg man stands 1m from the end of a 4m long scaffold which weighs 750N. what are the mag?
- I'm guessing you want the values of the forces at the supports which I'm assuming are on the ends So sum moments about one end 100*9.8*1 + 750*2 - FB*4 = 0 so FB = (980 + 1500)/4 = 620N Sum vertical forces FA + FB - 100*9.8 - 750 = 0 so FA = 980 + 750 - 620 = 1110N
- Q: I have to write a poetry explication for this poem!HELP!!
- This Site Might Help You. RE: poetry explication for quot;Scaffoldingquot; by Seamus Heaney? I have to write a poetry explication for this poem! HELP!!
Send your message to us
kwikstage scaffolding end toeboard bracket
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches