Recyclable Constructional Aluminium Shuttering Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 m²
- Supply Capability:
- 60000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Aluminum Form Work Brief Introduction :
Aluminum Formwork is widely used in highway,railway,bridge,tunnel and shearing wall,etc. It is with light weight and smooth for surface concrete and popular in constructions .
2.Characteristic for Wholly Steel Formwork :
1) High Smooth Surface
2) Convex ling for Edge Rib
3) Specialized Connection Pin for Edge Rib Connection
4) High Stiffness for Aluminum Surface
5) Light Weight for saving producing cost
6) Fast Separate and Easy transport
7) Recycling using
3. Aluminum Formwork Specifications:
1) Maximum Column Size:900 x 900mm (2’-11.5”x 2’-11.5”)
2) Design Concrete Pressure: 1,800 psf (90 kN/m2)
3) Standard Panel Width 900mm, 750mm & 600mm (2’-11.5”,2’-5.5” & 1’-11.5”)
4)Standard Panel Height: 3.0m, 2.4m, 1.2m
4. Factor & Product Photos :
5. FAQ
1) What is the payment terms in our Company ?
Generally TT, LC At Sight, West Union , Moneygram . Besides , we can accept LC After Sight , DP etc.
2) Packing For Aluminum Formwork.
Nude or Pallet for Big Formwork and the Accessaries in PP bags.
3) Quality Guarantee
We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .
4) After Sales Service
We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .
5) Time of Delivery
We can overdo work for the customer to make sure the fast shipment
- Q: What is the development prospect of aluminum template design?
- Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
- Q: In the Sheng-aluminum template installation workers, how to develop prospects
- First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
- Q: What is the change in the aluminum template?
- Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
- Q: Now the domestic use of aluminum template project more?
- Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
- Q: Whether a shear wall aluminum template and wood template can be mixed
- Wood molds are low in strength, poor in stability, low profile, low precision, high water loss, high maintenance requirements when the mold surface is released, the time is fixed, the mold time is late and the load capacity is small.
- Q: Aluminum template of the aluminum template advantage characteristics
- Standard, versatility. Aluminum template specifications, according to the project using different specifications of sheet metal assembly; use of the template to transform a new building, just replace the 20 or so non-standard board, can reduce costs.
Send your message to us
Recyclable Constructional Aluminium Shuttering Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 m²
- Supply Capability:
- 60000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords