• Scaffolding Parts Jack Nut White Zinc System 1
Scaffolding Parts Jack Nut White Zinc

Scaffolding Parts Jack Nut White Zinc

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Place of Origin:  China (Mainland)  

Thread:  Casted or Machine tap

Surface:  White Zinc

Material:  ductile iron

Type:  casted

 

Packaging & Delivery of Scaffolding Parts-Jack Nut :

Packaging Detail: Bag or Pallets

Delivery Detail: Meet customer needs

Specifications of Scaffolding Parts-Jack Nut:

34mm scaffolding jack nut

1. Ductile iron, dia.34mm

2.Thread pitch: 6.35mm or 10.0 mm

3.Weight:0.43kg,galvanized.

34mm Scaffolding jack nut

Very Good Casted Manufacturing Ability for All types of casted Nuts:

The professional and experienced manufacturer for all types of cast iron jack nut, wing nut, prop nut...etc

1. Material: Ductile iron

2. Sizes: Dia 34 mm

3. Weight: 0.43kg

4. Surface: Electro galvanized

5. Screw thread Pitch: 6.35mm or 10.0mm

6. Thread: Machine Tap (or casted thread)

7. Type: all types of Wing nuts, jack nuts, heavy duty jack nut, wing nut, prop nut

8. Quality Control for Large amount production to Ensure  Good Quality Products.

Quality controls:

Materials: grey iron ductile iron GG20 GGG50

Processes: sand & investment casting

Machining: Machining services are available

1.Machinery properties and chemical components testing after raw casting

2.Hardness checking after heat treatment

3.Dimensions testing after machining

4.Full machining, primer painting and surface treatment

 


Materials:

grey iron ductile iron GG20 GGG50

Processes:

sand & investment casting

Machining:

Machining services are available

Quality controls:

1.Machinery properties and chemical components testing after raw casting

2.Hardness checking after heat treatment

3.Dimensions testing after machining

4.Full machining, primer painting and surface treatment

Services:

custom-made services are available



Q: What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q: The difference between the scaffold and the scaffold
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
Q: Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q: What is an integrated climbing frame? What are the works? What are the advantages
The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords